Category: New York
The Wrong Kind of Branching
Transit lines branch. Core routes have more demand than outlying ones, so naturally trains and buses run on trunk lines in the core and then branch farther out, to match frequency to demand. I gave an overview of this years ago. This is both normal across nearly all significant transit systems, and good practice. In this post, I’d like to focus on the opposite kind of branching, which I am going to call reverse branching, when one outlying line splits into two core routes. This is much less common, but exists in multiple cities, and leads to problems including restrictions on capacity and disappointing ridership. Cities should avoid building new lines that reverse branch, and in one famous existing case, London’s Northern line, the city is working on changing the situation by building a new outlying branch.
London’s Northern line, as can be seen on the Underground map, has three branches to the north and two in the center, but just one to the south. The highest ridership demand is in the center, but because both branches feed into just one southern branch, there is less than full capacity on the central branches, about 20 trains per hour each, compared with 30 tph on the southern branch and 33 tph on the Victoria and Jubilee lines. As a result, Transport for London has made recurrent plans to split the line for good: one central branch (through the City of London) using the existing southern branch and two of the northern ones, and one (through Charing Cross) using one northern branch and terminating at Kennington, the junction with the southern branch. An under-construction extension of the line from Kennington to Battersea can then be tied to the Charing Cross branch. There is some NIMBY opposition from a member of Parliament representing a constituency on one of the northern branches, who would like her constituents to have one-seat rides to both branches, but most likely, Transport for London’s need for capacity will make the split inevitable once the Battersea extension opens, ending the reverse branching practice.
In New York, routes branch and recombine, and thus it is common to have trains of different colors (which only denote Manhattan trunks) running together on a branch in Brooklyn, Queens, or the Bronx. The single busiest entry point into the Manhattan core is via 53rd Street Tunnel (connecting to Queens Boulevard), technically a branch since it runs trains connecting to both the Eighth and Sixth Avenue Lines. This, again, causes capacity problems. It’s not so bad on the numbered lines, where four trunk tracks (the Manhattan express trunks, carrying the 2/3 and 4/5) recombine in a different way to four tracks in Brooklyn (pairing the 2/5), but the lettered lines’ reverse branching in Uptown Manhattan and Queens initially forced eight trunk tracks (the Sixth and Eighth Avenue services, the B/D/F and A/C/E) to converge to six branch tracks (the two Queens Boulevard express tracks via 53rd, and the four Central Park West tracks). New subway connections have replaced this situation with twelve trunk tracks (including the Broadway Line’s N/Q/R) splitting to ten, spreading the problem around but not dealing with the fundamental restriction on capacity. The under-construction Second Avenue Subway will connect to the Broadway Line and run Q trains, raising the number of lettered tracks Uptown and in Queens to twelve, but this will not be enough to disentangle the tracks and provide full capacity on each core track; see below for proposed examples.
In Delhi, the Green Line splits into short branches, to provide transfers to two different Metro trunk lines. As seen on the system map, the Green Line does not enter central Delhi, and the current setup allows passengers to travel to central Delhi via two different routes. However, the Phase 4 extension plan extends the one branch to go out of the city in a V-shaped direction (the light green Kirti Nagar-Dwarka Section 28 line on this map), and has an extension that may connect to the other branch (Inderlok-Indraprastha, colored ocher on the map) to connect it to central Delhi, which may cause a serious mismatch in demand on the outlying common segment.
Finally, in Tokyo, subway lines reverse branch in two locations. The Namboku and Mita Lines share their southernmost three stations and the tracks in between. Although most Tokyo subway lines, including Namboku and Mita, run through to commuter lines, which provide the normal kind of branching, the Mita and Namboku Lines only do so either to the north or via the shared segment, as seen on this map, constraining capacity. They run only 12 peak tph each, and have low ridership by Tokyo subway standards. The Fukutoshin and Yurakucho Lines are in a similar situation, but the Fukutoshin Line does run through to a commuter line, the Tobu Tojo Line, without going through the shared segment (it is not depicted on the map, which is a few years out of date). The Fukutoshin Line has low ridership (see last page here), but the Yurakucho Line does not.
In all examples I’ve listed so far, the two core branches serve very central areas (as in London, New York, and Tokyo), or neither of them does (as in Delhi). Tokyo is somewhat of an exception, since the Yurakucho and Mita Lines serve Central Tokyo and the Fukutoshin and Namboku Lines serve secondary centers, but those secondary centers are very dense themselves; the Mita and Namboku Lines in particular are quite close in ridership. I am more wary of proposals to split an outlying line in the core that have one branch serving the CBD and one branch avoiding it, as in Delhi, assuming I understand the proposal correctly.
Also of note, all the examples I’ve listed involve subways. This is because conventional branching, with a core trunk splitting into multiple outlying branches, is more limited on urban rail than on both buses and regional rail. Most subway lines do not have more than two branches feeding into a trunk. In New York, not counting the split in the A, which is inherited from the LIRR, there is exactly one place where three subway routes share tracks: the N, Q, and R from Manhattan to Queens. In Stockholm, with its highly branched subway network, only one line, in one direction, splits into three. This is because even a split into three branches requires limiting off-peak frequency on the branches to less than a train every ten minutes, which is undesirable in large subway systems. The result is that reverse branching can easily create a situation in which there are more tracks in the core than in the outlying areas, as it does in all four cities surveyed above, restricting capacity on each core track.
In contrast, regional rail tends to operate at lower frequency on the branches, and this permits conventional branching with more than two branches per trunk. In addition, there are often turnback facilities at through-stations, and substantial four-track segments on otherwise two-track lines. The result is that reverse branching is possible without any constraint on core track capacity. The Berlin S-Bahn is highly branched in both the conventional and reverse senses. The RER E is being extended to the west, including a takeover of an RER A branch. And the Tokyo commuter rail network has extensive reverse branching, coming from through-service between commuter lines and subway lines but also from the Shonan-Shinjuku Line’s split from the Tokaido and Tohoku commuter lines. In none of these cases is there a significant restriction on core capacity, simply because there’s enough slack in the branches that they can’t fill to track capacity unless the core has filled as well.
In the US, I am familiar with three proposals for new subway lines that involve reverse splits, in Boston, Washington, and New York.
In Boston, the proposal actually involves commuter rail rather than the subway: the Worcester Line would use the Grand Junction Railroad to go through Cambridge to reach North Station, bypassing South Station. See map on page 38 of the statewide transportation capital budget proposal. This would not reduce capacity, since the Worcester Line is nowhere near exhausting the capacity of a two-track railroad, and moreover, the Grand Junction line would terminate at West Station within Boston proper, where there’s a railyard. However, this is still bad transit, for other reasons. West Station serves a residential neighborhood, without enough density to justify a fork toward both North Station and South Station. On top of that, since North Station lies outside the Boston CBD, the proposal is essentially a mixture of a radial and a circumferential line, with all the problems that would bring – and despite running as a circumferential line through Cambridge, there is no transfer planned with the Red Line, although the Grand Junction passes close to the Kendall/MIT station.
It would be better to bag all plans to use the Grand Junction until such time that the state builds the North-South Rail Link, connecting North Station with South Station. Then, the Grand Junction would make an almost perfect alignment for a circular line, with its eastern leg connecting North and South Stations and its western end going through Cambridge, making several stops, including a transfer to Kendall/MIT. This would require high investment – besides being a single-track at-grade line, the Grand Junction would require a new junction to connect to the Worcester Line to go east toward South Station, whereas today it only connects to the west, toward Allston and Brighton – but still a fraction of the cost of the North-South Rail Link, which is getting some serious political support, including from former governors Michael Dukakis and William Weld.
In Washington, there already is some reverse branching: the Yellow and Blue Lines share tracks in Virginia, but run on two different trunk lines in Washington proper, each shared with other lines, so four central tracks become four tracks in Virginia. But now with the opening of the Silver Line, raising the number of Virginia tracks to six, WMATA would like to separate the Blue Line from the Orange Line, which it shares tracks with in Washington, in order to provide six tracks across the District as well. This can only lead to awkward service patterns and wasted core capacity, as Matt Johnson demonstrates on Greater Greater Washington: because the Orange and Silver Line will keep interlining under any plan, reckoned from their split east there are only four tracks in Virginia and not six. Moreover, the Yellow Line interlines with the Green Line in the District, which means that even if it’s separated from the Blue Line, it could not run at full capacity.
Washington built itself into a corner with its Metro route decisions. There’s no corridor in the city that really needs a subway line; unlike New York, Los Angeles, and San Francisco, Washington has no corridor with so much bus ridership that it should be a subway line. A fourth subway line would be useful for service to Georgetown, but that’s about it. So decisions about a fourth line in the District should be based on the capacity needs of the branches, not those of the core. On a list of possible changes that WMATA looked at, Greater Greater Washington included a separated Silver Line, including separation up to the junction with the Orange Line so that they share no tracks. I’ll add that if WMATA wants to go down that route, then it should give the Orange Line its own route through the District and keep the Silver and Blue Lines together; this is because the Orange Line is the busiest of the three, so that it should be the least branched, in this case not branched at all whereas the other two do branch.
Finally, New York. Second Avenue Subway is going to change the nature of the reverse branching used by the lettered lines, for the better. Because the plan for Phases 1 and 2 is to run only the Q train, the city will finally have matching numbers of lettered tracks in and north and east of the Manhattan core: twelve tracks in the core, and twelve in Uptown Manhattan and Queens. Unfortunately, it is impossible to match service, because that would sever too many connections. Second Avenue Subway only connects to the Broadway express line, so to match service there couldn’t be any other service using the Broadway express.
Recall the London NIMBYism mentioned at the beginning of this post: that was about a service change that would give commuters a cross-platform (see comment with diagram) transfer between their branch of the Northern Line and the central segment of the other branch. In New York, the transfers in western Queens involve a lot of walking between platforms, if they even exist. Then all the Broadway locals (the N/R) would go to Queens through 60th Street Tunnel, and thence to the Astoria Line, severing the connection to the Queens Boulevard Line. The Queens Boulevard Line has two ways into Manhattan: 53rd Street, which connects to both Eighth and Sixth Avenues, and 63rd Street, which connects only to Sixth Avenue. Moreover, either all F trains (through 63rd) have to run express in Queens and all E trains local, or the reverse; mixing and matching would produce at-grade conflict at the junction, as seen on the Queens 1 track map on nycsubway.org. The transfer between the E and F would be located at 74th Street in Queens, several kilometers east of the split, which is located just to the east of the westernmost express/local station, Queens Plaza. Neither the E nor the F would have a transfer to the N/R near their respective intersection points. The Q would not have a transfer to the E (it would have one to the F, though). This puts many commuters in an impossible situation and the capacity gains from it are frankly not enough to be worth it.
