Quick Note: Regional Rail and the Massachusetts State Legislature

The Massachusetts state legislature is shrugging off commuter rail improvements, and in particular ignoring calls to spend some starter money on the Regional Rail plan. The state’s climate bill ignores public transportation, and an amendment proposing to include commuter rail electrification in the plan has been proposed but not yet included in the plan. Much of the dithering appears to be the fault of one politician: Will Brownsberger, who represents Watertown, Belmont, Back Bay, and parts of Brighton.

What is Regional Rail?

Regional Rail is a proposal by TransitMatters to modernize the MBTA commuter rail network to align it with the standards that have emerged in the last 50-60 years. The centerpiece of the plan is electrification of the entire network, starting from the already-wired Providence Line and the short, urban Fairmount Line and inner Eastern Line (Newburyport/Rockport Lines on timetables).

Based on comparable projects in peer countries, full electrification should cost $0.8-1.5 billion, and station upgrades to permit step-free access should cost on the order of $2 billion; rolling stock costs extra upfront but has half the lifecycle costs of diesels. An investment program on the order of high hundreds of millions or very low billions should be sufficient to wire the early-action lines as well as some more, such as the Worcester Line; one in the mid-single digit billions should be enough to wire everything, upgrade all stations, and procure modern trains.

Benefits include much faster trips (see trip planner here), lower operating and maintenance costs, higher reliability, and lower air and noise pollution and greenhouse gas emissions. For a city the size of Boston, benefits exceed costs by such a margin that in the developed world outside North America, it would have been fully wired generations ago, and today’s frontier of commuter rail electrification is sub-million metro areas like Trondheim, Aarhus, and Cardiff.

Who is Will Brownsberger?

Brownsberger is a Massachusetts state senator, currently serving as the Senate’s president pro tempore. His district is a mix of middle-class urban and middle-class inner-suburban; the great majority of his district would benefit from commuter rail modernization.

He has strong opinions on commuter rail, which are what someone unaware of any progress in the industry since roughly 1960 might think are the future. For example, here’s a blog post he wrote in 2019, saying that diesel engines are more reliable than electric trains because what if there’s a power outage (on American commuter rail systems that operate both kinds of vehicles, electric trains are about an order of magnitude more reliable), and ending up saying rail is an outdated 20th century concept and proposing small-scale autonomous vehicles running on the right-of-way instead. More recently, he’s told constituents that rail electrification with overhead wire is impossibly difficult and the only option is battery-electric trains.

Because he’s written about the subject, and because of his position in the State Senate and the party caucus, he’s treated as an authority on the subject. Hence, the legislature’s lack of interest in rail modernization. It’s likely that what he tells constituents is also what he tells other legislators, who follow his lead while focusing on their own personal interest, such as health policy, education policy, taxes, or any other item on the liberal policy menu.

Why is he like this?

I don’t know. It’s not some kind of nefarious interest against modernization, such as the trenchant opposition of New York suburbanites to any policy that would make commuter trains useful for city residents, who they look down on. Brownsberger’s district is fairly urban, and in particular Watertown and Belmont residents would benefit greatly from a system that runs frequently all day at 2020s speeds and not 1920s speeds. Brownsberger’s politics are pretty conventionally liberal and he is interested in sustainability.

More likely, it’s not-invented-here syndrome. American mainline passenger rail is stuck in the 1950s. Every innovation in the field since then has come from outside North America, and many have not been implemented in any country that speaks English as its primary language. Brownsberger lacks this knowledge; a lifetime in politics does not lend itself well to forming a deep web of transnational relationships that one can leverage for the required learning.

Without the benefit of around 60 years of accumulated knowledge of French, German, Swiss, Swedish, Dutch, Japanese, Korean, Austrian, Hungarian, Czech, Turkish, Italian, and Spanish commuter rail planning, any American plan would have to reinvent the wheel. Sometimes it happens to reinvent a wheel that is round and has spokes; more often, it invents a wheel with sharp corners or no place to even attach an axle.

When learning happens, it is so haphazard that it’s very easy to learn wrong or speculative things. Battery-electric trains are a good example of this. Europe is currently experimenting with battery-electric trains on low-traffic lines, where the fact that battery-electrics cost around double what conventional electric multiple units do is less important because traffic is that light. The technology is thus on the vendors’ mind and so when Americans ask, the vendors offer to sell what they’ve made. Boston is region of 8 million people running eight- and nine-car trains every 15 minutes at rush hour, where the places in Europe that experiment with battery tech run an hourly three-car train, but the without enough background in how urban commuter rail works in Europe, it’s easy for an American agency executive or politician to overlook this difference.

Is there a way forward?

Yes!

