Category: Incompetence

The Metro-North Accident and Train Control

Early in the morning on Sunday, a Metro-North train derailed on the Hudson Line, immediately south of the junction with Amtrak’s Empire Connection: maps of the derailment area can be found on the BBC, while The LIRR Today has a map and a diagram with speed limits. Four cars overturned, and four people died while more than 70 others were injured. The train was going at 82 mph (132 km/h) through a tight curve at Spuyten Duyvil with a 30 mph limit; the speed limit on the straight segment before the curve is 75 mph according to Rich E. Green’s map, which may be a few years out of date, and 70 mph according to the first New York Times article about the derailment. The curve radius appears to be 230 meters on Google Earth, putting the lateral acceleration rate at 5.8 m/s^2, minus a small amount of superelevation (at most 0.8 m/s^2, or 125 mm, to perfectly match the centrifugal force at the curve’s speed limit, and likely lower); the cutting edge of tilting trains allows about 2 m/s^2 lateral acceleration (see PDF-p. 2 of this article about the Pendolino), or 300 mm cant deficiency.

Initial reports of a mechanical brake failure seem unfounded: a National Transportation Safety Board briefing mentions that the brakes had functioned properly on brake tests and at previous stops on the journey (starting at 00:40 in the video). The focus is now on human error: the NTSB refused to say this outright, but beginning at 03:00 in its briefing video it trumpets positive train control as something that “could have” prevented the accident. Rick Gallant, who led California’s rail regulatory agency at the time of the 2005 Glendale crash, is also quoted as saying positive train control “probably could have” prevented the accident on NBC. Moreover, the train driver is quoted as having told investigators “he had become dazed before the accident, suffering what his lawyer referred to as ‘highway hypnosis.'” Metro-North’s spokeswoman made the strongest statement: “if the accident was caused by speeding, positive train control would have stopped it.”

It is extremely likely that a robust train control system would have prevented the accident, as it is capable of slowing the train sufficiently before it reaches a speed restriction. The bulk of this post will be dedicated to talking about what train control systems can do. There’s a large array of acronyms, some of which mean different things in different countries, and one of which has two different meanings.

Broadly speaking, train control can prevent two types of dangerous driving: crashing into another train on the same track, and excessive speeding. If the system detects dangerous behavior, it will automatically stop or slow down the train. Driverless trains are based on robust enough systems that are so automated they no longer need the driver. The hard part is having an on-board system figure out whether the train is traveling too close to another train or too fast, which requires communication with the signaling system; automatically slowing the train down is comparatively easy. In nearly all cases, the signals are static and embedded in the track systems, but in a few, usually high-frequency subways rather than mainline rail, the system directly communicates with the train ahead on the same track (this is moving block signaling, or communication-based train control).

It is century-old technology to stop a train that is about to enter a segment of track too close to another train (“signal passed at danger,” or SPAD). A train’s steel wheels close an electric circuit that detects whether there is a train on a block of track, and this communicates to the signals entering this block of track to prohibit trains from proceeding; see diagrams in the moving-block signaling link, which also show how it works in the more common fixed-block setup. A situation that electrically insulates the train from the track is therefore extremely dangerous and may lead to line shutdowns for safety. Any system with the capability to stop a train in such a situation is called automatic train stop, or ATS. The 79 mph speed limit on nearly all passenger train lines in the US comes from a 1947 regulation by the Interstate Commerce Commission (which has since morphed into the FRA) requiring ATS or in-cab signaling at higher speed; the intention was to force the railroads to install ATS by threatening a crippling speed limit, not to actually reduce train speed.

It is much harder to enforce speed limits. ATS systems do not have to enforce speed limits: at Amagasaki, there was an ATS system that would have stopped a train running a stop signal (as it had earlier on the trip), but no protection from excessive speeding, which is what led to the crash. The signaling system needs to be able to communicate both permanent and temporary speed restrictions. It is nontrivial to maintain an up-to-date database of all speed restrictions on an on-board computer, or alternatively communicate many different speeds from wayside track signals to the train’s computer.

In 2008, the FRA mandated positive train control (PTC) as a result of the Chatsworth crash; PTC is a term that doesn’t exist outside North America, and refers to an automatic train control system capable of not just ATS but also enforcement of all speed restrictions. In Europe it is called automatic train protection, or ATP, and in Japan it is called automatic train control, or ATC. It is common in the US to do trackwork on one track of a multiple-track railroad and slap a temporary speed restriction on adjacent track, and enforcing such limits to protect wayside workers is specifically part of PTC.

Because the ATC system requires trainside equipment, a train that travels between different systems will need more equipment, raising its cost. In Europe, with its hodgepodge of national standards, some international trains require 7 different systems, raising locomotive costs by up to 60%. This led to the development of a unified Europe-wide standard, European Train Control System (ETCS), which combined with GSM radio for communication between lineside signals and the train is called European Rail Traffic Management System (ERTMS). The obligatory cost and schedule overruns of any IT project have plagued this system, and led to delays in installing train protection on some lines, which led to a fatal accident in Belgium. However, the agony of the ERTMS project has for the most part already passed, and now there is a wide variety of vendors manufacturing equipment to the specified standards, leading to widespread installations on new and upgraded lines outside Europe. As of September of 2013, ETCS is installed on 68,000 track-km and 9,000 vehicles worldwide.

Although ETCS is an emerging global standard (outside Japan, which has a vast system of domestic ATC with multiple domestic vendors), American agencies forced to install PTC have not used it. California HSR is planning to use ETCS, and Amtrak’s signaling system on much of the Northeast Corridor, Advanced Civil Speed Enforcement System (ACSES), with full implementation on the Northeast Corridor expected by this year, is similar to ETCS but not the same. Elsewhere in the US, systems have been bespoke (e.g. on Caltrain), or based on the lower-capacity systems used by the freight operators.

Metro-North does not have PTC. It has an ATS system that protects against SPAD, but can only enforce one speed limit, the maximum speed on the line (MAS). As the maximum speed on the outer Hudson Line is 90 mph, the system cannot enforce any lower speed, and so the train could travel at 82 mph even in 70 or 75 mph territory, let alone 30 mph territory. More modern systems can enforce several speed limits (e.g. the TGV’s TVM), and the most modern can enforce any speed limit, in 1 km/h or 1 mph increments.

Metro-North and the LIRR have been trying to wrangle their way out of the PTC mandate, saying it offers “marginal benefits”; a year and a half ago, the New York Post used the word “outrageous” to describe the PTC mandate, saying it would cost over a billion dollars and that the money could go to capacity improvements instead, such as station parking. Lobbying on behalf of Metro-North and the LIRR, Senator Charles Schumer made sure to amend a proposed Senate transportation bill to give the railroads waivers until 2018, so that they could devote resources to more rush hour capacity from the outer suburbs (such as Ronkonkoma) to Manhattan and fewer to safety. According to Siemens, the work will actually take until 2019, and Siemens says it “has developed PTC specifically for the North American market,” in other words built a bespoke system instead of ETCS. (ACSES was developed by Alstom.)

Because the systems developed for the US are based on the needs of American freight railroads and perhaps Amtrak, which do not need as much capacity in terms of trains per hour as the busiest commuter lines, they are much lower-capacity than those used in Europe. The LIRR and Metro-North have far busier mainline tracks than any other US commuter rail system with the exception of the inner part of New Jersey Transit, which is equipped with ACSES as part of the Northeast Corridor; to modify the system to their needs raises costs, as per the New York Post article. The MTA released the following statement (see also mirrors on Fox and CBS):

The MTA began work to install Positive Train Control on the Long Island Rail Road and Metro-North Railroad in 2009. To date, the MTA has budgeted nearly $600 million for elements of PTC installation, including a $428 million procurement last month for a system integrator. Full implementation is estimated to cost $900 million, and the MTA will make sure the appropriate funding is made to implement PTC on the most aggressive schedule possible. However, implementing PTC by the 2015 deadline will be very difficult for the MTA as well as for other commuter railroads, as the Federal Railroad Administration (FRA) and the Government Accountability Office (GAO) have both concluded.  Much of the technology is still under development and is untested and unproven for commuter railroads the size and complexity of Metro-North and LIRR, and all of the radio spectrum necessary to operate PTC has not been made available. The MTA will continue its efforts to install PTC as quickly as possible, and will continue to make all prudent and necessary investments to keep its network safe.

Of course, the technology is no longer under development or untested. Just ask the Belgians, the Swiss, the Chinese, the Saudi, or the Taiwanese. Older technologies meeting the definition of PTC exist practically everywhere on mainline trains in the European and Asian first world. Urban commuter lines in Tokyo such as the Tokaido Main Line and the Yamanote Line, each with more ridership than all North American commuter lines combined, are equipped with ATC. The RER A, with slightly less ridership than all North American commuter lines combined, has a train control system providing moving-block signaling capability on the central trunk. A Swiss mainline with 242 passenger and freight trains per day and minimum train spacing of 110 seconds at 200 km/h has ERTMS as its only ATP system, and Switzerland expects to fully equip its network with ERTMS by 2017.

Although the US mainline rail system is freight-primary, with different needs from those of Europe south of Scandinavia (e.g. critical trunk lines are thousands of kilometers long and lie in sparsely-populated territory), the same can’t be said of the Northeastern commuter rail lines, most of which only see a few daily freight trains and are dominated by tidal flows of commuter trains with high traffic density at rush hour. Rush hour traffic levels approaching 20 tph per track are routine, with 24-26 on the Northeast Corridor entering Penn Station from New Jersey. It is incompetent to try to adapt a system developed for long-distance low-cost freight railroads and ignore one developed for busy commuter lines just because it has an E for European in its name.

While most European countries have long implementation timelines coming from a large installed base of good but not top-line legacy signaling, countries with inferior systems sometimes choose to replace their entire signaling systems, as the passenger-primary parts of the US should. Denmark, whose intercity rail far lags that of most peer European countries, decided to replace its signaling system entirely with ERTMS. The projected cost is €3.2 billion, of which €2 billion is for ERTMS on the network, €400 million is for equipping the Copenhagen S-Bahn with CBTC, and €800 million is contingency; the total length of the system is 2,132 route-km and 3,240 track-km.