Instead, the capacity gains would be limited to running some more express trains on the Broadway Line. Before the service cuts in 2010, the N ran express on the Broadway Line, the Q terminated at 57th Street at the north end of Midtown, and a fourth Broadway route, the W, ran local and served the Astoria Line. Once the Q is extended up Second Avenue, the restored W could beef up Broadway Line service. Second Avenue would only get a branch despite its high ridership, but it’s still only a segment of a line.
Then there are Phases 3 and 4 of Second Avenue Subway, serving Midtown and the Lower East Side, where the Q runs on Broadway. The official plan introduces another reverse branching: a new route, the T, is planned to run the entire length of Second Avenue: see map here. When both phases are complete, there will be fourteen lettered tracks in Midtown but only twelve Uptown and in Queens.
To resolve this, the MTA should activate a connection that is included in the Second Avenue Subway plan as a non-revenue connection: a connection from Second Avenue south of the Q/T split at 63rd Street to 63rd Street Tunnel; currently, 63rd Street is the least used connection from Manhattan to Queens, since the reverse branching limits capacity and 63rd Street is the least useful connection since it enters Manhattan north of Midtown. This implies there should be a Queens Boulevard-Second Avenue service, which I will call the U, one letter next to the T. The Queens Boulevard express tracks are filled to capacity and the local ones are not, so the T should run local, cutting the frequencies on the existing local R and M trains a bit to make room. It would still leave New York with twelve Uptown and Queens tracks diverging to fourteen Midtown tracks, but it would distribute the load better, in the same way the present system distributes the load better than the 1930s-era reverse branching from six to eight tracks did.
New York is in a somewhat special case, in that its subway system is based on heavy branching and reverse branching, and moreover it’s historically based on three different systems, with poor transfers between them. Fully untangling the lines after Second Avenue Subway’s Phases 1 and 2 are built is not possible because there are no transfers between the lines that would result, and the station placement is such that any new transfers would involve long walks between platforms.
Other cities, especially cities planning new systems from scratch, should not emulate this feature, and should instead design all lines to either not branch at all or only branch conventionally. A system designed from the ground up could have cross-platform transfers between lines, and even make sure they’re timed, reducing the cost to passengers of having to transfer in lieu of using a reverse branch. It could be coherent, in the sense of making it easy for an unfamiliar passenger to understand how to get from each station to each other station. And it could be built for maximum capacity in the most crowded segments, where it matters the most.
Authoritarian Leaders and Agenda Setting
On Tuesday, Andrew Cuomo proposed a new signature initiative: a $450 million AirTrain to LaGuardia, connecting to the Mets’ stadium on both the 7 train and the LIRR. The proposal has practically no merit even as an airport connector: Ben Kabak and Yonah Freemark both note, with helpful graphics, that the connection is so circuitous it’d be slower than the existing bus-subway options to nearly every destination, including everywhere in Manhattan. Capital New York notes that in general, transit activist reactions to the plan were cold, precisely because it’s such bad transit.
The interesting aspect of this is about the counter-criticism, and the discussion it led to. (In contrast, Cuomo’s general hostility to transit and intercity rail is not news, and it’s unlikely someone with such a history could come up with cost-effective transit plans.) The main reaction to the criticism is not “where would you spend $450 million instead?”. That question has a few answers, all of which are boring: the general MTA capital plan, or, if the money is to go to expansion, Second Avenue Subway Phase 2, the next item on the city’s transit agenda now that Phase 1 is nearing completion.
Instead, the main reaction is “how would you connect to LaGuardia instead?”. That question, too, has a definite answer, which Ben talked about in his post, and which I pointed out in my post about airport connectors last year: an extension of the N to the east, with several stops (for example, at Steinway and Hazen) to serve more of Astoria and not just airport riders. The N takes a direct route to Manhattan, passing through or next to the top areas for LaGuardia passengers, as seen in the second map here. But even that is the wrong question. There are probably more cost-effective subway extensions in New York, having nothing to do with LaGuardia; I have to say probably, since at no point has the MTA proposed large enough a slate of possible extensions that we can compare projected costs per rider and say “this is the best.” There might even be better ways to extend the N eastward than to LaGuardia: an elevated line over Ditmars, a short segment of the Grand Central Parkway, and Astoria Boulevard would serve East Elmhurst, a dense, transit-deprived section of Queens, and would probably produce higher ridership than a swerve from the GCP to the airport.
Such is the power of a governor who’s accountable to nobody: he proposes a scheme, and even the criticism is on the governor’s own terms of providing service to LaGuardia. Yonah compares travel times to various destinations on various alignments for connecting LaGuardia to the subway. Nate Silver’s response has an infographic with travel times from the airport to city hall in various American cities – an infographic that is of little use to New York, where the main destination is far north of city hall, but is well within the general topic of LaGuardia’s airport connections. Even I, cognizant of this agenda-setting power, have to at least mention an alternative LaGuardia connector, knowing readers will want a plan.
The cheeky response to this is that in a democracy, this wouldn’t happen. Now, the US is a democracy. Cuomo has to stand for election every four years. The worst infrastructure disasters tend to be in countries that are authoritarian through and through: Russia’s elevated winter Olympics costs in Sochi and Qatar’s human rights abuses in the World Cup preparations are the two biggest recent examples. But democracies with insufficient checks on political power are susceptible to this as well. This is common in the third world, where corruption is more common – hence the abuses of the World Cup last summer, in a solidly democratic country – but can also happen in developed countries with democratic deficits.
Usually, the phrase democratic deficit refers to the EU, and by analogy other supranational organizations. But in the US, it’s a useful framework for thinking of local and state governments. Rick Scott, Scott Walker, and John Kasich needed nobody’s approval to reject federal funding for intercity rail. Chris Christie did not need anyone’s approval to cancel ARC, or to cause traffic jams in retribution against a mayor who refused to endorse him; in a recent article in New York YIMBY, defending the cancellation of ARC as originally proposed, I made sure to take multiple barbs at Christie, just to avoid playing into the agenda of canceling ARC to posture about government waste while diverting rail money to the New Jersey Turnpike.
Cuomo’s power is if anything even greater: the New York state government works by a three men in a room model, in which the governor, the speaker of the State Assembly (just indicted for corruption), and the majority leader in the State Senate (currently relatively powerless and dependent on Cuomo) wield all practical power. In such a system, Cuomo does not have the power to shoot protesters, thankfully, but does have the power to propose megaprojects that glorify him, without a broad discussion with stakeholders, in which the MTA’s long-term expansion plans and cost-benefit ratios would come into play.
Last year, in writing about elite infrastructure projects that are not about meeting a service need, I noted that talking about such projects in terms of cost-effectiveness is moot, because they were never intended to be about benefiting the wider public. We could discuss where to spend money on transit in New York in the way that would benefit the largest number of riders. We could even discuss what the optimal way of connecting to LaGuardia is, before comparing the best connection with non-airport projects to see where it should lie on the list of future expansions. But it would be pointless, because Cuomo is not interested in spending money on benefiting the largest number of riders; he frankly does not care about transit riders. When the time came to support transit riders, for example in signing a lockbox bill guaranteeing that money the state government had promised the MTA would indeed go to the MTA, he vetoed the bill instead.
In such a climate, as soon as we talk about tweaks to Cuomo’s plan, Cuomo’s already won; whatever happens, he will reap the credit, and use it to buy political capital to keep building unnecessary megaprojects. Even trying to make the best of a bad situation by making the airport connector better is of little use, since Cuomo will support the plan that maximizes his political capital and not the one that maximizes transit usage even within such constraints as “must serve LaGuardia.”
This is evident in his response to criticism among transit activists. After listing the many pundits and activists who oppose the plan, Capital New York included a response from the governor’s office, which said, in so many words, “our plan is better because it doesn’t go through populated neighborhoods, where there would be NIMBYs.” What those of us who want good transit view as a feature – connecting to underserved neighborhoods and not just to the airport – Cuomo regards as a bug. A plan that included additional stops in Astoria might well attract community support, while still offering much faster trip times to Manhattan because of the direct route, but would rely on non-airport ridership, which Cuomo doesn’t care about, to keep the cost per rider reasonable.
Because of this disconnect between what would work for transit users and what would work for Cuomo, the only reasonable answer to the plan is a simple no, which should be said as sharply as possible. No working with the proposal: it’s terrible, a true stone soup. No tweaks: Cuomo wouldn’t want any ingredients that would improve the soup, and would insist on keeping the stone in anyway. (He doesn’t have to eat it, he doesn’t use transit either way.) And, within the parameters of a transit conversation in which people are desperate to see expansions, no discussion that validates Cuomo’s original plan.
Update 7/28: in a joint announcement with Joe Biden, Cuomo has just announced $4 billion in airport improvements at LaGuardia, bundling the rail connector into the larger projects. I have nothing to add that I didn’t already cover in this post and in my older post about elite infrastructure investments.
Mixing Circumferential and Radial Transit
Nearly all rapid transit lines belong to one of two categories: radial lines (a large majority), which connect city center with outlying neighborhoods or suburbs; and circumferential lines (a minority), which go around city center and often serve secondary centers and usually intersect all or nearly all radial lines perpendicularly, such as Paris’s Lines 2 and 6, Moscow’s Circle Line, Seoul’s Line 2, New York’s G train, and Shanghai’s Line 4. In this post, I’m going to discuss an uncommon third category, that of lines that combine circumferential and radial functions: they go toward city center, like a radial line, but then change direction and become circumferential. The G train in New York was like this until 2001, and Line 3 in Shanghai is like this today. This is apropos a proposal by a team Penn Design graduate students to build a variant of Triboro RX in New York that combines Triboro’s circumferential orientation with a radial commuter line. I believe such mixed lines are a recipe for low ridership and strained transfer points, and the Penn Design proposal is inferior to the original Triboro proposal.