At a million euros per route-km, exclusive of contingency, Metro-North could install the system on all east-of-Hudson lines, except the New Haven Line, where Amtrak plans to install ACSES, for about $450 million, and the LIRR could install the system on its entire system (including parts currently without any signaling) for about $650 million. Denmark has about 700 trainsets and locomotives to install the system on, in addition to tracks; on the LIRR and Metro-North, those figures are about 150 each, although this assumes that trainsets would be permanently coupled, whereas today they run in married pairs, so that in an eight-car unit there are four cabs where only two are needed. If the LIRR and Metro-North agreed to treat trains as permanently-coupled sets, then the scope of the order would be about 40% of the size of the Danish fleet, consistent with a total cost of about a billion dollars.

This would also allow higher capacity than the current systems, which could squeeze more trains onto busy lines, so it wouldn’t be at the expense of capacity improvements. In particular, the LIRR could keep postponing the $1.5 billion Main Line third track to Hicksville project, and instead run trains on the currently double-track bidirectionally (today they run one-way at rush hour, to accommodate local and express service) using the very high frequency that ETCS permits. Another project, which Sen. Schumer thinks is more important than PTC, a $400 million plan to double-tracking the outer part of the Main Line from Farmingdale to Ronkonkoma, could also be postponed while still providing the necessary capacity.

Although both of the LIRR multi-tracking projects’ cost figures are enormous – the third track is about $100 million per kilometer, almost what a subway in suburbia should cost, and the outer second track is $15 million per km, more reasonable but still very high – adding tracks is in general more expensive than adding signals. IT procurement is expensive and prone to cost overruns, but once the initial system has been developed, the marginal cost of implementing it in new but similar environments is relatively low; ETCS would cost about the same on the LIRR and Metro-North as the MTA plans to spend on signaling, but provides better functionality as it’s compatible with their high traffic density. Organisation vor Elektronik vor Beton.

Of course the first step in the organization before electronics before concrete slogan is improving the state of the organization. In terms of safety, there may be scope for better training, but the train driver according to the NTSB has 10 years’ experience (start at 02:20 in the video) and based on his work schedule would have had enough time to get a full night’s sleep before his shift started (start at 07:25). Since there is no obvious organizational way to further improve safety, electronics is the next step, and this means installing a good PTC system in a timely manner.

However, in terms of cost, there is something to be done. While the MTA claims PTC is too expensive and provides little benefit, Metro-North spent $80 million a year on conductors’ salaries in 2010 (although it’s been going down, to about $65 million by 2012) and the LIRR spent another $95 million (in either 2010 or 2012), both numbers coming from the Empire Center’s SeeThroughNY. About six years’ worth of conductor salaries would pay for full PTC; future savings are free. The NTSB briefing said there were 4 conductors on the train (start at 09:15). The main duty of conductors is to sell, check, and punch tickets, an old-time rail practice that has been abolished in modern commuter railroads throughout the first world.

A commuter train needs between 0 and 1 conductor. Stephen Smith quotes Vukan Vuchic, a professor of transportation engineering at Penn who was involved in the implementation of SEPTA’s through-running in the 1980s, as saying that ticket-punching is “extremely obsolete” and “very 19th century.” A tour of any of the major urban commuter rail systems of Europe will reveal that a few, such as the Paris RER and the London systems, use turnstile, while most use proof-of-payment, in which roving teams of ticket inspectors only check a small proportion of the trains, slapping fines on people caught without a valid ticket. On American light rail lines, which are often similar in role to German commuter rail lines (especially tram-trains) except that they run on dedicated greenfield tracks, this is routine; this can and should extend to commuter mainlines. While the electronics is needed to handle safety, this organizational improvement would pay for the electronics.

Although the investigation seems to be going in a competent manner, the MTA’s position on the relevant issues in general does not come from a position of competence. It is not competent to have this many redundant employees but then cry poverty when it comes to avoiding crashes and derailments. And it is not competent to pretend that there is nothing in Europe or Japan worth using for American signaling systems. The US did not invent PTC – at most, it invented the term for what’s called ATP or ATC elsewhere. It shouldn’t act like it’s the only place in the world that uses it.

Sometimes, Half a Line is as Good as No Line

The perfect is not the enemy of the good when it comes to rail projects. The half-done job is. In a trivial sense it’s obvious that half a tunnel across a mountain is useless. But even partial lines that have some uses are sometimes so much less useful than the full line, that the economic benefits of completing the half line to the full system are actually greater than those of building the first half. In many cases, even partial lines that are very good on their own have relatively easy extensions with very good economics.

This is primarily true for intercity rail, since costs are roughly proportional to route-km whereas benefits (e.g. high-speed rail operating profits) are proportional to passenger-km: once a first-phase rail line is in place, any future phase such that passengers will use the first phase for much of their travel will generate a large amount of passenger traffic relative to infrastructure construction. Probably the simplest example of this is extending California HSR to Sacramento: once a Los Angeles-San Francisco system is in place, especially if the route goes over Altamont Pass, extending to Sacramento requires only about 100 km of additional construction (180 if the LA-SF route is via the currently planned Pacheco Pass route), in flat land, but people would be taking the train from Sacramento to Los Angeles, a distance of about 600 km. Thus, despite generating much lower ridership than San Francisco, Sacramento is a highly beneficial extension of California HSR, once the LA-SF first phase is in place.

There are several more places in North America that are like this. When I tried applying a very primitive ridership model to American city pairs, what I found is that next to the Northeast Corridor, the highest-performing lines are extensions of the Northeast Corridor to the south. This is for the same reason as with Sacramento: once Boston-New York-Washington is in place, an extension to Richmond would generate 540 passenger-km of New York-Richmond travel on just 180 route-km of Washington-Richmond HSR, and thence extensions to Raleigh and Norfolk would be similarly high-performing, and so on. Some of those extensions would add about 40 million passenger-km per route-km of new construction, compared with about 28 million on the Northeast Corridor alone; in other words, assuming constant per-km cost, the rate of return on some of the extensions is higher than on the Northeast Corridor trunk. Similarly, although international HSR links are overrated, once New York-Buffalo is in place, an extension into Toronto becomes high-performing (with about 30 million passenger-km per new route-km after a fudge factor accounting for the underperformance of international city pairs), which is especially useful given that New York-Buffalo’s projected traffic based on said primitive model is marginal.

In those cases, the picture is bright, in that the first phase is strong on its own, and then future phases become natural extensions, which can be funded on the heels of the first phase’s success.Unfortunately, in many cases the situation is different, and the first phase is really a half-built line that isn’t much better than nothing, at least on the proposed merits. For example, High Speed 2’s rising costs are causing the cost-benefit analysis to head well into marginal territory: as per PDF-page 15 of a Parliamentary primer, the benefit-cost ratio of the first phase, London-Birmingham, is now down to 1.4, while this of the full system as proposed by the Cameron administration, going to Manchester and Leeds, is 1.8. Although 1.4 > 1, common practice in Europe is to build only projects with benefit-cost ratios higher than 1.2 or 1.3, because of the risk of further cost escalations (although the stated cost includes a generous contingency factor). The environmental benefits are likewise lopsided in favor of full construction, according to pro-HSR group Greengauge 21: three quarters of the benefits come from the second phase. This is because few people fly from London to Birmingham or Manchester already, since the existing medium-speed trains are fast enough at these distances to outcompete low-cost flights; however, there’s a large volume of people flying from London to Glasgow, and it is expected to take the full opening of HS2 to get enough of those fliers to switch to make a significant difference.

In this case, HS2’s first phase is better than nothing, and the problem stems from extremely high costs: without contingency, London-Birmingham, a distance of about 180 km, is projected to be about $23 billion after PPP conversion, which at nearly $130 million per km is worse than California HSR, which has to tunnel under tall mountain ranges. With contingency, it is $175 million per km, not much less than the projected cost of the majority-underground Chuo Shinkansen maglev. If the costs were brought down to reasonable levels, the first phase alone would be highly beneficial, as can only be expected given the size of London and the secondary cities of the West Coast Main Line.

In some other proposed cases, even the benefits are marginal. Worse, sometimes attempts to cut costs lead to steeper cuts in benefits. The example that motivated this post is a recent story of a proposal for HSR in Colorado, which is not planned to serve the built-up area of Denver at all, but instead stop at the airport. An airport stop without a downtown stop is unacceptable anywhere, especially given Denver’s airport’s large distance from downtown (30 km, vs. 15 km in Shanghai, where most HSR trains stop at the domestic airport and only a few stop downtown at Shanghai Station). It is especially unacceptable given that Denver is to be connected to cities that are within easy driving or medium-speed rail distance: Fort Collins is 100 km north of Denver, Colorado Springs is 110 km south, and Pueblo, which is only proposed as part of a larger second phase together with a Rocky Mountain crossing, is 180 km south. At the distances of Fort Collins and Colorado Springs, the egress time would eat all time advantage of HSR over driving; at the distance of Pueblo, it would eat most of the time advantage. Saving money is nice, but not when it makes the entire project useless except to the occasional Fort Collins- or Colorado Springs-based flier.

One can go further and ask why even build HSR at such short distances. On the Northeast Corridor, full-service HSR is a great investment, because of the combination of extremely thick city pairs at the 360 km mark (New York-Washington and New York-Boston) and one reasonably thick pair at the 720 km mark (Boston-Washington), which is too far for medium-speed rail to compete with air. Philadelphia’s presence boosts the case for HSR – it conveniently provides a source of reverse-peak traffic away from New York and Washington, adds long-distance travelers to Boston, and adds short-distance high-speed travelers to New York – but by itself it’s not worth it to build HSR at the distance of New York-Philadelphia. If Boston and Washington weren’t there, then incremental upgrades with a top speed of 200 km/h or maybe 250 km/h would be best, and higher speeds would just waste money on more expensive trains and create noise pollution and higher energy consumption.

The same analysis is true of faster-than-HSR travel modes. The other motivation for this post, in addition to Colorado’s proposal, is Japan’s attempt to export maglev to the US, proposing the Northeast Corridor as the route to run maglev on, with Baltimore-Washington as the first segment, which Japan proposed to build for free, as a loss leader. Nobody needs maglev from Baltimore to Washington: the egress time is going to ensure the benefits of maglev speeds over HSR speeds are small, and even the benefits of HSR speeds over fast commuter rail speeds are limited. The Chuo Shinkansen is only planned to be about 440 km long, but it’s a capacity boost on a line that already has HSR with extremely high ridership, and not just a speed upgrade. Elsewhere, Japan builds conventional HSR rather than maglev, even for inter-island travel, where people fly today since the Shinkansen takes 5+ hours and flying takes an hour.

Part of my distaste for Hyperloop essentially comes from the same problem: it tries to compete with HSR at a distance where HSR is appropriate and faster trains are not. All of the technical problems of Hyperloop – thermal expansion, claustrophobic vehicles, extreme levels of lateral acceleration – are solvable, at the cost of more money. The technology is feasible; it’s Musk’s order-of-magnitude-too-low cost estimate that I object to. The problem is that at LA-SF distance, access and egress time and security will eat the entire time advantage over conventional HSR, in similar vein to the problem with siting Denver’s HSR station at the airport. Conventional HSR still involves regular trains that can run on electrified legacy lines, so it’s cheap to go the first and last miles within the Bay Area and the LA Basin; maglev doesn’t have this ability and neither do vactrains. Thus there will always be the problem with the first and last mile, which can be solved only by spending even more money – even in the case of the Chuo Shinkansen, JR Central decided that Shinagawa, just outside Central Tokyo, is good enough, and there’s no need to spend further money to get trains into Tokyo Station. But the access, egress, and security time penalties are constant, whereas the time advantage over slower modes of transportation grows with distance.

So by all means, let’s think about maglev from New York to Chicago and Miami and from Los Angeles to Seattle, where HSR is too slow to compete with air travel; let’s think about a vactrain at transcontinental scales, were open-air maglev is too slow. There’s a reason this year’s April Fool’s post emphasized that the vactrain system should be intercontinental and globally connected. I don’t think maglev in the US or a vactrain anywhere pans out in the next few decades, but at least at this greater scale they wouldn’t be crowding out a technology that can succeed, i.e. conventional HSR at the scale of the Northeast Corridor or California.

Sometimes, starting small means failing. A strong first phase with stronger second phases, such as LA-SF or Boston-NY-DC, is likely to become a success and motivate the political system to spend additional money, partly from first-phase profits, on extensions. A weak first phase that needs additional phases to pan out won’t lead to the same extensions. When a white elephant project opens, nobody listens to critics who say it should’ve been built bigger, even in the uncommon cases when those critics are right. Colorado HSR as proposed is going to get faltering ridership, not enough to justify the cost, and cause widespread disaffection even with potentially strong rail projects in Colorado. The same is true of any faster-than-HSR project that tries to replace HSR instead of capitalize on its strength in serving much longer-distance city pairs. If Musk succeeds in causing the median Californian to turn away from HSR and build Hyperloop instead, then first Hyperloop will turn out to cost ten or more times as much as Musk predicted (for which people won’t blame Musk but the government – Musk’s sycophants will tsk-tsk from the sideline and say that if only he had been in charge), and second the ridership won’t cover the costs, leading people to decide that any linear transportation corridor is bad and the government should stick to highways and airports.

Who Regional Rail is For

A few rail proposals have happened in the last few months that begin with the concept of improving transit access in the suburbs, and end in a bad direction. These center on airport-oriented rail extension, which in the case of New York means building transit to Newark, JFK, and LaGuardia, as a high priority; consider Chris Christie’s proposal for a PATH link to Newark Airport, and proposals on PDF-pp. 17-18 of Next New York for airport service. Instead of this, let me expound a bit on what the most promising travel markets for regional rail are:

1. The through-running aspect is useful for people whose commute requires them to cross the CBD or go around it. In New York, this means people who live in New Jersey and work in Brooklyn, Queens, the Bronx, or Long Island, or vice versa; and people who live in Westchester and points north, including Connecticut, and work in Brooklyn, Staten Island, possibly Queens or Long Island, or Newark and points south, and again vice versa. None of these travel markets is by itself very large, but some, especially those involving people working in Brooklyn and Queens, are of moderate size and together they’re about 150,000 commuters, about as many as use each of New York’s three commuter rail system at two trips per person. (All numbers are as of 2000 and come from the census.)

2. Additional lines allow travel even on markets that are not really through-running. A Staten Island-Manhattan tunnel is likely to be used primarily by people from Staten Island working in Manhattan or Downtown Brooklyn rather than by suburb-to-suburb commuters. Staten Island itself produces about 80,000 commuters bound toward Manhattan and Brooklyn, and electrification of the Erie Lines and a connection to Lower Manhattan opens up rail service to about 70,000 Manhattan-bound commuters from Bergen and Passaic Counties.

3. As a continuation of point 2, lines laid out in a way that serves secondary CBDs on the way from the suburbs to the primary CBD can produce additional ridership. For example, the LIRR already has some Brooklyn-bound commuters, and New Jersey Transit some Newark-bound ones; the Erie Lines could produce Jersey City-bound commuters, and one of the reasons to build the Lower Manhattan tunnel via Pavonia or Exchange Place rather than Hoboken is to serve the larger secondary CBDs there. Hudson County has about 30,000 workers commuting in from Bergen and Passaic Counties and 50,000 from Essex County and points west and south.

4. High all-day frequency of local trains together with fare integration with local transit allows people living and working within each inner-suburban region to use regional rail to get to work. The urban analog is that Brooklynites who work in Brooklyn often use the subway, and drive mainly if their commute is orthogonal to the Manhattan-bound orientation of the subway lines. Residents of Newark, Yonkers, Elizabeth, Paterson, Mount Vernon, New Rochelle, and Hempstead drive at higher rates than residents of the Outer Boroughs even when the poverty rates are comparable: a transit trip from Elizabeth to Newark today is either a bus that gets stuck in traffic or an expensive train that comes twice every hour off-peak and only stops at Downtown Elizabeth, the airport, and Downtown Newark. In 2000, only 26% of people working in Downtown Newark got there on public transit (see PDF-p. 13 of this report).

Airports are not very significant traffic generators. The AirTrain JFK has 5.5 million annual riders; the average ratio of annual to weekday ridership on the subway is 300 (on commuter rail, which has a more pronounced peak, it’s about 270), so that’s equivalent to about 18,000 weekday riders. The Newark version has 2 million annual riders. Regional rail is a way to build low-cost rapid transit in areas where there already are mainline railroads that can be used for local and regional service. Deviations need very high ridership to be justified. The tunnels through the CBD, such as the central RER and S-Bahn tunnels or the tunnels under Manhattan that I propose, bring in commuters from many suburbs into the primary CBD and also connect multiple secondary CBDs. Greenfield lines used for some airport extensions, such as in Zurich, are justified by their short length, connections to trains from all over Switzerland, and very high traffic (with nearly 50% mode share) coming from the use of the airport’s landside concessions as a shopping destination.

In contrast, an examination of the four above main travel markets suggests specific ways regional rail must be built and operated to maximize its usefulness. Brooklyn is the largest destination in the region outside Manhattan, and this means that tunnels serving it from more directions than just that of Long Island should be a higher priority. Queens is the second largest destination, and this means that commuter trains using the Northeast Corridor should stop there, with easy transfers to Jamaica, Flushing, and Long Island City for trains not serving those destinations; Sunnyside Junction would especially useful for this.

Moreover, travel market #4 is the most underrated. The potential traffic volume dwarfs all others. Newark has about 4,000 workers who live in areas who would be served by through-running, such as Brooklyn and the Bronx. It has 36,000 workers who live in the city itself, 30,000 who live in the rest of Essex County, 17,000 who live in Union County, and another 17,000 who live in points farther south. The Northeast Corridor, North Jersey Coast, and Morris and Essex Lines already exist, but provide expensive, infrequent service, with stations spaced too far apart for walking to the station. Christie’s PATH extension tellingly does not include a stop at South Street, but instead goes nonstop from Newark Penn Station to the Newark Airport train station. It’s of paramount importance to raise the transit mode share on these internal inner-suburban travel markets.

Tokyo’s CBD has about 2 million workers, the same as Downtown and Midtown Manhattan. The reason Tokyo has so much more rail ridership than New York is not a bigger downtown, or better airport service, but better rail service to secondary job centers, which themselves grow around train stations more closely than in New York. But Downtown Brooklyn, parts of Queens, and Downtown Newark at least already have the transit access, both by subway/PATH and by commuter rail. Present-day commuter rail just doesn’t provide good enough service to compete with parking rates and traffic jams outside Manhattan.

Loopy Ideas Are Fine, If You’re an Entrepreneur

There is a belief within American media that a successful person can succeed at anything. He (and it’s invariably he) is omnicompetent, and people who question him and laugh at his outlandish ideas will invariably fail and end up working for him. If he cares about something, it’s important; if he says something can be done, it can. The people who are already doing the same thing are peons and their opinions are to be discounted, since they are biased and he never is. He doesn’t need to provide references or evidence – even supposedly scientific science fiction falls into this trope, in which the hero gets ideas from his gut, is always right, and never needs to do experiments.

Thus we get Hyperloop, a loopy intercity rail transit idea proposed by Tesla Motors’ Elon Musk, an entrepreneur who hopes to make a living some day building cars. And thus a fair amount of the media coverage is analysis-free summary of what Tesla already said: see stenography by ABC, Forbes, the Washington Post’s Wonkblog, and even BusinessWeek (which added that critics deal with “limited information”). Some media channels are more nuanced, sometimes even critical; the Wall Street Journal deserves especial credit, but Wonkblog also has a second, mildly critical post. But none has pressed Musk or Tesla about the inconsistencies in his proposal, which far exceed the obvious questions about the proposed $6 billion price tag (compare $53 billion in today’s money for California HSR). For better prior criticism, see James Sinclair’s post and Clem Tillier’s comment on California HSR Blog.

My specific problems are that Hyperloop a) made up the cost projections, b) has awful passenger comfort, c) has very little capacity, and d) lies about energy consumption of conventional HSR. All of these come from Musk’s complex in which he must reinvent everything and ignore prior work done in the field; these also raise doubts about the systems safety that he claims is impeccable.

In principle, Hyperloop is supposed to get people from Los Angeles to San Francisco in half an hour, running in a tube with near-vacuum at speeds topping at 1,220 km/h. In practice, both the costs and the running times are full of magic asterisks. The LA end is really Sylmar, at the edge of the LA Basin; with additional access time and security checks, this is no faster than conventional HSR doing the trip in 2:40. There is a crossing of the San Francisco Bay, but there’s no mention of the high cost of bridging over or tunneling under the Bay – we’re supposed to take it on faith the unit cost is the same as along the I-5 corridor in the Central Valley.