First, some details about the mixed lines in question. The example most accessible to most readers is the historical G train in New York. When it first opened in the 1930s as part of the IND, it was designed to both connect Brooklyn and Queens without going through Manhattan and provide local service along radial lines, running alongside express trains that would serve Manhattan. Thus the northern half of the G ran under Queens Boulevard as a local, while the E and F trains provided express service and went to Manhattan. From the start, this arrangement was unstable. Demand for service to Manhattan was much greater than to Brooklyn, so people riding the G inbound changed to the E or F at the first express station after the one they boarded. With overcrowded express trains and undercrowded local ones, the Transit Authority was compelled to build a track connection in 1955 to add a Manhattan-bound local service, and to build a second track connection in 2001 to add another Manhattan-bound local train and remove the G from Queens Boulevard entirely.
In Shanghai, Line 3 was built as an (almost) entirely above-ground line, interlined for part of the way with the circular Line 4. The northern half of Line 3 is radial, running parallel to the overcrowded Line 1. However, where Line 1 enters the traditional center and serves People’s Square, Line 3 swerves west to go around it (missing Lujiazui, the new high-rise CBD to the east of People’s Square), interlining with Line 4, and leaving the loop southward to intersect Line 1 again at Shanghai South Railway Station. Its ridership disappoints not only by the standards of Line 1, but also by those of Line 4: 642,000 on 2014/4/30, the system’s busiest day, compared with 1,384,000 on Line 1 and 907,000 on Line 4. Line 6, which likewise combines a radial function at its northern end with a circumferential one at its center, serving Century Avenue but not Lujiazui or People’s Square, has even lower ridership, 376,000, although this is several times the original projection.
There’s a discussion on Human Transit, in which consensus is that the best circumferential lines connect secondary activity nodes that generate trips in their own right. Now, the G train connects Downtown Brooklyn (the largest business district in New York outside Manhattan) with Long Island City (one of the business districts of Queens), but it lacks the other positive feature of circumferential lines: transfers to the radial lines, to allow one-transfer trips from anywhere to those secondary nodes. The G has good transfers only to other IND lines, and at the Queens end, its transfer to the Queens Boulevard trains was cut in 2001 since, for operational reasons, it was cut not to its old junction with the E and F (Queens Plaza) but one station short (Court Square). Other G transfers are very recent and require a considerable amount of walking.
In contrast to the underperforming G, circumferential lines that both connect important activity nodes and have plenty of radial transfers are backbones of their cities’ transit systems. Shanghai’s Line 4 is fairly busy as noted above. Seoul’s Line 2 is according to a forum post the busiest in the system. Paris’s Lines 2 and 6 are only about average in ridership but combined would be the second busiest after Line 1 (and per route-km are third and fourth, only behind Lines 1 and 4, but are only narrowly ahead of many other lines). The juxtaposition of Shanghai’s Lines 3 and 4 in particular suggests that subway lines shouldn’t try to mix radial and circumferential functions.
Let us go back to the impetus for the post, Triboro RX. The proposal is to largely use existing freight rail lines, all of which are lightly used and could be turned over to the subway, to provide a semicircular line connecting nodes of activity in the Bronx, Queens, and Brooklyn. Because of the focus on using an existing right-of-way to reduce costs, the line misses the most important nodes in Brooklyn and Queens, which are served by the G in any case. However, it passes within half a kilometer of the Hub in the Bronx and, via a short greenfield tunnel, connects to Yankee Stadium, the Bronx’s busiest subway station; it also connects to Brooklyn College and 74th Street/Broadway in Queens, both busy stations if not as central as Downtown Brooklyn or Long Island City. Moreover, it provides direct Bronx-Queens service, which in the existing system requires circuitous routes through Manhattan with difficult transfers, and has reasonable transfers to nearly all subway lines. At the end, the lack of service to Downtown Brooklyn ensures it cannot be a very well-patronized line, but as the right-of-way is almost entirely in place, its cost per rider could be quite low.
In contrast, the Penn Design proposal, called Crossboro, severs the connection to the Hub and Yankee Stadium, and replaces it with service along the Northeast Corridor to Coop City, making sparse stops, at the same locations Metro-North plans to for Penn Station Access; this is 4 stops in 10 km in the Bronx, compared with stops spaced roughly every 800 meters in Queens and Brooklyn, as in the original proposal. The trains would be certified for mainline operation, on the model of the London Overground, rather than segregated from mainline traffic.
The problem with the Crossboro idea is essentially the same as that of the G train until 2001. Most riders at the four Bronx stops are interested in getting to Manhattan, and not to the neighborhoods served by Crossboro, so they’d look for transfer opportunities. The only such opportunity in the Bronx is at Hunts Point, to the 6, which unlike the E and F on Queens Boulevard runs local and provides slow service to Manhattan. With the extra transfer, there is no advantage to Bronx riders over continuing to walk or take the bus to the 2, 5, and 6 trains to Manhattan. Moreover, because of the poor transfers within the Bronx, it’s impossible to use the line to connect from Queens to anywhere in the western half of the Bronx, including Yankee Stadium and the Hub: there’s a connection only to the 6, and none to the 2, 4, 5, or B/D, or to Metro-North.
The principle in action here is that, especially when there are no compelling destinations, it’s critical to make sure the line provides connectivity between large regions. This means connecting to all or almost all radial lines in a region well-served by radial subways but poorly served by preexisting circumferential ones. Not including the 1, which no proposal connects to, the Bronx has five subway lines, all providing radial service to Manhattan; it is a feature of Triboro that it connects to all five (though the connection to the 2/5 requires a long walk), ensuring that people from nearly everywhere in the Bronx can use the line to get to its destinations in Queens and Brooklyn with one transfer. To get from anywhere to anywhere would require two transfers, but to get from a random station in the Bronx to one in Queens or Brooklyn often already requires two transfers, usually at busy Manhattan stations that are out of the way for the crosstown traveler.
Mixing radial and circumferential service interferes with this principle, since the radial component has to come at the expense of completing the circle (or semicircle in a geographically-constrained city like New York). Thus, it’s harder to use the line to get to a large enough variety of points of interest to make up for the fact that it misses the city’s most important destinations. Of course, such a line is also wanting as a radial line, since it misses the center. Thus, ridership underperforms, and the line usually fails to achieve its stated purpose.
New York Regional Rail: the Central Segments
I’ve written a lot of articles over the years about what should be done with regional rail in the New York area, focusing either on the overall shape of the system (as on The Transport Politic) or on specific aspects of the central links (as in past posts here). I’d like to synthesize these ideas into one coherent proposal. Unlike my posts on The Transport Politic, I’m going to pay relatively little attention to how to match branches for ridership, but more attention to what to do in a central region consisting of the city proper, New Jersey as far as Newark, and New Rochelle. I will also indicate things that can be done to keep construction costs under control for a plan that includes 30 kilometers of urban and underwater tunnel, about six times as much as the planned tunnels across the Hudson.
The Principles, Restated
The most important principle for infrastructure planning in developed countries is organization before electronics before concrete. In New York, it’s possible to squeeze some extra capacity out of the first two: notably, the LIRR and Amtrak together only run about 40 trains per hour into Penn Station from the east on four tracks, whereas the maximum capacity is about 50, and this is before trains are diverted to the East Side Access tunnels to Grand Central. The LIRR’s bottleneck is not the East River Tunnels, but the platforms at Penn Station, and this means it’s possible to use improved operations, including through-running, to squeeze extra capacity even before East Side Access opens.
However, the biggest bottleneck in the region is from the west, across the Hudson, and there, present traffic peaks at 24-25 trains per hour on just two tracks. I know of limiting cases in which mainline operations achieve about 30, using moving-block signaling on captive tracks (e.g. the RER A, which shares tracks with nothing else in its central segment), with one example that uses fixed blocks (the shared RER B and D tunnel achieves 32). Here, concrete is unavoidable, so new tunnels are required. In addition, providing service to more points than Penn Station, or Grand Central for commuter lines connected to it, requires new tunnels as well.
However, this new infrastructure should be built economically. The posts I linked to in the initial paragraph of this post provide some ideas, including the use of large-diameter tunnel boring machines to reduce station construction costs, and the use of the existing station cavern at Penn Station. This should be paired with seamless fare and schedule integration, including through-routing, and a fleet replacement plan to get rid of locomotive-hauled trains and replace them with EMUs (electrifying unelectrified branches as needed).
Subject to the requirement for new infrastructure, New York should remember that it’s a major city, and as such, it’s capable of supporting multiple independent commuter lines. Paris has five RER lines, of which only the B and D share tracks, and only between one pair of stations, on top of several major commuter lines disconnected from the RER network. It’s better to keep the map relatively coherent, so that one central trunk will split into several outer branches, but nearly all outer branches will feed into consistent central trunks. (As an example, the London Underground’s deep-level lines’ branching is coherent, while the New York subway’s mostly isn’t, with the E, F, M, and R trains running on what’s technically a branch and then diverging to three different Manhattan trunks.) This simplifies the junctions that need to be built just outside the city core, and also makes the network easier to remember.
The Tunnels
There should be a new pair of tunnels between New Jersey and Penn Station, parallel to and south of the existing tunnels. Those tunnels should then continue to Grand Central. This is the core of ARC Alternative G, which was removed from consideration in the original ARC project for reasons that were never explained adequately (Stephen Smith has been making freedom of information requests for years). However, unlike Alt G, it should not include new railyards in Manhattan, as those belong in areas where land is cheaper, nor should it include a loop for trains from the Erie lines to get to Penn Station.
The lynchpin of the plan is not the tunnels to Penn Station, which are already on the political radar in the form of the Gateway Project, albeit at a large multiple of an acceptable cost, due to such frills as new Penn Station tracks. Rather, it’s a new set of tunnels, meeting at Lower Manhattan in the vicinity of Fulton Street, going in four directions: north to Grand Central, south to Staten Island under Lower New York Bay, northwest to New Jersey via the Erie Railroad’s old Pavonia terminal, and southeast to Brooklyn to the Flatbush Avenue LIRR station. Using a double-O-tube large-diameter TBM, the Fulton Street station should feature cross-platform transfers, large banks of escalators to the street, and, to reduce costs, no station structures outside the tunneled station, putting timetables and ticket-vending machines on the street. All connections should be to Grand Central’s existing station and not the new East Side Access cavern, as the cavern leads only to the LIRR, which is already connected with both Penn Station and Flatbush Avenue. The existing tracks connect to Metro-North, which is not.
A possible additional tunnel in the far future would connect Hoboken with Grand Central’s new cavern, via Union Square. This is only in case the existing lines become congested. Current commute patterns make such congestion very unlikely, but things could change if, as a result of the new capacity, more people choose to live in suburban North Jersey and work in Manhattan.