There is no systematic attempt at figuring out standard practices for cost, or earthquake safety (about which the report is full of FUD about the risks of a “ground-based system”). There are no references for anything; they’re beneath the entrepreneur’s dignity. It’s fine if Musk thinks he can build certain structures for lower cost than is normal, or achieve better safety, but he should at least mention how. Instead, we get “it is expected” and “targeted” language. On Wikipedia, it would get hammered with “citation needed” and “avoid weasel words.”

The worst is the cost of the civil infrastructure, the dominant term in any major transportation project’s cost. Hundreds of years of incrementally-built expertise in bridge building is brushed aside with the following passage:

The pods and linear motors are relatively minor expenses compared to the tube itself – several hundred million dollars at most, compared with several billion dollars for the tube. Even several billion is a low number when compared with several tens of billion proposed for the track of the California rail project.

The key advantages of a tube vs. a railway track are that it can be built above the ground on pylons and it can be built in prefabricated sections that are dropped in place and joined with an orbital seam welder. By building it on pylons, you can almost entirely avoid the need to buy land by following alongside the mostly very straight California Interstate 5 highway, with only minor deviations when the highway makes a sharp turn.

In reality, an all-elevated system is a bug rather than a feature. Central Valley land is cheap; pylons are expensive, as can be readily seen by the costs of elevated highways and trains all over the world. The unit costs for viaducts on California HSR, without overhead and management fees, are already several times as high as Musk’s cost: as per PDF-page 15 of the cost overrun breakdown, unit costs for viaducts range from $50 million to $80 million per mile. Overheads and contingencies convert per-mile cost almost perfectly to per-km costs. And yet Musk thinks he can build more than 500 km of viaduct for $2.5 billion, as per PDF-page 28 of his proposal: a tenth the unit cost. The unrealistically low tunnel unit cost is at least excused on PDF-page 31 on the grounds that the tunnel diameter is low (this can also be done with trains if they’re as narrow as Hyperloop, whose capsule seating is 2-abreast rather than 4- or 5-abreast as on HSR; see below on capacity). The low viaduct unit cost is not.

This alone suggests that the real cost of constructing civil infrastructure for Hyperloop is ten times as high as advertised, to say nothing of the Bay crossing. So it’s the same cost as standard HSR. It’s supposedly faster, but since it doesn’t go all the way to Downtown Los Angeles it doesn’t actually provide faster door-to-door trip times.

Nor is the system more comfortable for the passenger. Levitating systems can get away with higher cant than conventional rail because they sway less: Transrapid’s lateral acceleration in the horizontal plane is about 3.6 m/s^2 in Shanghai, and the company claims 4.37 m/s^2 is possible. On standard-gauge rail, the conversion rate is approximately 150 mm of total equivalent cant per 1 m/s^2. HSR cant tops at 180-200 mm, and cant deficiency tops at 180 mm for Talgos and 270-300 mm for medium-speed Pendolinos, so about 2.5 m/s^2 at high speed; this was shown safe by simulation in Martin Lindahl’s thesis, which is also a good source for track construction standards.

But Hyperloop goes one step further and proposes a lateral acceleration of 4.9 m/s^2: 0.5 g. This is after canting, according to the standards proposed:

The Hyperloop will be capable of traveling between Los Angeles and San Francisco in approximately 35 minutes. This requirement tends to size other portions of the system. Given the performance specification of the Hyperloop, a route has been devised to satisfy this design requirement. The Hyperloop route should be based on several considerations, including:

  1. Maintaining the tube as closely as possible to existing rights of way (e.g., following the I-5).
  2. Limiting the maximum capsule speed to 760 mph (1,220 kph) for aerodynamic considerations.
  3. Limiting accelerations on the passengers to 0.5g.
  4. Optimizing locations of the linear motor tube sections driving the capsules.
  5. Local geographical constraints, including location of urban areas, mountain ranges, reservoirs, national parks, roads, railroads, airports, etc. The route must respect existing structures.

For aerodynamic efficiency, the velocity of a capsule in the Hyperloop is
typically:

  • 300 mph (480 kph) where local geography necessitates a tube bend radii < 1.0 mile (1.6 km)
  • 760 mph (1,220 kph) where local geography allows a tube bend > 3.0 miles (4.8 km) or where local geography permits a straight tube.

These bend radii have been calculated so that the passenger does not experience inertial accelerations that exceed 0.5 g. This is deemed the maximum inertial acceleration that can be comfortably sustained by humans for short periods. To further reduce the inertial acceleration experienced by passengers, the capsule and/or tube will incorporate a mechanism that will allow a degree of ‘banking’.

0.5 g, or 4.9 m/s^2, is extreme. Non-tilting trains do not accelerate laterally at more than 1.2 m/s^2 in the plane of the track (i.e. after accounting for cant), and at high speed they have lower lateral acceleration, about 0.67 m/s^2 with limiting cases of about 0.8 for some tilting trains relative to the plane of the train floor. For example, the Tokaido Shinkansen has 200 mm of cant and maximum speed of 255 km/h on non-tilting trains on 2,500-meter curves, for 100 mm of cant deficiency, or 0.67 m/s^2.

The proposed relationship between curve radius and speed in the Hyperloop standards is for a lateral acceleration much greater than 4.9 m/s^2 in the horizontal plane: 480 km/h at 1,600 meters is 11.1 m/s^2. This only drops to 5 m/s^2 after perfectly canting the track, converting the downward 9.8 m/s^2 gravity and the sideways acceleration into a single 14.8 m/s^2 acceleration vector downward in the plane of the capsule floor, or 5 m/s^2 more than passengers are used to. This is worse than sideways acceleration: track standards for vertical acceleration are tighter than for horizontal acceleration, about 0.5-0.67 m/s^2, one tenth to one seventh what Musk wants to subject his passengers to. It’s not transportation; it’s a barf ride.

Even 4.9 m/s^2 in the horizontal plane is too much. With perfect canting, it combines with gravity to accelerate passengers downward by 11 m/s^2, 1.2 m/s^2 more than the usual, twice as high as the usual standards. Motion sickness is still to be fully expected in such a case. Transrapid’s 4.37 m/s^2, which adds 0.93 m/s^2 in the vertical component with perfect canting, is the limit of what’s possible.

Speaking of vertical acceleration, this gets no comment at all in the Hyperloop proposal. At 1,220 km/h, it is very hard to climb grades, which would require very tall viaducts and deep tunnels under mountains. Climbing grades is easy, but vertical acceleration is such that the vertical curve radius has to be very large. A lateral acceleration of 0.67 m/s^2 would impose a minimum vertical curve radius of 170 km, versus 15 km at 360 km/h HSR speed. Changing the grade from flat to 2% would take 3.4 km, and changing back would take the same, so for climbing small hills, the effective average grade is very low (it takes 6.8 km to climb 68 meters).

Nor does jerk get any treatment. Reversing a curve takes several seconds at the cant and cant deficiency of conventional HSR (about 3 seconds by Swedish standards, more by German ones); reversing a curve with the extreme canting levels of Hyperloop would take much longer. Maintaining comfort at high total equivalent cant requires tight control of the third derivative as well as the second one; see a tilting train thesis for references.

The barf ride that is as expensive as California HSR and takes as long door-to-door is also very low-capacity. The capsules are inexplicably very short, with 28 passengers per capsule. The proposed headway is 30 seconds, for 3,360 passengers per direction per hour. A freeway lane can do better: about 2,000 vehicles, with an average intercity car occupancy of 2. HSR can do 12,000 passengers per direction per hour: 12 trains per hour is possible, and each train can easily fit 1,000 people (the Tokaido Shinkansen tops at 14 tph and 1,323 passengers per train).

But even 30 seconds appears well beyond the limit of emergency braking. It’s common in gadgetbahn to propose extremely tight headways, presuming computerized control allowing vehicles to behave as if they’re connected by a rod. Personal rapid transit proponents argue the same. In reality, such systems have been a subject of research for train control for quite a while now, with no positive results so far. Safety today still means safe stopping distances. If vehicles brake at a constant rate, the safe headway is half the total deceleration time; if a vehicle brakes from 1,220 km/h to zero in 60 seconds, the average acceleration is more than 5 m/s^2, twice the current regulatory safety limit for passengers with seat belts.

Most of this could be chalked to the feeling of some entrepreneurs that they must reinvent everything. The indifference to civil engineering costs, passenger comfort issues, and signal safety could all be chalked to this. So could the FUD about earthquake safety of HSR on PDF-page 5.

However, one thing could not: the chart on PDF-page 9 showing that only the Hyperloop is energy-efficient. The chart has a train consuming nearly 900 megajoules per person for an LA-San Francisco trip, about as much as a car or a plane; this is about 1,300 kJ per passenger-km. This may be true of Amtrak’s diesel locomotives; but energy consumption for HSR in Spain is on average 73 Watt-hour (263 kJ) per passenger-km (see PDF-page 17 on a UIC paper on the subject of HSR carbon emissions), one fifth as much as Tesla claims. Tesla either engages in fraud or is channeling dodgy research about the electricity consumption of high-speed trains.

Indeed, a train with a thousand seats, 20 MW of power drawn, 60% seat occupancy, and a speed of 360 km/h can only ever expend 333 kJ per passenger-km while accelerating, and much less while cruising (acceleration at lower speed requires more energy per unit of distance, but cruising at lower speed expends only a fraction of the energy of full-power acceleration). Tesla’s train energy consumption numbers do not pass a sanity check, which suggests either reckless disregard for the research or fraud. I wouldn’t put either past Musk: the lack of references is consistent with the former, and the fact that Musk’s current primary endeavor is a car company is consistent with the latter.

There is no redeeming feature of Hyperloop. Small things can possibly be fixed; the cost problems, the locations of the stations, and the passenger comfort issues given cost constraints can’t. Industry insiders with ties to other speculative proposals meant to replace conventional rail, such as maglev, are in fact skeptical of Hyperloop’s promises of perfect safety.

It’s possible to discover something new, but people who do almost always realize the context of the discovery. If Musk really found a way to build viaducts for $5 million per kilometer, this is a huge thing for civil engineering in general and he should announce this in the most general context of urban transportation, rather than the niche of intercity transportation. If Musk has experiments showing that it’s possible to have sharper turns or faster deceleration than claimed by Transrapid, then he’s made a major discovery in aviation and should announce it as such. That he thinks it just applies to his project suggests he doesn’t really have any real improvement.

In math, one common sanity check on a result is, “does it prove too much?” If my ten-page paper proves a result that implies a famous open problem, then either my paper is wrong or I’ve proved the famous open problem, and it’s up to me to take extra care to make sure I did not miss anything. Most people in this situation do this extra step and then realize that they were subtly wrong. If a famous question could be solved in ten pages, it probably wouldn’t still be open. The same is even true in undergrad-level proof classes: if your homework answer proves things that are too strong, you’ve almost certainly made a mistake.

Musk’s real sin is not the elementary mistakes; it’s this lack of context. The lack of references comes from the same place, and so does the utter indifference to the unrealistically low costs. This turns it from a wrong idea that still has interesting contributions to make to a hackneyed proposal that should be dismissed and forgotten as soon as possible.

I write this not to help bury Musk; I’m not nearly famous enough to even hit a nail in his coffin. I write this to point out that, in the US, people will treat any crank seriously if he has enough money or enough prowess in another field. A sufficiently rich person is surrounded by sycophants and stenographers who won’t check his numbers against anything.

There are two stories here. In the less interesting one, Musk is a modern-day streetcar conspiracy mogul: he has a car company, he hopes to make money off of it in the future and uses non-generally accepted accounting to claim he already does, and he constantly trash-talks high-speed rail, which competes with his product. Since he’s not proposing to build Hyperloop soon, it could be viewed as clever distraction or FUD.

The more interesting possibility, which I am inclined toward, is that this is not fraud, or not primarily fraud. Musk is the sort of person who thinks he can wend his way from starting online companies to building cars and selling them without dealerships. I have not seen a single defense of the technical details of the proposal except for one Facebook comment that claims, doubly erroneously, that the high lateral acceleration is no problem because the tubes can be canted. Everyone, including the Facebook comment, instead gushes about Musk personally. The thinking is that he’s rich, so he must always have something interesting to say; he can’t be a huckster when venturing outside his field. It would be unthinkable to treat people as professionals in their own fields, who take years to make a successful sideways move and who need to be extremely careful not to make elementary mistakes. The superheros of American media coverage would instantly collapse, relegated to a specialized role while mere mortals take over most functions.

This culture of superstars is a major obstacle frustrating any attempt to improve existing technology. It more or less works for commercial websites, where the startup capital requirements are low, profits per employee are vast, and employee turnover is such that corporate culture is impossible. People get extremely rich for doing something first, even if in their absence their competitors would’ve done the same six months later. Valve, a video game company that recognizes this, oriented its entire structure around having no formal management at all, but for the most part what this leads to is extremely rich people like Bill Gates and Mark Zuckerberg who get treated like superstars and think they can do anything.

In infrastructure, this is not workable. Trains are 19th-century technology, as are cars and buses. Planes are from the 20th century. Companies can get extremely successful improving the technology somehow, but this works differently from the kind of entrepreneurship that’s successful in the software and internet sectors. The most important airline invention since the jet engine is either the widebody (i.e. more capacity) or the suite of features that make for low-cost flights, such as quick turnarounds. What Southwest and its ultra low-cost successors have done is precious: they’ve figured how to trim every airline expense, from better crew utilization to incentives for lower-transaction cost booking methods. This requires perfect knowledge of preexisting practices and still takes decades to do. The growth rate of Microsoft, Google, and Facebook is not possible in such an environment, and so the individual superstar matters far less than a positive corporate culture that can transmit itself over multiple generations of managers.

There is plenty of room for improvement in HSR technology, then, but it’s of a different kind. It involves adapting techniques used by low-cost airlines to reduce costs, as SNCF is doing right now with its new low-cost TGV product. It perhaps involves controlling construction costs more tightly, though $5 million per km for viaducts seems like an impossible fantasy. But it has to come from within the business, or from someone who intimately understands the business.

And with the kind of success that US media harps on, this is almost impossible to do domestically. Someone as smart as Musk, or any of many other Silicon Valley entrepreneurs, could find a detailed breakdown of the operating and construction costs of civil infrastructure, and figure out ways of reducing them, Megabus- or Southwest-style. That’s what I would do if I had the unlimited resources Musk has: I’d obtain unit costs at far greater detail than “X meters of tunnel cost $Y” and compare what New York is doing wrong that Madrid is doing right. But I don’t have the resources – in money, in ability to manage people, in time. And the people who do are constantly told that they don’t need to do that, that they’re smart enough they can reinvent everything and that the world will bow to their greatness.

Update: people all over the Internet, including in comments below, defend the low cost projections on the grounds that the system is lighter and thinner than your average train. The proposal itself also defends the low tunneling costs on those same grounds. To see to what extent Musk takes his own idea seriously, compare the two proposals: the first for a passenger-only tube, and the second for a larger tube capable of carrying both passengers and vehicles. On PDF-pp. 25-26, the proposal states that the passenger-only tube would have an internal diameter of 2.23 meters and the passenger-plus-vehicle tube would have an internal diameter of 3.3 meters, 47% more. Despite that, the tunneling costs on PDF-p. 28 are $600 and $700 million, a difference of just 17%.

The same is true of the “but the Hyperloop capsule is lighter than a train” argument for lower pylon construction costs. Together with the differences in tube thickness posited on PDF-p. 27, 20-23 mm versus 23-25, there is 60% more tube lining in the passenger-plus-vehicle version, but the tube and pylons are projected to cost just 24% more. In this larger version, the twin tube has 0.025*3.3*pi*2 = 0.5 cubic meters of steel per meter of length, weighing about 4 tons. This ranges from a bit less than twice to a bit more than twice the weight of a train. To say nothing of the pylons’ need to support their own considerable weight, which is larger than for HSR due to the need for taller viaducts coming from the constrained ability to change grade. They are far more obtrusive than trees and telephone poles, contra the claims of minimal obtrusiveness and disruption.

Update update (12/24): Hyperloop is in the news again; I’ve been getting a lot of pingbacks copying this article. You can read the plan here; the construction costs are now up from a laughable sub-$10 million per kilometer to $10-30 million, which is perfectly feasible if you’re building in flat terrain and if what you’re building is conventional rail and not a vactrain. There’s virtually no discussion of why the costs are so much lower, just an assurance that the team ran the numbers and that they’re looking into minimizing the costs of the construction material (costs that, for conventional HSR, are a small proportion of the total construction costs – concrete is cheap, it’s pouring it that’s expensive). On PDF-p. 19 of the new plan, the accelerations are explicitly stated to be 0.5 g in normal service, which the person heading the team trying to build it claims is not a barf ride in the article, but which is in reality is again worse than the acceleration felt by passengers on an airplane taking off. There already exists a mode of transportation that involves security theater, travel at 1,000 km/h, poor comfort, and motion sickness.

Quick Note: Why Quinn is Unfit to be Mayor

The Triboro RX plan calls for using preexisting freight rail rights-of-way with minimal freight traffic to build a circumferential subway line through the Bronx, Queens, and Brooklyn. It was mentioned as a possible project by then-MTA head Lee Sander and more recently by Scott Stringer and on The Atlantic Cities by Eric Jaffe. Despite not having nearly as much ridership potential as Second Avenue Subway or a future Utica subway, the presumed low cost of reactivating the right-of-way makes it a promising project.

According to Capital New York, leading mayoral contender Christine Quinn has just made up a price tag of $25 billion for Triboro, while claiming that paving portions of the right-of-way for buses will cost only $25 million. This is on the heels of city council member Brad Lander’s proposal for more investment in bus service. The difference is that Lander proposed using buses for what buses do well, that is service along city streets, and his plan includes bus lanes on major street and what appears to be systemwide off-board fare collection. In contrast, Quinn is just channeling the “buses are always cheaper than rail” mantra and proposing to expand bus service at the expense of a future subway line.

There is no support offered for either of the two cost figures Quinn is using, and plenty of contradictory evidence. Paving over rail lines for bus service is expensive; a recent example from Hartford and a proposal from Staten Island both point to about $40 million per km in the US. The map in the Capital New York article suggests significant detours away from the right-of-way, including on-street turns making the bus as slow as the existing circumferential B35 route, but also several kilometers on the railroad in Queens. Conversely, reusing rail lines for rail service is not nearly as expensive as building a subway. The MTA’s own biased study says a combined on-street and existing-right-of-way North Shore service would cost 65% more if it were light rail than if it were a busway; since the Triboro right-of-way is intact, the cost of service is in the light rail range, rather than the $25 billion for 35 km Quinn says.

But the reason Quinn is unfit for office rather than just wrong is the trust factor coming from this. She isn’t just sandbagging a project she thinks is too hard; the MTA is doing that on its own already. She appears to be brazenly making up outlandish numbers in support of a mantra about bus and rail construction costs. Nor has anyone else proposed a Triboro busway – she made the logical leap herself, despite not having any background in transit advocacy. Politicians who want to succeed need to know which advocates’ ideas to channel, and Quinn is failing at that on the transit front. If I can’t trust anything she says about transit, how can I trust anything she says about the effectiveness of stop-and-frisk, or about housing affordability, or about the consequences of labor regulations?

Update: Stephen Smith asked Quinn’s spokesperson, who cited a $21 billion figure for a far larger RPA plan including Second Avenue Subway and commuter rail through-running with new lines through Manhattan. I am not holding my breath for a retraction of the bus paving plan from the Quinn campaign.

Update 2: Quinn admitted the mistake on the rail plan, and revised the estimate of the cost down to $1 billion, but sticks to the bus plan and its $25 million estimate.

Quick Note: Why the Focus on Penn Station?

Penn Station is in the news again: the Municipal Art Society ran a public competition for a rebuilt station house, involving proposals by four different architectural firms. This does not include any track-level improvements at all: only the concourses and above-ground infrastructure are to be rebuilt, at a cost of $9.5 billion according to one of the four firms. The quotes from the architects and other backers of rebuilding use language like “great train station” and “gateway to the city,” and this is where the subtle hate of the city’s actual residents lies: why the focus on Penn Station? Why not a subway station?

The headline figure for the ridership at Penn Station is 600,000-650,000 a day, but this is a wild exaggeration. First, this includes both entries and exits, so the real number is half that. Second, about half of the number comes from subway riders, who these discussions always ignore. And third, there is a large number of passengers transferring between commuter rail and the subway who are doubled-counted; at subway stations, passengers transferring between lines are not even single-counted, since the subway counts entries at the turnstiles. Taking an average of boardings and alightings when both numbers are given or just boardings otherwise, Penn Station has 100,000 weekday LIRR riders, 80,000 weekday New Jersey Transit riders, and 170,000 weekday subway riders between the two stations. However, people transferring between the subway and commuter rail are double-counted.