The Network
There should be five lines running through Manhattan, without any track-sharing between them, and one using East Side Access and terminating in Manhattan. I am going to try using consistent numbering, different from the order I used in my posts on The Transport Politic, in order to group the lines using Penn Station and the lines to Lower Manhattan separately.
Line 1 is the existing mainline. Its inner route goes from Secaucus Junction to Sunnyside Junction, via the existing tunnels to Penn Station. Intercity trains use it (and should continue doing so), but most traffic will always be on commuter rail. Beyond Secaucus, trains can go to either the Northeast Corridor or the Morris and Essex Lines; to simplify junctions, most trains should use the Northeast Corridor (including the Raritan Valley Line, which splits past Newark). Beyond Sunnyside, they can go to the LIRR or the Northeast Corridor; to ensure adequate capacity for intercity trains while still providing service to the eastern Bronx, trains should use a mixture; in the long run, four-tracking everything north of Hell Gate Bridge will be necessary. It may be best to dedicate Port Washington trains to this line. At Penn Station, it uses middle-numbered tracks.
Line 2 uses the new tunnels to Penn Station and Grand Central. Its inner route goes from Secaucus to Penn Station, Grand Central, and Harlem-125th Street, splitting into branches thereafter. Most trains should go to the New Haven Line, since Line 1 could never provide adequate traffic for it; the rest should go to the Hudson Line – see below for Line 3. At the New Jersey end, it should run to a mixture of Northeast Corridor trains (including to the North Jersey Shore and Raritan Valley) and Morris and Essex trains, as required by demand. At Penn Station, it uses low-numbered tracks, potentially just 1-4. I expect it to be the most crowded, because of the service to both primary Midtown Manhattan stations.
Line 3 uses the Empire Connection, realigned tunnels to Penn Station, and the northern pair of the East River Tunnels to reach the LIRR. Its inner route goes from Yonkers to Penn Station and thence to Sunnyside. Intercity trains to Upstate New York use this line, but there are fewer of them than on the Northeast Corridor. Beyond Yonkers it can only go on the Hudson Line, so most Hudson Line trains should use it rather than Line 2. At the LIRR end it should run alongside trains to the East Side Access tunnel; as the splits are far to the east of Sunnyside, it may be prudent to have each branch serve both it and East Side Access, but in either case, timed East Side Access/Line 1 transfers at Sunnyside are necessary. At Penn Station, it uses high-numbered tracks. I expect it to be the least crowded, since to the west it only reaches one commuter line, one whose present traffic is moderate.
Line 4 is the main north-south line, from Staten Island (both the existing Staten Island Railway and the North Shore Branch) through the underwater tunnel to Fulton Street, Grand Central, and Metro-North. North of Harlem-125th Street, it can connect to any line, but I think the Harlem Line is the most coherent, as the only Metro-North line that is not needed for lines that don’t go to Grand Central. I expect it to be very crowded with inner-suburban and outer-urban traffic, as it serves Staten Island and underserved neighborhoods of the Bronx and the suburbs to its immediate north.
Line 5 is the combination of the Erie Lines, and possibly also the Northern Branch and the West Shore Line, and the LIRR’s Atlantic Branch, via Pavonia and Flatbush. For interlocking simplicity, all trains should go to one or two lines beyond Jamaica, ideally the Atlantic and Montauk Lines (the existing turnouts already favor trains from the Brooklyn Atlantic Branch continuing along the branch to Far Rockaway and Long Beach), leaving the Main Line to Line 3 and East Side Access. As there are five possible branches in New Jersey – the Northern Branch, the West Shore Line, the Pascack Valley Line, the Bergen County Line, and the Erie Main Line – frequency would be limited if all were used, so it may be best to choose just three.
Here is an unlabeled map of the five lines, with only inner branches shown; the decision of what station to terminate branches at has nothing to do with the desired service pattern, and is purely illustrative.
A potential Line 6 would take in all Morris and Essex lines, go to Hoboken, cross into Manhattan via a new tunnel with an extra stop at Union Square and then go to Grand Central and East Side Access; as discussed above, it’s omitted due to its very long-term nature.
Penn Station
I have discussed what to do with the Fulton Street Station. Penn Station is more complicated. The easiest thing to do is nothing, beyond new tunnels. There would be many platform tracks, two per access track for Line 2 and more than two for Lines 1 and 3; Line 3 would involve difficult switching moves and slow speeds through the station. Line 1 is the most important priority for allowing intercity trains to serve the stations with few (ideally no) diverging moves at turnouts, to maintain speeds.
To avoid platform congestion, especially on Line 2, more staircases and escalators should be installed. This, however, clutters the narrow platforms.
The second possibility is to pave over tracks to widen the platforms. I vacillate between preferring paving over pairs of tracks to create very wide platforms, and paving over every other track to create wider platforms at which trains can open doors on both sides. Right now I lean toward the former, as it would allow reusing preexisting escalators: the platforms currently have single-direction escalators as they’re too narrow for an adjacent pair of escalators, one per direction, and merging two platforms would be the easiest way to allow wider escalator banks.
Unfortunately, on the line with the biggest platform crunch, Line 2, this would imply a single platform with two tracks serving two tunnel tracks, so that dwell times would limit capacity somewhat. This limit is not too sharp – 24 trains per hour are achieved at through-stations in many cities without additional tracks, with some limiting cases of 30 (such as the moving block signal-equipped RER A) – but it’s still a limit, and requires good timetable adherence departing the station. These are only commuter trains, which run shorter routes than intercity trains, but Line 2 is likely to involve some long-range commuter runs, as far as Trenton or Dover or New Haven. (Since Line 1 is the only one serving local Northeast Corridor stations in the Bronx, it should only get the local trains, while longer-range trains to New Haven should use Line 2.)
The most expansive solution is to rebuild the station’s track level. There is an RPA study Penn Design study in that direction. For optimal passenger usage, the two concourse levels would be replaced by one, and the station’s 21 tracks would be reduced to 12, facing six 15-meter-wide platforms; the platforms’ eastern ends would be shaved slightly, to allow longer curve radii heading from the Lines 2 and 3 tunnels with simple turnouts, each tunnel track turning into two station tracks facing the same platform. In principle, it can be sequenced to shut down parts of the station in succession: first the southern tracks (New Jersey trains would be immediately interlined with Northeast Corridor and LIRR trains for a combination of Lines 1 and 2), then the northern tracks (the LIRR would have East Side Access by then), and finally the remainder of the central tracks. The bulk of the work on the central track could be done in conjunction, first removing the platform between the existing tracks 11 and 12 and then realigning tracks from the center outward.
I want to clarify that I do not support the most expansive solution, as it is likely to cost billions of dollars. It would create a nice Penn Station for train travelers. Those 15-meter platforms could have 6 escalators side by side with not too much obstruction, and 4 with practically none (the widest escalator is 1.6 meters wide outer end to outer end, with 1 meter used for the moving stairs). Reducing the two concourses to one would allow taller ceilings throughout, and redesigns of passageways for maximum passenger throughput. The only problem: it would be extremely expensive.
I bring this up only because the Municipal Arts Society and the RPA have teamed to propose a multi-billion dollar remake of Penn Station above track level, with high aesthetic value and zero transportation value. In addition, Amtrak wants to move its passenger facilities one block west, in the wrong direction, which has negative transportation value. If there has to be a redo of the station, it might as well be one that improves it at track level as well, rather than just making it pretty from the outside.
Phasing and Costs
The ideal phasing is “as soon as money becomes available.” There is a tendency in the US to be overly cautious about everything and chop projects into little pieces, in the name of prudence. It’s always easy to show one’s moderation by chopping a fixed amount of money from every proposal (quintessential moderate Senator Olympia Snowe was famous for this) and by funding many projects by small amounts. These small projects then fail because of reduced network effects or sometimes higher costs due to smaller orders.
The tunnels I proposed in this post sum to about 30 kilometers. These 30 kilometers are objectively difficult to build. The tunnels for Lines 4 and 5 of this proposal go under wide rivers and a bay, and once they reach Manhattan land they have to go under the entire Lower Manhattan subway network. Half a billion dollars per kilometer would be a good deal: Crossrail is more than a billion dollars per double-track tunnel kilometer, assuming there is nothing to build except tunnels (which is far from true), while Crossrail 2’s cost range is $600-850 million per km (see also my first comment in the link). London is a high-construction cost city, but New York is even higher-cost; building a line for London’s costs would be a major achievement for New York.
Bear in mind that Amtrak thinks the Gateway Project alone would be $16 billion. When I propose to build an entire regional rail network for perhaps $20 billion (in 2010 dollars, not year-of-expenditure dollars), based on what it would cost in other cities, I am not taking into account the bloat that leads to high costs in New York. At the per-km costs Amtrak thinks are appropriate for what would be one of the simpler tunneling projects for this system, this is plain unaffordable.
Still, precisely because of the network effects, and because this plan neatly separates branches of the existing commuter rail system, it should be proposed all at once. If it’s expensive then it will also be delayed; it’s better to have six mainline rail tracks under the lower Hudson by midcentury, than to have four and then realize there’s a capacity crunch and six tracks are required after all. Of course it’s best if everything is in place by the late 2020s, on the schedule of the Grand Paris Express. But the point is that longer project latency encourages bigger rather than smaller plans. The Line 2 tunnel, by whatever name, is still the most important priority, but the phasing then becomes “whenever it can be designed and built.”
The lower-end cost I’m proposing is for a project without any frills. It includes a bare minimum touch for Penn Station – simpler interlockings at places and some extra access points, but no more. It includes no Sunnyside decking or other redevelopment, which should be funded separately in any case. (When people build highways, do their projected cost figures ever include the construction of the suburban subdivisions they’d sprout?) It doesn’t include electrification of branches, although that is cheap enough as to be well within the uncertainty in even a first-order estimate. It doesn’t even include rolling stock, although the large preexisting fleet of decent EMUs means there’s no need for immediate fleet replacement as on the MBTA and other diesel-hauled railroads.
The only thing this project does include is more paths for more commuter trains to serve Manhattan and other regional job centers.
What is the MTA Reinventing, Anyway?
In the last few years New York’s MTA has gone through multiple cycles in which a new head talks of far-reaching reform, while only small incremental steps are taken. The latest is the MTA Transportation Reinvention Commission, which has just released a report detailing all the way the MTA could move forward. Capital New York has covered it and hosts the report in three parts. Despite the florid rhetoric of reinvention, the proposals contained in the report are small-scale, such as reducing waste heat in the tunnels and at the stations on PDF-pp. 43-44 of the first part. At first glance they seem interesting; they are also very far from the reinvention the MTA both needs and claims to be engaging in.