In contrast, not counting any connecting passengers, there are 195,000 weekday Times Square subway riders. Without detailed data about transfer volumes at each station we can’t compare the two, but since the proposals for a better Penn Station focus only on the mainline station, the number of passengers served is certainly less than that of Times Square passengers.

Indeed, every single problem that the architects are trying to fix with Penn Station exists at Times Square. Times Square has low ceilings. The corridors between different lines and between the platforms and the exits are as labyrinthine as at Penn Station. In my experience rush hour passenger crowding levels within the station itself are comparable. Most platforms are wider, but nobody is proposing to widen platforms at Penn Station, and the 42nd Street Shuttle platforms are narrow and curvy and have been this way since 1918. The tickets are all integrated because the trains are all run by one operator, but again nobody who proposes to replace Penn Station is talking about the separate LIRR, NJ Transit, and Amtrak fiefs.

There are some legitimate changes that could be done if Penn Station is knocked down and rebuilt: instead of a hack involving paving over platforms to increase their width, the platform level could be rebuilt, two tracks at a time, with six approach tracks in each direction each splitting into two platform tracks, giving twelve tracks on six platforms; the train box appears about 140 meters wide, enough for 15-meter-wide platforms (compare 10 meters on the Chuo Line platform at Tokyo Station, where 28 trains per hour turn on two tracks).

However, the technical issues here are a lot less important than the fact that city leaders, architects, and even transit commentators assume that it is more important for New York to have a great train station used by 200,000 suburban commuters than for it to have a great subway station used by (at least) 200,000 city residents. It speaks to the utter hatred most city leaders have of the people who live in what they consider their fief or perhaps their playground. For most people in the city, there are more important transportation facilities, and even on a metro area level Penn Station isn’t unusually important.

This leaves the argument that Penn Station is a gateway to the city. But if the point is to impress a few thousand tourists, why not spend the same money on improving tourist amenities at Times Square, building more hotels? Or maybe building free housing for tens of thousands of homeless people (both the ones at Penn Station and the ones in the rest of the city) so that they stop being homeless and disturbing the rest of the population? If the point is to have great art, why not spend the money on employing artists to produce more work or to improve the aesthetics of the city’s ordinary spaces?

Of course, none of those options involves city leaders getting together and building important edifices with plaques with their names on them. So at the end the idea is to tax actual city inhabitants $10 billion to build a monument to the vision of city leaders. Large corporations pay their executives hundreds of millions a year in stock options and bonuses; governments cannot pay top political power brokers this way, so instead they spend large quantities of money on monuments that glorify them.

Infrastructure and Democracy

Two stories, one recent and one older, have made me think about the undemocratic way the US builds infrastructure. The older story is California HSR’s cost overrun coming from scope creep; the biggest overruns were in the Bay Area, where power brokers from different agencies wanted separate territory at stations, leading to additional tunnels and viaducts. The newer one is Long Island’s reaction to the MTA’s developing proposals to add Metro-North service to Penn Station, sharing the East River Tunnels with the LIRR and Amtrak; the reaction is negative on misinformed grounds, but the misinformation often comes from official sources.

In both cases, there’s a democratic deficit in US local government that’s in play. Swiss infrastructure projects require a referendum, and involve detailed benefits announced to the public. In Lucern, a recent urban tunnel was sold to the public on the grounds that it would enable certain clockface frequencies toward the south and southeast, such as a train every 15 minutes to Hergiswil and an hourly express train to Engelberg; the full cost was included in the referendum. Even much larger projects, such as the Gotthard Base Tunnel, are funded by referendum. Nothing of that sort happens in the US, even when there are referendums on infrastructure.

I’ve begun to believe that California’s original sin with its HSR project is that it refused to do the same. Prop 1A was a referendum for what was billed as one third of the cost, $10 billion. In reality it was $9 billion and $1 billion in extra funds for connecting local transit; in year of expenditure dollars the estimated budget then was $43 billion, so barely a fifth of the project’s cost was voted on. The HSR Authority planned on getting the rest of the money from federal funding and private-sector funding. Prop 1A even required a 1:1 match from an external source, so confident the Authority was that it would get extra money.

In reality, at the time the proposition was approved to go to ballot, the financial crisis hadn’t happened yet, and there was no talk of a large fiscal stimulus. Although the stimulus bill gave California $3 billion, in 2008 the HSR Authority couldn’t know this source of money would be available, and yet it assumed it would get $17-19 billion in federal funding. Likewise, no private investor was identified back then, and promises of foreign funding have been inconclusive so far and again only come years after the referendum. Put another way, Californians voted without any information about where 79% of the budget for HSR would come from. The state is now scrambling for extra funding sources, such as cap-and-trade revenues. Since there is no real dividing line between on-budget and off-budget when 79% of the budget is undetermined, costs could rise without controls. An agency that had lined $43 billion in prior funding via referendum would be too embarrassed by any cost increase requiring it to ask for more money from any source; a large cost increase could make the difference between project and no project.

In the Long Island case, there was of course no referendum – East Side Access and Metro-North’s Penn Station Access were both decided by the commuter rail agencies and the state legislature. However, even subject to the legislative decisions, there has been very little transparency about what’s going on. The MTA has provided scant details about service planning for after East Side Access opens: total tph counts for each terminal, but nothing about off-peak frequencies, nothing about which LIRR lines would have service to which terminal, and nothing about the frequency of each individual LIRR line. A major change, the end of through-service from east of Jamaica to Flatbush Avenue, is not explicitly mentioned; one has to read between the lines to see that there’s no service planned to Flatbush Avenue, which is planned to be connected to Jamaica by shuttle service (and the shuttle service is still not going to offer urban rail frequencies or fare integration with buses and the subway).

In this climate, it’s easy for people to disbelieve that the agencies involved know what they’re doing, even when they are. Penn Station Access is unpopular among Long Island politicians, who view the East River Tunnels as their turf and do not want to share with Metro-North. The MTA and New Jersey Transit keep saying that Penn Station is at capacity without further explanation, and the MTA says it will add Metro-North trains to Penn; is it any wonder that state legislators see those two statements and, in the context of past cost overruns, oppose Penn Station Access?

When there is democracy – by which I mean not just periodic elections offering two parties to choose from, but a referendum process, transparency, and community consultations – people have an incentive to be informed. It’s possible to sway many people in one’s community and have a positive effect on local state services. Local politicians who are informed on the subject will be able to lead spending and planning efforts and can count on the support of informed voters. In contrast, when there is democratic deficit, being informed is far less useful, because decisions are made independently of what people think unless they are power brokers, or perhaps wealthy, power-brokering communities.

Alexis de Tocqueville observed as much when he visited the US two hundred years ago, when it was already far more democratic, for white men, than any European country: American farmers were more informed about politics than their European counterparts. Today, everyone in the first world has democracy and universal franchise, with a few exceptional countries that are worse-run than people give them credit for. But on the local level, some countries have done much more and get rewarded with a system of accountability to the voters, leading to better governance. The US is trading on an unreformed political system, in which the check on local officials’ power comes from neighboring fiefdoms rather than from the people.

The feudal character of local government in the US is leading to the usual exasperation with the system. But instead of turning toward democracy, transit supporters cheer as governments turn toward absolutism, increasing the power of the state at the expense of other stakeholders. California is reforming its environmental protection laws in response to abuse of the system by powerful communities; in reality, one of the state legislators involved in the effort recently left politics to work for Chevron. A reformer at Cornell recently proposed to improve transportation governance by “[putting] a bipartisan committee in a locked room.” Thomas Friedman cheers Chinese megaprojects as a way to achieve progress and sustainability; he says nothing about the more cost-effective projects done democratically in Europe, even though they involve some equally impressive edifices like the Alpine base tunnels. Throughout the transit activist community, including nearly every blogger and commenter but also the main activists on the ground, there’s a tendency to view any community opposition to a project as NIMBYism and to ask for changes that make it easier for the government to get its projects done, as in the Robert Moses era. Social democrats and neo-liberals are equally complicit in the march for not just centralization, which can be done with democratic checks, but also concentration of power in the hands of state officials.

Good infrastructure does not come from autocrats. Nothing comes from autocrats except more wealth and power for the autocrats, which may or may not involve infrastructure that is useful to the public. Undemocratic systems lead to a feedback loop in which the people have no incentive to be informed while the power brokers have no incentive to make sure anyone is informed, and this way it’s easy to spend $8 billion on a train station and approach tracks, without knowing or caring how many orders of magnitude this is more expensive than the average first-world rail tunnel. A good transit advocate has to advocate for more democracy, transparency, and simplicity in government operations, because decisions made behind closed doors are almost invariably made for the benefit of the elite that’s on the right side of those doors.

The Magic Triangle: Infrastructure-Timetable-Rolling Stock

In the last month, Amtrak decided not to purchase additional Acela cars, but instead replace the Acela fleet ahead of time, and try to buy trains that aren’t compliant with FRA regulations. More recently, Amtrak and the California HSR Authority decided to bundle their orders together. The latter decision drew plenty of criticism from some good transit advocates, such as Clem Tillier, and even the former decision did. Clem explained,

The whole notion of buying quicker trains for the NEC is ridiculous– the existing Acela Express trains have plenty of oomph (16 kW/tonne) to do anything they need to do. “Lighter” and “faster” isn’t the key to anything on the NEC, and dropping in a higher-performance train will not lead to material trip time improvements. They need to speed up the slow bits first, which isn’t something you do by blowing money on trains.

Clem’s criticism got a fair amount of flak in comments, from me and others, for underestimating how important getting around FRA regulations is. What nobody said in comments, and I only realized after the discussion died out, is how the choice of rolling stock depends heavily on what Amtrak plans to do with infrastructure and service planning in the Northeast. It doesn’t make sense in any case to tether Amtrak’s plans for a corridor that’s in many ways globally unique to the California HSR Authority’s for a fairly standard HSR implementation. But what rolling stock is required, and thus how bad the tethering is, depends on a concrete plan for infrastructure and schedule.

At the highest level, the unique issue with the Northeast Corridor is that significant parts can’t be feasibly upgraded to more than 200-250 km/h or easily bypassed, while others can. This means that there’s a tradeoff between top speed and cant deficiency, and the optimal choice depends on how much investment there is into speeding up segments. In any case it’s critical to improve station throats, interlockings, and railroad junctions, but after the 50 and 100 km/h zones are dealt with, the remaining questions are still nontrivial.