Construction costs are not addressed in the report. On PDF-p. 53 of the first part, it talks about the far-reaching suburban Grand Paris Express project for providing suburb-to-suburb rapid transit. It says nothing of the fact that this 200-km project is scheduled to cost about 27 billion euros in what appears to be today’s money, which is not much more than $150 million per km, about a tenth as much as New York’s subway construction. (Grand Paris Express is either mostly or fully underground, I am not sure.) The worst problem for transit in the New York area is that its construction costs are an order of magnitude too high, but this is not addressed in the report.
Instead of tackling this question, the report prefers to dwell on how to raise money. As is increasingly common in American cities, it proposes creative funding streams, on the last page of the first part and the first six pages of the second part: congestion pricing, cap-and-trade, parking fees, a development fund, value capture. With the exception of congestion pricing, an externality tax for which it makes sense for revenues to go to mitigation of congestion via alternative transportation, all of these suffer from the same problem: they are opaque and narrowly targeted, which turns them into slush funds for power brokers. It’s the same problem as the use of cap-and-trade in California.
One of the most fundamental inventions of modern government is the broad-based tax, on income or consumption. Premodern governments funded themselves out of tariffs and dedicated taxes on specific activities (as do third-world governments today), and this created a lot of economic distortion, since not all activities were equally taxed, and politically powerful actors could influence the system to not tax them. The transparent broad-based tax, deeded to general revenue through a democratic process, has to be spent efficiently, because there are many government departments that are looking for more money and have to argue why they should get it. Moreover, the tax affects nearly all voters, so that cutting the tax is another option the spending programs must compete with. The dedicated fund does neither. If the broad-based tax is the equivalent of market competition, a system of dedicated funds for various government programs is the equivalent of a cartel that divides the market into zones, with each cartel member enjoying a local monopoly. In this way there’s a difference between the hodgepodge of taxes the MTA levies and wants to levy and Ile-de-France’s dedicated 1.4-2.6% payroll tax: the payroll tax directly affects all Francilien workers and employers, and were it wasted, a right-wing liberal politician could win accolades by proposing to cut it, the way New York Republicans are attacking the smaller payroll tax used to fund the MTA.
The proposals of where to spend the money to be raised so opaquely are problematic as well. There is a set of reforms, based on best practices in Continental Europe and Japan, that every urban transit system in the first world should pursue, including in their original countries, where often only some of those aspects happen. These include proof-of-payment fare collection on buses, commuter trains, and all but the busiest subway systems; all-door boarding on buses; mode-neutral fares with free transfers; signal priority and bus lanes on all major bus routes, with physically separated lanes in the most congested parts; a coherent frequent bus network, and high off-peak frequency on all trains; and through-service on commuter rail lines that can be joined to create a coherent S-Bahn or RER system. As far as I can tell, the report ignores all of these, with the exception of the vague sentence, “outfitting local bus routes with SBS features,” which features are unspecified. Instead, new buzzwords like resiliency and redundancy appear throughout the report. Redundancy in particular is a substitute for reliability: the world’s busiest train lines are generally not redundant: if they have parallel alternatives those are relief lines or slower options, and a shutdown would result in a major disruption. Amtrak, too, looks for redundancy, even as the busiest intercity rail line in the world, the Tokaido Shinkansen, has no redundancy, and is only about to get some in the next few decades as JR Central builds the Chuo Shinkansen for relief and for higher speeds.
The only foreigners on the Commission are British, Canadian, and Colombian, which may have something to do with the indifference to best industry practices. Bogota is famous for its BRT system, leveraging its wide roads and low labor costs, and Canada and to a lesser extent the UK have the same problems as the US in terms of best industry practices. Swiss, French, German, Japanese, Spanish, and Korean members might have known better, and might also have been useful in understanding where exactly the cost problems of the US in general and New York in particular come from.
The final major problem with the report, in addition to the indifference to cost, the proposal for reactionary funding sources, and the ignorance of best industry practices, is the continued emphasis on a state of good repair. While a logical goal in the 1980s and 90s, when the MTA was coming off of decades of deferred maintenance, the continued pursuit of the maintenance backlog today raises questions of whether maintenance has been deferred more recently, and whether it is still deferred. More oversight of the MTA is needed, for which the best idea I can think of is changing the cycles of maintenance capital funding from five years, like the rest of the capital plan, to one year. Long-term investment should still be funded over the long term, but maintenance should be funded more regularly, and the backlog should be clarified each year, so that the public can see how each year the backlog is steadily filled while normal replacement continues. This makes it more difficult for MTA chiefs to propose a bold program, fund it by skimping on maintenance, and leave for their next job before the ruse is discovered.
I tag this post under both good categories (“good transit” and “good/interesting studies”) and bad ones (“incompetence” and “shoddy studies”) because there are a lot of good ideas in the report. But none of them rises to the level of reinvention, and even collectively, they represent incremental improvement, of the sort I’d expect of a city with a vigorous capital investment program and industry practices near the world’s cutting edge. New York has neither, and right now it needs to imitate the best performers first.
Dispersing Expensive Centers: Edge City Version
This is somewhat of an addendum to my post before about dispersal of urban networks toward cheaper cities. I addressed the question of dispersal from rich, expensive metro areas, especially San Francisco, to cheaper ones, as a way of dealing with high housing prices. But more common is dispersal within metro areas: gentrification spilling from a rebounding neighborhood to adjacent neighborhoods that remain cheaper, and office space spilling from the primary CBD to the edge cities. I am going to address the latter issue in this post.
CBDs are expensive. They have intense demand for office space, as well as high-end retail and hotels. In many cities, there’s demand for office space even at the construction costs of supertall skyscrapers, going up to about $5,000-6,000 per square meter in privately-built New York towers. Zoning regimes resist the height required to accommodate everyone, and this is worse in Europe than in North America and high-income East Asia. Paris proper has many towers just above the 100 meter mark, but only three above 120. On a list of the tallest buildings in Sweden, not a single one above 100 meters is in central Stockholm, and the tallest within the zone are not in the CBD but in Södermalm; compare this with Vancouver, a metro area of similar size. But in the US, too, expanding CBDs is difficult in the face of neighborhood opposition, even in Manhattan.
The solution many cities have adopted is to put the skyscrapers in edge cities. Paris famously built La Defense, which has far more skyscrapers than the city proper does; Stockholm is building skyscrapers in Kista; London built Canary Wharf; Washington, the major US city with the tightest CBD height limits, sprouted skyscraper clusters in several suburbs in Maryland and Virginia. Ryan Avent proposed this as one solution to NIMBYism: in new-build areas, there are few residents who could oppose the new development. In contrast, near zoning-constrained CBDs, not only are there many residents, but also the land is so desirable that they are typically high-income, which means they have the most political power to oppose new development.
The problem with this solution is that those secondary CBDs are not public transit hubs. In Paris, this has created an east-west disparity, in which people from (typically wealthy) western suburbs can easily reach La Defense, whereas people from poorer ones need to take long RER trips and often make multiple transfers. In every transit city, the CBD is unique in that it can be reached from anywhere. To give similar accessibility to a secondary center, massive investment is required; Paris is spending tens of billions of euros on circumferential regional rail lines to improve suburb-to-suburb connectivity, expand access in the eastern suburbs, and ameliorate the east-west imbalance (see for example isochrones on PDF-pp. 20-21 of the links here). Those lines are going to be well-patronized: the estimate is 2 million daily passengers. And yet, the east-west imbalance, if nothing else, would be a lesser problem if instead of building La Defense, Paris had built up Les Halles.
The situation in other cities is similar. Kista is on one branch of one subway line, two stops away from its outer terminus. Living in Central Stockholm, my coworkers and I can get to KTH on foot or by bike, but a coworker who teaches at KTH’s satellite campus in Kista has a long commute involving circumferential buses (taking the subway and changing at T-Central would be even longer because of the detour). While many individual sub-neighborhoods of Central Stockholm are quite dense, the overall density in the center is not particularly high, certainly not by the standards of Paris or New York. A similar problem happens in Washington, where the biggest edge city cluster, Tysons Corner, is traditionally auto-oriented and was only just connected to Metro, on a branch. This always affects poorer people the worst, as they can’t afford to live in the CBD, where there is easy access to all secondary destination, and often are pushed to suburbs with long commutes.
There is a political economy problem here, as is usually the case with zoning. (Although in the largest cities skyscraper heights are pushing beyond the point of constant marginal costs, purchase prices at least in New York are much higher than construction costs.) The people living near CBDs, as noted before, are usually rich. The displacement of office space to the suburbs affects them the least, for three reasons. First, if they desire work within walking distance or short subway distance, they can have it, since their firms typically make enough money to afford CBD office rents. Second, since they live in the transit hub, they can access suburban jobs in any direction. And third, if the transit options are lacking, they can afford cars, although of course traffic and parking remain problematic. Against their lack of incentive to support CBD office space, they have reasons to support the status quo: the high rents keep it exclusive and push poor people away, and often the traditional mid-rise buildings are genuinely more aesthetic than skyscrapers, especially ones built in modernist style.
These concerns are somewhat muted in the US, where rich people decamped for the suburbs throughout the 20th century, and have supported zoning that mandates single-family housing in the suburbs, instead of staying in the city and supporting zoning that keeps the city mid-rise. This may have a lot to do with the formation of high-rise downtowns in American cities of such size that in Europe they’d be essentially skyscraper-free.
However, what’s worse in the US is the possibility of short car-free commutes to the edge cities. Where La Defense is flanked by suburbs with high residential density, and Kista’s office blocks are adjacent to medium-density housing projects for working- and middle-class people, American edge cities are usually surrounded by low-density sprawl, where they are easily accessible by car but not by any other mode of transportation. This is because the American edge cities were usually not planned to be this way, but instead arose from intersections of freeways, and developed only after the residential suburbs did. As those edge cities are usually in rich areas, the residents again successfully resist new development; this is the point made in Edgeless Cities, which notes that, in major US metro areas, growth has been less in recognizable edge cities and more in lower-density edgeless cities.
As with the possibility of dispersing innovation clusters from rich, expensive metro areas to poorer and cheaper ones, the already-occurring dispersal from city centers to edge and subsequently edgeless cities has negative effects. It lengthens transit commutes. Although in Tokyo, long commutes first arose as a problem of a monocentric CBD, and the city developed secondary CBDs as a solution, the situation in European cities an order of magnitude smaller is very different. It worsens housing segregation: the development of an edge city tends to be in the direction of the favored quarter, since that’s where the senior managers live, and conversely, higher-income workers can choose to move nearby for the short commute. Although nearly all metro areas have favored quarters, decentralization of jobs thus tends to lengthen the commutes of poor people more than those of rich people.