The more money is invested, the less it makes sense to run a 270 mm-cant deficiency, 250 km/h Pendolino, and the more it makes sense to run a Talgo AVRIL or E5/E6, both of which are capable of 350 km/h but only about 180 mm of cant deficiency (or N700-I, which is on paper capable of 330 km/h and about 135 mm and in practice could probably be run at 360 km/h and 175 mm). If there’s one segment that tilts the decision, it’s New Haven-Providence: using the legacy Shore Line, even with heavy upgrades, limits speeds and favors high cant deficiency, while bypassing it on I-95 favors high top speeds. But even the New York-Washington segment of today has a few curves strategically located at the worst locations, which make higher tilt degree a benefit.

In medium-speed territory, the Pendolino versus E5/AVRIL/N700-I decision is the muddiest. I ran rough simulations on an upgraded New Haven Line, with bypasses including those I advocated as a first step but also additional ones in the more difficult Stamford-New Haven segment. A train with E5 cant deficiency and N700-I acceleration did New York-New Haven in 32 minutes, and a Pendolino with all cars powered did it in 30. Neither is a standard trainset, though the former is very close to standard (and the Talgo AVRIL is also quite close). The Pendolino as it is, with about half the cars powered, has low power by HSR standards, and this is a problem for accelerating back from a slow zone at medium speed. With all cars powered (which is feasible, at higher acquisition cost) it’s still far from turbocharged, but can change speed more easily. An off-the-shelf Pendolino would not beat an E5 or AVRIL or N700-I on such a corridor, and of course would not beat it south of New York or north of New Haven.

Since nonstandard trains cost more, it’s important to also decide whether they’re worth the cost. Bearing in mind that Amtrak said a new noncompliant trainset costs $35-55 million, which is above the range for 8-car trains (China pays about $4 million per 350+ km/h car), so it may already be factoring in a premium, paying more for trains is worth it whenever the benefits to passengers are noticeable enough. This, like choosing very high-speed rolling stock rather than a Pendolino, is the most effective at high levels of infrastructure investment. An off-the-shelf Pendolino is good enough for most applications. So is an off-the-shelf N700-I without tilt. It’s okay to be 15 minutes slower than the cutting edge if the cutting edge is too expensive. But the effect of 15 minutes on ridership is more pronounced if it’s the difference between 1:35 and 1:50 than if it’s the difference between 3:00 and 3:15. In addition, the faster the service is, the more revenue each train earns, and this allows spreading the extra acquisition cost among more passengers.

Another factor that’s neglected, at least in public statements, is the service plan. Amtrak service is heavily padded: the fastest northbound Acela is scheduled to do Providence-Boston in 47 minutes, but in the opposite direction it’s 34. Remove the Route 128 stop and this can get close to 30 or even below it. About the fastest trains can go with no schedule padding is 19.25 minutes, and reasonable but not onerous padding raises it to about 20.5. Clearly, more of the difference comes from operating efficiencies than from any speed raising; the Acela already goes 240 km/h between Providence and Boston and already has about 180 mm (7″) cant deficiency.

The limiting factor here is more MBTA ownership and operating culture. A good service plan would make it clear how trains can share the corridor (and the same is true on the New Haven Line, another unduly slowed commuter-owned segment), and because MBTA trains are so slow, any cooperation would involve public statements regarding upgrades to the MBTA. The Acela has level boarding at every stop except New London, which is the easiest to cut out and should be bypassed together with the rest of Shore Line East. It’s the MBTA that has non-level boarding, which remains one of the biggest schedule risks, requiring plenty of recovery time to deal with possible long dwell times coming from above-average crowds.

The problem is that Amtrak has made no statements regarding how to integrate the three legs of the magic triangle. It proposed the Vision plan, which even political transit bloggers like Ben Kabak note the extreme cost of; there’s no funding, and the first segment for which it’s trying to obtain funding, the Gateway Tunnel, is very far from the top priority for speed or even for intercity rail capacity. It now proposes new rolling stock, but is unclear about what the trains are supposed to do except be very fast. (Bundling with a new-build line like California makes sense only if all curves are straightened to a radius of 4+ kilometers, even extremely expensive ones.)

Perhaps it’s a feature of opaque government, that Amtrak refuses to say how much money it needs to meet each timetable and capacity goal. For example, it could say that if Congress gives it $10 billion it could reduce travel time from Washington to Boston from the present 6:45 to 5:45 while also running a peak of 4 long trains per hour at that speed. (I think for $10 billion it’s possible to get down to 3:30 or at worst 4:00, but this is a matter of cost control and not just transparency, though transparency can indirectly lead to better cost control.) This would involve heavy cooperation with the commuter railroads that share its tracks and joint plans, as well as detailed public plans for how much to spend on each segment and for what purpose. This is routine in Swiss rail infrastructure planning, since all major projects have to be approved by referendum, but does not happen in the US. It could be that Amtrak knows what it’s doing but acts like it doesn’t because the structure of government in the US is such that these decisions are made behind closed doors.

But more likely, Amtrak doesn’t know what it’s doing, and is just proposing new initiatives that make it seem forward-looking. Changing FRA rules is an unmixed blessing. Bundling an order with California HSR is not. The fact that Amtrak is doing so, while keeping mum about even what kind of rolling stock it thinks it needs, suggests that it reverses the usual way reform should be: instead of a need for reform producing good results and thence good headlines, a need to get good headlines about reform produces reform ideas that sound good. Some of those good-sounding ideas really are good, but not all are. It’s important for good transit advocates to distinguish the two both privately and publicly.

I feel like in the last two years, we’ve seen important American transit and railroad managers say correct things. Shortly after I started making noise in comments about New York’s outsized subway construction costs, Jay Walder said as much in a report entitled Making Every Dollar Count. Joe Lhota proposed through-running on commuter rail as a solution to improve efficiency. Scott Stringer, too, talked publicly about comparative construction costs, and for all of my criticisms of transit managers who say that, I thought it was enough for him to say that as a political candidate for a medium-term office to deserve my endorsement for the mayoral election, which he unfortunately bowed out of. The FRA proposed to start working on new rules for rolling stock last year. At Amtrak, we’ve just now seen Joseph Boardman propose noncompliant rolling stock. Perhaps I’d be more optimistic if Walder and Lhota had stayed at the MTA for longer to implement their positive reform ideas, instead of using it as a springboard to secure a higher-paying job or run for mayor, but increasingly it looks like the good reform talk is not generally accompanied by good actions.

This is, again, where good transit advocates can have the most influence. We more or less know which reforms are required and which are not. There are disagreements at times (Clem, for one, has much better credentials as a good transit activist than I do), but on most of the agenda items there’s agreement. We already know what details we might want to see from a good plan of action, and the advantage of this is that we can check proposed plans against them. That Amtrak’s gotten so many details wrong suggests that it still doesn’t know what the best practices for rail construction are, even if the basic idea of getting around FRA rules is sound. I wish I didn’t have to say it, but I’ll believe Amtrak’s improved when I see it.

Nobody Likes Riding North American Commuter Rail

In New York, two neighborhoods at the edge of the city have both subway and commuter rail service: Wakefield and Far Rockaway. Wakefield has 392 inbound weekday Metro-North boardings, and 4,955 weekday subway boardings. Far Rockaway has 158 riders (an average of boardings and alightings) and 4,750 subway boardings. Although both Wakefield and Far Rockaway are served by the 2 and A, which run express in Manhattan, those trains make many local stops farther out – in fact the 2 and A are the top two routes in New York for total number of stations – and are much slower than commuter rail: the 2 takes 50 minutes to get to Times Square while Metro-North gets to Grand Central within 25-30 minutes; the A takes about 1:05 to get to Penn Station, the LIRR about 55 minutes.

Vancouver, whose commuter rail service runs 5 daily roundtrips, all peak-hour, peak-direction, has a weekday ridership of 10,500. The Evergreen Line, duplicating the inner parts of the commuter rail service, is expected to get 70,000.

Caltrain, a service of intermediate quality between Vancouver’s peak-only trains and New York’s semi-frequent off-peak electrified service, has an intermodal station at Millbrae, which is now BART’s southern terminal. Millbrae has 5,970 BART exits per weekday versus 2,880 Caltrain boardings. And BART takes a circuitous route around the San Bruno Mountain and only serves San Francisco and the East Bay, while Caltrain takes a direct route to just outside the San Francisco CBD and serves Silicon Valley in the other direction.

The MBTA provides both subway and commuter rail service, with several intermodal stations: Forest Hills, Quincy Center, Braintree, Porter Square, Malden, JFK-UMass. In all cases, ridership levels on the subway are at least 30 times as high as on commuter rail. Rapid transit and commuter rail stations are close together at the edge of the Green Line’s D line, a former commuter line; the line’s outer terminus, Riverside, gets 2,192 weekday boardings, while the nearest commuter rail station, Auburndale, gets 301.

Across those systems and several more, such as Chicago’s Metra and Toronto’s GO Transit (no link, it’s private data), the commuter rail stations located within city limits, even ones not directly adjacent to a rapid transit station, usually get little ridership (there are some exceptions, such as Ravenswood on Chicago’s UP-N Line). The suburban stations beyond reasonable urban transit commute range are much busier.

Of course, this is just a North American problem. In Japan, where commuter rail and urban rapid transit are seamlessly integrated, people ride commuter rail even when the subway is an option. Consult this table of ridership by line and station for JR East lines in Tokyo: not only would any investigation of ridership on the main lines (e.g. Tokaido on PDF-page 1, Chuo on PDF-page 8) show that their ridership distribution is much more inner-heavy than in New York and Boston, but also stations with transfers to the subway can have quite a lot of riders. Nakano on the Chuo Line, at the end of Tokyo Metro’s Tozai Line, has 247,934 daily boardings and alightings, comparable to its subway traffic of 133,919 boardings.

Although my various posts about commuter rail industry practices focus partially on operating costs, this is not directly what makes people choose a slower subway over a faster commuter train. Rather, it’s a combination of the following problems:

1. Poor service to microdestinations. Rapid transit gets you anywhere; North American commuter rail gets you to the CBD. For people in Wakefield who are going anywhere but the immediate Grand Central or East 125th Street area, Metro-North is not an option. Station spacing is too wide, which means the choice of destinations even from a station that isn’t closed is more limited, and trains usually make just one CBD stop.

2. Poor transfers to other lines. The transfers usually require paying an extra fare and walking long distances from one set of platforms to another.

3. High fares. In the German-speaking world, and in Paris proper, fares are mode-neutral. It costs the same to ride the RER as the Metro, except for a handful of recent Metro extensions to the suburbs that postdate the RER, such as to La Defense. In Japan, JR East fares are comparable to subway fares, though there are no free transfers. In North America this is usually not the case: it costs much more to ride commuter rail than to ride a parallel subway or light rail line.

4. Low frequency. This is partly a result of low ridership based on the previous factors, partly a tradition that was never reformed, and partly a matter of very high operating costs. With low enough off-peak frequency (Wakefield and Far Rockaway are served hourly midday), commuter rail can achieve cost recovery similar to that of subways, and in some cities even surpass it. People who have no other options will ride hourly trains.

None of those problems is endemic to mainline rail. They’re endemic to North American mainline rail culture, and in some cases to labor practices. It’s all organization – it’s not a problem of either electronics or concrete, which means that the cost to the taxpayers of fixing it, as opposed to the political cost to the manager who tries to change the culture, is low.

The electronics and concrete do matter when it comes to building extensions – and this is where the ARC Alt G vs. Alt P debate comes from, among many others – but even commuter rail systems that do not need such extensions underperform. For example, Toronto does not need a single meter of commuter rail tunnel. Philadelphia, which already got most of the concrete it needs and partially fixed the microdestination problem, gets somewhat more commuter rail ridership in areas where people have alternatives, but frequency on the branches is still pitiful and inner-city stop spacing outside Center City is still too wide, leading to disappointing ridership.

Another way to think about it is that infrastructure should be used for everything, and not segregated into local transit and railroad super-highways that aren’t very accessible to locals. There are eight tracks connecting Manhattan directly with Jamaica, but the four used by the subway are far busier than the four used almost exclusively by suburbanites. Something similar is true of the Metro-North trunk, and some MBTA and Metra lines – the commuter rail infrastructure is redundant with rapid transit and gives very high nominal capacity, but in reality much of it is wasted. In this way, the mainline rapid transit concept including the Paris RER, the Germanic S-Bahn, and the Japanese commuter rail network, far outperforms, because it mixes local and regional traffic, creating service that everyone can use.

Washington Union Station

Amtrak’s announcement that it needs $7 billion to improve Union Station, in a way that is tangential to train or passenger capacity, has gotten some deserved flak already on other blogs. What I want to discuss instead is a pair of issues relating to capacity: passenger circulation, and track capacity. Especially on the latter, Union Station does have some problems, not at current traffic, but enough that future traffic increases may require difficult at-grade merges. The core of the problem is that the terminal tracks are located to the west of the through-tracks, with an at-grade junction, rather than between them.

Fortunately, the passenger circulation capacity issue is easier. Although Amtrak claims 100,000 passengers use the station every day, in reality the number is beefed up with Metro riders, similarly to Penn Station’s 600,000 daily passengers statistic, of which nearly half is subway ridership. Total ridership on MARC and VRE is 53,000 per weekday, and Amtrak has a total of 13,000 boardings and alightings per day there (not per weekday, but intercity traffic does not have the weekday peak of commuter traffic). This is 66,000 boardings and alightings, assuming every MARC and VRE trip begins or ends at Union Station. In contrast, on just two tracks with ordinary subway platforms, Metro has 34,000 boardings at the station; page 13 of Amtrak’s announcement shows the relative scale of Metro and mainline infrastructure. The mainline half of the station’s ridership is passengers who are likelier to be carrying luggage or not be local, but the main difference between it and the Metro half is that the Metro half is using Metro turf and the mainline half is using the station above which Amtrak’s headquarters is located.

If there is a problem, it comes from Amtrak’s practice of corralling riders at waiting points, instead of letting them filter onto the platforms or the stations whenever they like, as is done every day on trains in France and Germany, or on the less busy stations of the Northeast Corridor. Stephen Smith tells me that unlike in New York or Boston, where the waiting areas are at least adjacent to the platform and the problem is one of having just one access point (or just one official access point in New York), in Washington there is another antechamber between the passengers and the train. An extra 100 meters of walking adds about a minute of travel time in a congested space, and perhaps 45 seconds in a clear one; Amtrak’s current practice adds multiple minutes to door-to-door travel time, and also forces pedestrian congestion once it clears passengers to access the platform.

Adding access points is also a good thing, but that does not cost $7 billion, and does not require redoing the entire main concourse. But possibly the most important thing to do in the near term is making all platforms high, also nowhere near a $7 billion project; the diagrams on Amtrak’s announcement suggest all terminal tracks and most through-tracks will be high-platform, but one through-platform will remain low.

Now, track capacity is where things get more interesting, because potentially there is a problem, coming from terminal layout. A not very clear, but public, diagram can be found here: look for Washington Union Terminal, and within it, Interlockings C (the outer station throat and a nearby yard), K (the inner throat and the actual tracks), and A (the connection from the through-tracks to First Street Tunnel). Note that terminating tracks 7-20 are to the west of through-tracks 22-29, and the junction is at grade, which represents a problem for easy cookie-cutter planning.

The operationally simplest but most expensive to deal with this is to build a grade separation. If it’s anything like Harold, expect a $300 million price tag. At present and expected levels of traffic, this is overkill.

I claim that if MARC and VRE trains continue to terminate at Union Station, no special work is needed: Brunswick and Camden Line traffic can be segregated on tracks 7-9 (and the turnaround capacity, easily about 12 tph for 3 tracks, is more than those lines will need between them), VRE traffic can be segregated on tracks 24-25, and Penn Line traffic can use the same tracks as the terminating intercity trains.

The only at-grade conflict would be between northbound trains originating at Washington, and southbound ones continuing through to Virginia, and even high possible traffic levels (say, 12 tph terminating including the Penn Line sprawled across 11 tracks of which 3 already have long platforms and arguably 3 more can be lengthened, 2 tph through across 4 tracks) can be scheduled in a similar manner to all-terminating stations, treating the through-trains as terminating trains that have to use specific tracks and have no limit on dwell time.

Specifically, because Penn Line (or local HSR) trains would leave immediately after express HSR trains to reduce the number of required overtakes, at worst we’d have trains originating at :00 and :02, repeating every 10 minutes, and then there’s an 8-minute window within which to schedule southbound through-trains.

So instead let us assume commuter trains run through, in which case we may as well assume they have good reliability so that they can be scheduled with 2-minute headways. Current peak traffic is 3 tph Brunswick, 2 tph Camden, 3 tph Penn, and lower combined traffic on the Virginia side. Assume that peak traffic will grow to 3 tph Brunswick and Camden and 6 tph combined Penn and through-HSR; in fact the most potential for growth is off-peak, and because multiple platforms are very long, long trains may be used if there are capacity problems.

We now have 6 tph terminating HSR, 6 tph through-traffic on the Penn Line (including HSR), and 6 tph through-commuter traffic on the Camden and Brunswick Lines; Camden and Brunswick are physically to the west of the Northeast Corridor, and so in addition to conflicts between terminating and through trains, we have conflicts between through-Camden/Brunswick and southbound through-Penn/HSR.

In this situation, we can have southbound terminating HSR and through-Penn/HSR trains clearing the throat at :00 and :02 again. Northbound terminating HSR trains have to depart 2 minutes after the arrival of southbound through-Penn/HSR trains, e.g. :04, and then northbound through-Camden/Brunswick trains can depart between :06 and :08; northbound through-Penn/HSR trains are always to the east of everything else and so do not conflict with anything.

Because southbound through-Camden/Brunswick trains conflict with terminating trains, they can be scheduled at the same time as northbound through-trains of some kind, which constrains the symmetry axis we choose but is otherwise workable. For example, if Camden/Brunswick trains both depart and arrive at :07 then with the terminating trains arriving :00 and departing :04, we have a symmetry axis ending in a 2 or a 7 (and through-Penn/HSR trains would arrive and depart at :02). But then the terminating trains also arrive just before the through-Penn/HSR trains and depart just after, implying they are slower or else there would be an overtake just north of the station. We can instead switch the trains – and then terminating trains arrive and depart :02, and through-Penn/HSR arrive southbound :00 and depart northbound :04. Note that there is no conflict between northbound terminating trains and southbound through-trains.

So it is possible to do this without extra infrastructure beside longer and level-boarding platforms, which are cheap. Let us finish by seeing what extra trains can be scheduled into the above 18 tph schedule. Scheduling 6 tph of terminating trains is easy: trains arriving :04 and departing :00, the opposite of the terminating HSR trains discussed above, will be adequately separated. The problem then is just the need to overtake the :02 through-trains along the tracks; however, at such a level of demand, 18 tph combined HSR and commuter on the Northeast Corridor, full four-tracking there would be necessary anyway.

But no extra through-traffic can be realistically scheduled into the same timetable, because the southbound :04 trains would conflict with the northbound :04 terminating trains. Changing the schedule so that it’s the terminating trains that arrive and depart at the same time is, however, possible: since we’re four-tracking the entire Baltimore-Washington line at this stage, we can have terminating trains arrive and depart :02, Camden/Brunswick trains do the same :07, and through-Penn/HSR trains arrive and depart :00 and :04. That said, this means it’s impossible to schedule more than 6 terminating tph into Union Station; I believe it’ll be easier to fill all those extra intercity trains into Washington than fill 18 tph going from Washington toward Virginia, both intercity and commuter.

Of course, the traffic levels discussed here are all very high, especially for HSR. An HSR system that fills even 6 tph is one that can pay for future capacity increases out of operating profits. The importance should be getting a starter system with reasonable capacity for the next few years and then build capacity projects as required, with immediate construction done only on the most critical segments or those that would be hard to reconstruct with more future traffic.

So we’re back to the question of what needs to be done with Union Station, and the answer is hardly anything. It’s not even Moynihan Station, which is also sold as a bigger transportation benefit than it is, but is at least billed as a grand station to be named after a politician more than anything (and is only about $1.5 billion). It’s even worse than Gateway and the Market East station, which would have positive transportation value, and are just very cost-ineffective. It’s not solving any problem for the foreseeable future; it’s just using big numbers about current traffic and growth to scare people into thinking more capacity is needed, and mostly it’s using small increases in track capacity to justify throwing billions of dollars on beautifying Amtrak’s headquarters.