This is not quite the same as what happens when entire metro areas are forced to disperse due to housing cost. The agglomerations generally stay intact, since an entire industry can move in the same direction: smaller cities have just one major favored quarter with edge cities, and larger ones still only have a few, so that industries can specialize, for example in New York, biotech and health care cluster in the Edison-Woodbridge-New Brunswick edge city. Moreover, the specialized workers are usually high-income enough that they can stay in the central city or migrate to the favored quarter. San Francisco’s programmers are not forced to move individually to faraway poor neighborhoods; they move in larger numbers to ones near already gentrifying ones, spurring a new wave of gentrification in the process; were they to move alone, they’d lose the access to the tech shuttles. The negative effects are predominantly not on richer people, but on poorer people.
The problem is that even among the poor, there is little short-term benefit from supporting upzoning. If Paris, London, and Stockholm liberalize housing and office construction, the first towers built of both kinds will be luxury, because of the large backlogs of people who would like to move in and are willing to pay far in excess of construction costs. I am going to develop this point further in two posts, on what is best called NITBYism – Not In Their Backyard – but this means that the incentive for poor and peripheral populations is not to care too much about development in rich centers. The marginal additional building in a rich city center is going to go to the upper middle class; sufficient construction would trickle to the middle class; only extensive construction would serve the working class, and then not all of it.
In the US, the marginal additional building may actually displace poor people, if no new construction is allowed, simply by removing low-income apartments. It may even create local demand for high-income housing, for example by signaling that the neighborhood has improved. In San Francisco, this is compounded by the tech shuttles, as a critical mass of Silicon Valley-bound residents can justify running shuttles, creating demand for more high-income housing.
The amount of construction required to benefit the bottom half of the national income distribution is likely to be massive. This is especially true in France and the UK, which have sharp income differences between the capital and the rest of the country; their backlogs of people who would like to move to the capital are likely in the millions, possibly the high millions. Such massive construction is beyond the pale of political reality: the current high-income resident population is simply not going to allow it – when forced to share a building with the working class, it pushes for poor doors, so why would it want zoning that would reduce the market-rate rent to what the working class would afford? The only political possibility in the short run is partial plans, but these are not going to be of partial use to the working class, but of no use to it, benefiting the middle class instead. As a result, there is no push by the working class and its social democratic political organs to liberalize construction, nor by the small-is-beautiful green movement.
Ultimately, the attempt to bypass restrictions on urban CBD formation by building edge cities, like every other kludge, is doomed to failure. The fundamental problem of rich people making it illegal to build housing nearby is not solved, and is often made even worse. The commutes get worse, and the inequality in commutes between the rich and the poor grows. Office space gets built, where otherwise it would spread along a larger share of the medium-rise CBD, but for most workers, this is not an improvement, and the environmental effects of more driving have negative consequences globally. And once city center is abandoned to the rich, there is no significant political force that can rectify the situation. What seems like a workaround and an acceptable compromise only makes the situation worse.
Difficult Transit
Many people have heard that certain regions are well-suited for these projects, for example the Northeast Corridor is unusually good for HSR because it links four major cities and several medium-size ones on a single line. By implication, there has to be a flip side, i.e. regions that are poorly-suited for HSR and cities that are poorly-suited for new rapid transit. If there weren’t – if every region were like the Northeast Corridor – then the ridership models would just have higher first-order estimates. Several proposals I’ve seen in comments and on my blogroll in the last few days are in areas where the urban geography makes it harder to justify such projects. These and a few others are the examples I will use in this post.
As usual, there’s a caveat that difficult does not equal bad. Some of these ideas are worth pursuing, but have more challenges that their easier counterparts do not, and if those challenges are solved, then they can perform well. One of the biggest success stories of modern rail investment, the TGV, is in an urban geography that’s not particularly conducive to rail: France’s secondary cities surround Paris in all directions (although Lyon and Marseille are collinear with Paris), the stub-end layout of stations in Paris and many other cities forces awkward branching, Lyon needed a business district to be built from scratch around Part-Dieu. France made this work, and it’s possible some of the projects on this list can be made to work in similar vein.
High-Speed Rail in Sweden
Project: greenfield HSR lines connecting Stockholm with Sweden’s major secondary cities, Gothenburg and Malmö.
The problem: Stockholm, Gothenburg, and Malmö do not lie on a straight line. The three cities are quite small by the standards of more populated countries: Stockholm has a bit more than 2 million people, Gothenburg has a bit less than a million, Malmö has 700,000. A line connecting just two of them, or even a Y-shaped line, is unlikely to get enough ridership to justify the construction costs of full HSR. There are no large intermediate cities: the largest, Linköping, has about 100,000 people. As noted above, French urban geography is not great for HSR, either, but at least the LGV Sud-Est could serve both Lyon and Marseille, and France’s greater population ensures that its secondary cities are large enough to generate enough traffic to fill an HSR line.
As a silver lining, Malmö is adjacent to Copenhagen, and the difficult part, bridging the Øresund, has already been done. While international lines tend to underperform, the tight cultural and economic connections between the Scandinavian countries make it likely that international projects within Scandinavia would be exceptions to the rule. Copenhagen would add another 2 million people at the end of the line. However, even that is unlikely to generate enough ridership to pay for 500-odd kilometers of greenfield HSR (plus a connection to Gothenburg).
Because of its poor urban geography for conventional HSR, Sweden has investigated cheaper solutions, allowing higher speeds on legacy track or on greenfield tracks built to lower standards. As a result, there is research into the possibility of high-speed tilting trains, running faster than the 250 km/h Pendolino. This research is likely to be useful in the UK and US, where the urban geography is better-suited for HSR but fully greenfield construction is obstructed by suburban development near the rights-of-way and by high construction costs, but the original context was faster speeds within Sweden.
High-Speed Rail in the Pacific Northwest
Project: greenfield HSR connecting Portland, Seattle, and Vancouver. This is not officially proposed anywhere that I know; current plans focus on incremental improvements to the Amtrak Cascades. However, every American HSR fantasy map I’ve seen (including the ones I’ve drawn) includes this link, since at least superficially based on city populations it would succeed.
The problem: getting out of the major cities involves a slog on curvy legacy track in areas where it’s hard to straighten the right-of-way. Heading north of Seattle, the route goes along the water, in terrain that is too hilly for an easy inland cutoff all the way to Everett, 50 km north. Getting out of Vancouver is also hard, because of suburban development in Surrey, and becomes even harder if one wants the Vancouver station to be Waterfront rather than Amtrak’s current stop, the less centrally located Pacific Central. The Northeast Corridor is said to have slowdowns near the major stations, leading to proposals to bypass them with new tunnels, but at no point are there 50 nearly-continuous km of low curve radii; the New Haven Line does not look as curvy, while the Shore Line farther east is easy to bypass on I-95.
The Seattle-Portland segment is much easier: the route heading south of Seattle is not constrained, and north of Portland it is possible to run alongside I-5. However, the most important intermediate cities, Tacoma and Olympia, can only be served with exurban stations, since getting into their centers would require the mainline to detour on curvy alignments.
Through-Run Commuter Rail in Chicago
Project: there are many proposals by transit activists to construct new infrastructure to enable through-running on Metra, analogous to Crossrail, SEPTA Regional Rail, the Paris RER, and multiple S-Bahns. Details differ, but other than the lines through Union Station, through-running generally means connecting Metra Electric to some of the lines feeding into Union Station from the north or the Union Pacific lines; UP-North is especially notable for serving dense neighborhoods and not having any freight traffic.
The problem: the layout of the lines entering the Chicago central business district makes it hard to build a coherent network. What I mean by coherent is that commuter lines can make multiple CBD stops to serve different CBDs, or different parts of the same CBD: in New York, a Penn Station-Grand Central connection would let trains serve both the West Side and the East Side. Look at the map proposed by Sandy Johnston, in the second link above: there is no station on the Near North Side, there is no connection from the West Loop stations to the Loop, and effectively lines are still going to be split between lines bound for the West Loop and lines bound for the Loop in the through-run system.
None of this is the fault of any of the people drawing these maps. To serve both the West Loop and the Loop, a line would have to go east-west in the vicinity of Union Station, where there is no legacy line pointing in the right direction. The options boil down to a long greenfield east-west subway, and an awkward transition to the preexisting east-west lines, BNSF (which is too far south) and UP-West (which is too far north), which to add another complication carry heavy freight traffic.
A system prioritizing north-south connections runs into different dilemmas, concerning the tradeoff between service to the Near North Side and easier connections to the rest of the North Side Metra lines. A north-south line connecting UP-North to Metra Electric through the Near North Side would be beautiful, and miss all other Metra lines and most L lines. Sandy’s proposal has Metra Electric swerving west to meet UP-North just north of its terminus at Ogilvie Transportation Center, meeting all L lines and potentially the North Side Metra lines but missing the job centers in the West Loop and Near North Side.
Rail to LaGuardia
Project: construct some rail extension to LaGuardia Airport. Which rail extension varies based on the proposal. The most mainstream proposal, in the sense that it was supported by Giuliani until it was torpedoed by neighborhood opposition, would have extended the Astoria Line east to airport grounds. More recent proposals from various activists have included not just the Astoria Line extension, but also a Northeast Corridor spur, an AirTrain from the Astoria Line, an AirTrain from Jamaica with JFK connections, a subway shuttle under Junction, and a subway running from the airport to 125th Street along the route of the M60 bus.
The problem: all of the above ideas face the same pair of problems. At the airport end, the airport competes with other urban destinations, rather than complementing them by lying on the same straight line with them. An extension from the west, such as the Astoria Line extension, needs to choose between serving the airport and serving the Astoria Boulevard corridor, which has high residential density and no nearby subway service; Astoria Boulevard itself is so wide that as with Queens Boulevard, an elevated line in its middle would be an improvement. Farther east, there is nothing that a LaGuardia extension could be continued to, because of Flushing Bay. An extension across the bay going to Flushing or College Point could be useful, but an extension of the 7 to College Point would be even more useful and avoid underwater tunneling. The bay, and more generally the Long Island Sound, dooms any proposal for a loop returning to the mainline, in the manner of Zurich Airport, while a spur would again compete for capacity with more important lines. Compare this with LAX, which, going along the Harbor Subdivision, is collinear with Inglewood, the Slauson corridor, and Union Station, and would have an easy connection to El Segundo.
At the other end, the question with every airport extension is, what does it connect the airport to? The answer for LaGuardia has to be the Upper East Side, where as I remember most riders originate; but there is no good way of connecting to the Upper East Side, which has no east-west subway line, and shouldn’t, as there are perhaps a hundred kilometers of higher-priority tunnels in the region. A connection to 125th Street is ruled out by the fact that Second Avenue Subway has an even better connection to 125th. The Astoria Line serves the Midtown hotel cluster well, and has a connection to the Lexington trains to the Upper East Side, but I doubt that it can beat a taxi across the bridge in non-rush-hour traffic.
Providence East Side Tunnel
Project: restore rail service through the East Side Rail Tunnel, with a new connection to Downcity at the western end and connections to new or restored rail lines in and beyond East Providence. In Jef Nickerson’s version, the trains are light rail and drop to the surface at the Downcity end. In mine, they continue elevated through Downcity, with a new station replacing Providence Station for both commuter and intercity rail. All versions include a stop at Thayer Street for Brown University service, should one be constructable at reasonable cost.
The problem: there’s no real need for local or regional service from the east along the tunnel (intercity service could be sped up by about half a minute to a minute by avoiding curves in Pawtucket). Light rail service would run into the problem of incredibly spread-out suburbanization east of Providence. Commuter rail would run into separate problems: the legacy lines go along the water in East Providence and don’t serve the town itself well; beyond East Providence, the line going north serves the same suburbs as the existing Providence Line minus Pawtucket, while the line going south would need extensive and costly restoration work to get to Fall River, and only passes through small and low-density intermediate points.
Cutting off Providence Station to move the city’s main station to the south is useful, but the only rail from Providence to Pawtucket and Woonsocket goes due north of Downcity and would be left out of this system. Shoehorning it to the same station that leads to the East Side Tunnel would produce every adverse impact of viaducts on cities: heavy visual impact coming from elevated-over-elevated grade separation, squeal coming from low curve radii, takings of condo buildings near the existing Providence Station.
What Elites Do Instead of Providing Services
I realized last year that even when they face a problem that is evidently about city services, city governments prefer to go for monuments that glorify their leadership. The most blatant example then was Cornell NYC Tech, the city-backed university whose campus construction alone is several times as expensive as the CUNY system per student. Since then I’ve tried to collect examples of power brokers proposing similar schemes, of which the worst is Larry Summers’ proposal to solve US inequality by spending public money on airport improvements. These are, to be frank, analogs of what American transit activists have to deal with routinely, with agencies preferring expensive iconic stations to ordinary capital and operating improvements in service.
The argument for Cornell NYC Tech is that New York needs tech entrepreneurs of the kind that Silicon Valley has, and that for that it needs its own Stanford. Instead of investing in STEM education across the CUNY system, or in its dedicated technological campus at the New York City College of Technology, it decided to start a private university from scratch, inviting other universities to bid on it. The city wanted Stanford to win the bid, but instead the winning bid was a joint effort by Cornell and the Technion, Israel’s technological university. The Technion was never run this way; it was started as a German-style technical university and is now a public university, funded and run on the same terms as the other Israeli public universities.
For Cornell NYC Tech, the city has lined up $2 billion in public and private funds for campus construction, expecting 2,000 students in 2037, which at 4% interest is $40,000 per student-year; annual capital and operating spending together, from all sources including tuition, is $16,000 per full-time equivalent student at the CUNY senior colleges and $11,000 at the CUNY community colleges (see PDF-page 65 of the budget request). This is the educational equivalent of airport connectors, which cities routinely spend several times per rider on as they would on ordinary subway extensions.
Summers’ proposal for airport improvements is in a way more frustrating, and more telling. He did not propose it as part of an independent infrastructure plan, but as a way to build public works to reduce US inequality, on the grounds that JFK is “an embarrassment as an entry point” and “the wealthiest, by flying privately, largely escape its depredations.” The proportion of people who fly privately is tiny; an income level at the bottom of the US top 1%, $400,000 per year, will buy you a lot of intercontinental business-class travel or some first-class travel, while affording a late-model Learjet requires an annual income of many tens of millions of dollars. Since poor people don’t fly as much as rich people, the users of JFK skew richer than the general city public.
My frustration comes from the fact that Summers is not trying to derail the conversation: he previously wrote about inequality as a problem and proposed standard center-left solutions, including raising taxes on capital gains and inheritances, supporting unionization, and (by implication) investment in public education. He clearly cares about the problem. He just seems to think that airport investment benefits the poor more than the rich. Most likely, this comes out of years of insider schmoozing with people so rich that they do own private jets, and generalizing to the considerably broader class of rich people.
In both cases, even on its stated merits, the proposal misses key facts about the situation. Silicon Valley began around Stanford, but once the initial tech cluster formed, it became independent of the university, so that even companies formed by people with no affiliation with Stanford or the Bay Area, such as Facebook, relocated to the area. New York is not going to grow its tech industry to the proportion of Silicon Valley’s by building an enterprise university any more than the Bay Area can become a world financial center by building affiliate universities for Columbia and NYU, from which many finance workers are recruited. As for JFK, like many of its users, when I arrive my first experience is the immigration line, a humiliating experience that involves fingerprinting and standing in line possibly for hours, depending on what terminal I use and what time I arrive. Public works will not solve that.
The problem with making even the merit-based argument is that public monuments are never truly merit-based projects. The decision-making process goes in the other direction: first the city elites (or, in case Summers’ proposal makes it into a national jobs bill, national elites) decide on something they want to see built, usually with the adjective world-class thrown in: a world-class university, a world-class airport, a world-class train station, a world-class office tower. The image of a world-class monument is more important than whether it works at its stated goal, such as improving education or transportation or fulfilling a need for class A office space.
Witness all the problems involving World Trade Center, which is being built entirely for prestige value, at enormous cost. The associated PATH station is $4 billion, almost as much as Second Avenue Subway, and about the same as 20 kilometers of subway in an average first-world city. One World Trade Center cost about $12,000 per square meter. I am not aware of any office tower in the world that is this expensive outside the WTC area and Hudson Yards; the tallest recent tower built in New York excluding 1 WTC, Bank of America Tower, cost about $5,500 per square meter in 2012 dollars, while the range I have seen for office towers in the 200+ meter range is about $2,500-6,000. Meanwhile, the WTC site struggles to find tenants: 1 WTC is almost half empty.
The sentiments after 9/11 ensured WTC would be rebuilt taller, regardless of actual demand in Lower Manhattan. Viewed through this lens, 1 WTC is not really about office space, but about proving a point about the power of US and New York to come back and not surrender to terrorism. This is why the transit spending went mainly to the PATH station and not to bringing the LIRR to Lower Manhattan, as proposed by the Regional Plan Association and studied officially in subsequent years: the LIRR project would’ve been about Lower Manhattan in general, without enhancing the specific prestige of WTC, while the billions poured into the WTC site and its PATH stations are all about the prestige.
Those other projects – various overrated transit schemes such as airport connectors, but also Cornell NYC Tech and Summers’ JFK proposals – are the same. They are not about what people living in, working in, or visiting the city need. They are not even about what they want. Whereas there was a citywide impulse to rebuild WTC taller after 9/11, there is no equivalent impulse to build an exclusive technical university, except among the power brokers. They are entirely about being able to say, “we have our own ___” and “I got that built.” It looks like development, but at best provides a fraction of the advertised value, and at worst provides nothing.
Whenever an urban project is proposed, the most important question to be asked is “what problem is this solving?”. Often, the problem is real, but there are much cheaper and less glamorous solutions. At other times, the project is a solution in search of a problem, and this is often detectable when proponents tout many unrelated benefits, almost as if the project can solve every major problem.
Compare this with solid public transit projects. Consider the lines I think North American cities should be focusing on, and the lines proposed in comments, especially as the Vermont subway in Los Angeles. In every single case, there are strong arguments for why the ridership of those lines would be high relative to the cost, and why existing subway lines (if any) and surface transit options are inadequate. The problem being solved is underserved neighborhoods with high transit demand, or in the case of the crosstown lines underserved origin-destination pairs in high demand. For other lines, not listed, there might be a separate argument regarding transit-oriented development: American cities tend to oversell TOD, as the problems with Hudson Yards show, but there do exist cases in which extending a subway line can allow dense development, or the construction of a new business district. But this involves figuring out where the development comes from – for example, the housing market may be very expensive, signaling high demand, or there may be projections of high future metropolitan population growth.
Usually, support for prestige projects to the exclusion of providing public services is the hallmark of moderates, along a broad arc from the center-left to the center-right. In the last few years, Republicans too far right to be called center-right have prioritized cutting taxes and spending and weakening the unions; signature projects conflict with their opposition to government spending. Conversely, urban leftist activists tend to oppose these prestige projects, on such grounds as gentrification, displacement, and private-sector involvement in public services.
The people in between those two ends are the ones most guilty of this kind of thinking. They are usually neo-liberal enough that they believe the government should champion market solutions and oppose industrial policy, and yet what they do is in many cases exactly industrial policy: Cornell NYC Tech is an attempt to curry favor with the technology industry. They are not so conservative as to believe government is always the problem, but the role they envision for government is to partner with the private sector to build public projects, which they tend to choose on grounds of what looks good rather than what provides the best public service. They know the buzzwords of urban politics well: for example, they’ll happily argue climate change to push a desired agenda that is usually only partly related to the problem, but lack the urgency of actual environmentalist activists and often also build roads and other dirty projects.
As with most bad things in politics, it’s a result of weak democratic institutions on the local level. American mayors tend to be elected dictators, and the opposition to them tends to be based on personality rather than ideology. In this non-ideological framework, the role of government is not to balance market and state solutions based on the voters’ preferences, but to aggrandize the leaders. Signature initiatives must appeal to the broad spectrum of non-ideological voters, so they can’t involve merely increasing spending on a chosen priority like education or transportation. Doing nothing is not an option – something has to be passed to remind people that the government still exists and has a purpose. The political incentives are against any incremental improvements that lead to tangible results, and for white elephants.
State Boundaries and the Northeast (Hoisted from Comments)
Aaron Renn’s repost on US states mattering more than some people imagine made me think about the difference in attitudes toward state lines in different US regions. Aaron’s examples of state lines mattering come from the Midwest, specifically Indianapolis and Columbus. My usual examples of state lines not mattering come from the Northeast. And those two regions treat states very differently.
Imagine a thought experiment in which Congress allows states to redraw their own boundaries – to split, merge, or change borders on their own accord. Let’s ignore the Senate – perhaps it still uses the old boundaries. Let’s also assume that this is not a completely de novo redrawing, akin to the creation of the French departments, in which states are drawn to be of specific size or population.
In such a case, in most of the US, there would be small changes only. Indiana would lose the suburbs of Chicago, Cincinnati, and Louisville, but otherwise remain intact. Virginia would lose the DC suburbs and gain the North Carolina suburbs of Hampton Roads. Tennessee would gain the Memphis suburbs, and maybe possibly lose Chattanooga. Oregon and Washington would merge. California, Texas, and Florida could either survive more or less intact or split based on metro area spheres of influence. I do not know Florida well enough, but my understanding is that Texas and California have strong enough state identity that in a referendum, their major regions would vote against a split. Ohio might have cleaved if it had had only Cleveland and Cincinnati, but I believe the presence of Columbus would make it survive more or less intact. The only Midwestern state that would be completely dismembered is Missouri, which has no equivalent of Columbus between St. Louis and Kansas City.
The opposite is true of the Northeast. From talking to people from both Upstate and Downstate New York, I believe a referendum would result in both sides voting for a split. New Jersey exists as a coherent entity only in jokes about the state made by people from other states. Pennsylvania has at least three regions that do not identify with one another. But at the same time, a coherent Northeast region exists: there are strong migration ties, not only among the four main coastal metro areas but also to and from Pittsburgh and the Upstate metro areas, which have stronger migration ties to New York and Philadelphia than to Cleveland and Chicago. Along the coast, there is also suburb-sharing, which has led to the formation of just four combined statistical areas; there’s even a chain of suburb sharing connecting New York, Allentown (now in the New York CSA), and Philadelphia, and there may soon be direct sharing between New York and Philadelphia.
Unlike in the Midwest or Texas or California, the Northeast does not have the same university-enforced state boundaries, which are probably a major reason why Columbus specifically has migration ties with the entire state but not much with areas just outside the state. In much of the Northeast, a huge number of students go to private universities. In Massachusetts as far as I can tell there are more students at private universities than at public four-year colleges. New York has a very large public university system, but the SUNY/CUNY distinction reinforces the state’s internal divisions rather than erasing them the way Ohio State does.
In terms of a national rail plan, the Northeast practically is a single state (as is the Pacific Northwest, but that’s just two states), from Portland to Quantico. In California, Texas, and Florida, and even Ohio and South Carolina, there are potentially strong in-state intercity rail routes. New York and Pennsylvania have those as well, but both have even stronger routes that cross many states. The Midwest is full of routes that cross states, but usually those connect one or two states to Chicago; the main exception, Chicago-Detroit via Toledo, is indeed not pursued, in favor of the inferior I-94 route that mainly serves Michigan.
Regional rail is similar. It is possible to come up with a plan that’s at least theoretically coherent for regional rail in most parts of the US, to be run by a state agency (or in borderline cases a bi-state agency), or by a local agency with powers delegated by the state. In the Northeast, it’s completely impossible. It’s not even possible to cleanly cleave the region into separate states for the four primary coastal metro areas, because commuter rail services on the Northeast Corridor need to share track with intercity trains at least part of the way, and building infrastructure to avoid such track-sharing is needlessly expensive.
I do not know of a transport association that crosses so many boundaries of subnational entities in Europe. French services are run by the regions; they sometimes cross boundaries, but only in the Midwestern sense of a region bordering Ile-de-France running some of its regional trains to Paris. In Germany, Berlin and Brandenburg have the same transport association, and for all intents and purposes are a single state when it comes to rail network planning. Swiss services cross cantonal borders, but at least the Zurich regional rail network is again French or Midwestern, in that there’s a core of services funded by the ZVV, and services in bordering cantons that run through. In the Northeast, there are good reasons to have commuter services run through from Philadelphia to New York along the Northeast Corridor and maybe also the West Trenton Line; even metro area boundaries are not hard, let alone state boundaries.
Stepping back from the thought experiment, let’s think of how to organize transportation planning in the US. In the Midwest and the South, states are coherent entities. In the West, the areas where states really do not mean much are deep in the Interior West, where there’s no point in building additional ground transportation infrastructure in the first place. But in the Northeast, there may have to be a special exemption treating all of it, including Northern Virginia, as a single state for planning purposes. It can’t be run as tightly as a single state because of its size and its natural division into several metro areas, but some joint service between its various divisions is unavoidable.
More in general, the Ohio example showcases how coherent state identities can be manufactured by the presence of state institutions. On maps that center Cleveland and Cincinnati, such as maps of which baseball and football teams people support, Ohio looks completely dismembered. And yet, the presence of Columbus and Ohio State changes everything when it comes to economic ties such as migration: suddenly, the otherwise-artificial state border means something in terms of social services.
This is not something Northeastern states can really do, nor should they. Pennsylvania has Penn State at State College, but it’s in a small, faraway town, and people who can instead go to Penn or Carnegie Mellon will. New York can expand CUNY and SUNY, but there are too many campuses to provide the same social function of Ohio State. Of course states should expand public higher education, in terms of both opening new campuses where needed and subsidizing tuition, but there’s no room to create a new Columbus; such expansion would provide a necessary service to state residents, but not change economic geography the way it did in Ohio.
New York Finds Massive Savings in Transit Construction
MTA Chairman Tom Prendergast announced that an internal review of MTA Capital Construction reveals that there are large wastes in the capital budget that could be eliminated with relatively simple steps. City comptroller Scott Stringer noted that Second Avenue Subway’s first phase, a two-mile stub, costs nearly $5 billion, whereas comparable lines in Paris, London, Tokyo, and other rich, global cities are a fraction of that amount. “Few lines cost more than half a billion dollars per mile,” his office added.
Prendergast’s office directed questions to MTA Capital Construction President Michael Horodniceanu. Horodniceanu outlined a list of items raising New York’s subway construction costs, including labor rules, legal issues, lack of training in new technologies, and insufficient public oversight of contractors. He added that there is little hope of seeing large reductions in the costs of ongoing projects, which are too far advanced, with most of the money already spent, but future subway construction could be done for much cheaper. He did not give a concrete estimate, but a senior official at MTA Capital Construction believed that with the requisite reforms, future subway lines would cost about half a billion dollars per mile in Manhattan and a quarter billion dollars in the Outer Borough.
When asked about the possibility of building Amtrak’s Gateway Project at lower cost, the source qualified those estimates, explaining that Gateway can probably be done for $3 billion, closer to a billion dollars per mile, as much of the project involves underwater tunneling. Officials from Amtrak did not comment on the record by the time this story went to press; however, a senior Amtrak manager speaking on condition of anonymity said, “we don’t really believe this is possible – there are lots of low estimates, and those always lead to budget overruns,” and said that the cost figures from the rest of the world are “irrelevant to America and American labor costs.”
Labor reactions to the announcement were mixed. James Ryan, the president of the Sandhogs Local 147 union, expressed skepticism that costs could be brought down without cutting wages or unionized jobs, and warned of a “race to the bottom” and a “low-wage Wal-Mart economy.” However, he added that he would accept changes as long as there was a guarantee of no job losses, wage cuts, or work rule reforms that would reduce union autonomy. TWU Local 100 President John Samuelsen, whose union represents subway workers rather than construction workers, proposed that the city and the state use the reduced costs to expand subway construction, specifically mentioning future phases of Second Avenue Subway. Currently only Phase 1 is funded, serving the Upper East Side.
Reactions within the state legislature were more positive. The greatest supporter is Assembly Speaker Sheldon Silver (D-Manhattan), whose Lower East Side district is slated to be served by the fourth and last phase of Second Avenue Subway. Silver noted that he was in support of the project even when it was just Phase 1, and said that he would work with the State Senate to pass all the legal reforms requested by Prendergast and Horodniceanu. In the State Senate, co-temporary presidents Dean Skelos (R-Long Island) and Jeffrey Klein (Ind. D-Bronx) had a cooler response. They both praised the revelations and said that they would consider passing the reforms requested, but did not mention any timeline for doing so. Several state legislators, speaking on condition of anonymity, expressed sentiments that the MTA is keeping two sets of books, and if the MTA just admitted to being able to save more money, then its budget requests for operations are also likely suspect. Skelos himself was cool to the proposals for a legislative audit of the MTA, but added, “I understand why people are upset and want to take a closer look.”
In contrast, within City Hall, reactions were overwhelmingly positive. The office of Mayor Bill de Blasio praised Horodniceanu and sent a press release calling MTA Capital Construction’s announcement “a courageous admitting of past mistakes, and an ambitious look forward.” De Blasio himself added that “Now is the time to see where we can build new lines that we thought were unaffordable,” and expressed confidence that all necessary changes can be achieved without running afoul of labor demands.
It is unclear whether the city or the MTA will propose any subway extensions, other than the completion of Second Avenue Subway. In 2008, the MTA’s then-chairman, Elliot Sander, proposed a 22-mile circumferential line running on lightly-used freight rights-of-way, connecting the Bronx, Queens, and Brooklyn without going through Manhattan. Regional Plan Association President Robert Yaro noted that his organization initially proposed this line in 1996 and proposed that the MTA build this line as well as express links to all three airports. He added that this line, which he calls Triboro, requires only about a mile of tunnel and is therefore much cheaper than fully underground lines. “The MTA has found a way to make everything cheaper, both subways and construction on existing infrastructure, so Triboro will be especially cheap now,” he said.
The community groups who could be reached by the article’s deadline were split. Transit activists within Harlem proposed that Second Avenue Subway be modified to add a fifth phase, going crosstown under 125th Street. The members of Harlem’s three community boards agreed that it would be useful, but most of them expressed concerns that it would lead to gentrification and displacement of existing residents, and said they would support the line if the city made an effort to build or preserve affordable housing. MTA planners who spoke on condition of anonymity proposed to extend the 2 and 5 down Nostrand Avenue in Brooklyn and the 4 down Utica Avenue, as per proposals from the 1970s. The response of the community boards in southeastern Brooklyn was more negative, saying that it would change the character of the neighborhoods relatively. One community board member warned that this would lead to “Manhattanization of our neighborhood.”
No member of the New Jersey state government responded to repeated requests for quotes by the article’s deadline.