Here is a proposed amendment, numbered Amendment 13, by Senator Brendan Crighton. Crighton represents some of the suburbs to the northeast of Boston, including working-class Lynn and very posh Marblehead; with only four years in the State Senate and three in the Assembly, he’s not far up the food chain. But he proposed to require full electrification of the commuter rail network as part of the climate bill, on a loose schedule in which no new diesels may be procured after 2030, and lines would be electrified by 2028 (the above-named early action lines) to 2035 (the rest of the system). There are so far four cosponsors in addition to Crighton, and good transit activists in Massachusetts should push for more sponsorship so that Amendment 13 makes it into the climate package and passes.

EU Reaches Deal for Eastern European Infrastructure Investment

EU Commission President Ursula von der Leyen announced this morning that the EU will proceed with a coordinated investment plan for Ukraine, whose EU membership is a foregone conclusion at this point, as well as for surrounding EU member states. This will include a cohesion fund for both war reconstruction and long-term investment, which will have a component marked for Belarus’s incorporation into the Union as well subject to the replacement of its current regime with a democratic government.

To handle the infrastructure component of the plan, an EU-wide rail agency, to be branded Eurail, will take over the TEN-T plan and extend it toward Ukraine. Sources close to all four major pro-European parties in the EU Parliament confirm that the current situation calls for a European solution, focusing on international connections both internally to the established member states and externally to newer members.

The office of French President Emmanuel Macron says that just as SNCF has built modern France around the TGV, so will Eurail build modern Europe around the TEN-T network, with Paris acting as the center of a continental-scale high-speed rail network. An anonymous source close to the president spoke more candidly, saying that Brussels will soon be the political capital of an ever closer economic and now infrastructural union, but Paris will be its economic capital, just as the largest city and financial center in the United States is not Washington but New York and that of Canada is not Ottawa but Toronto.

In Eastern Europe, the plan is to construct what German planners have affectionately called the Europatakt. High-speed rail lines, running at top speeds ranging between 200 and 320 km/h, are to connect the region as far east as Donetsk and as far northeast as Tallinn, providing international as well as domestic connections. Regional trains at smaller scale will be upgraded, and under the Europatakt they will be designed to connect to one another as well as to long-distance trains at regular intervals.

For example, the main east-west corridor is to connect Berlin with Kyiv via Poznań, Łódź, Warsaw, Lublin, Lutsk, and Zhytomyr. Berlin-Warsaw trips are expected to take 2.5 hours and Warsaw-Kyiv trips 3.5 hours, arranged so that trains on the main axis will serve Warsaw in both directions on the hour every hour, timing a connection with trains from Warsaw to Kaunas, Riga, Tallinn, and Helsinki and with domestic intercity and regional trains with Poland. In Ukraine, too, a connection will be set up in Poltava, 1.5 hours east of Kyiv, every hour on the hour as in Warsaw, permitting passengers to interchange between Kyiv, Kharkiv, Dnipro, and Donetsk.

Overall, the network through Poland, Ukraine, and the Baltic states, including onward connections to Berlin, Czechia, Bucharest, and Helsinki, is expected to be 6,000 km long, giving these countries comparable networks to those of France and Spain. The expected cost of the program is 150 billion euros plus another 50 billion euros for connections.

How to Spend Money on Public Transport Better

After four posts about the poor state of political transit advocacy in the United States, here’s how I think it’s possible to do better. Compare what I’m proposing to posts about the Green Line Extension in metro Boston, free public transport proposals, federal aid to operations, and a bad Green New Deal proposal by Yonah Freemark.

If you’re thinking how to spend outside (for example, federal) money on local public transportation, the first thing on your mind should be how to spend for the long term. Capital spending that reduces long-term operating costs is one way to do it. Funding ongoing operating deficits is not, because it leads to local waste. Here are what I think some good guidelines to do it right are.

Working without consensus

Any large cash infusion now should work with the assumption that it’s a political megaproject and a one-time thing; it may be followed by other one-time projects, but these should not be assumed. High-speed rail in France, for example, is not funded out of a permanent slush fund: every line has to be separately evaluated, and the state usually says yes because these projects are popular and have good ROI, but the ultimate yes-no decision is given to elected politicians.

It leads to a dynamic in which it’s useful to invest in the ability to carry large projects on a permanent basis, but not pre-commit to them. So every agency should have access to public expertise, with permanent hires for engineers and designers who can if there’s local, state, or federal money build something. This public expertise can be in-house if it’s a large agency; smaller ones should be able to tap into the large ones as consultants. In France, RATP has 2,000 in-house engineers, and it and SNCF have the ability to build large public transport projects on their own, while other agencies serving provincial cities use RATP as a consultant.

It’s especially important to retain such planning capacity within the federal government. A national intercity rail plan should not require the use of outside consultants, and the federal government should have the ability to act as consultant to small cities. This entails a large permanent civil service, chosen on the basis of expertise (and the early permanent hires are likely to have foreign rather than domestic experience) and not politics, and yet the cost of such a planning department is around 2 orders of magnitude less than current subsidies to transit operations in the United States. Work smart, not hard.

However, investing in the ability to build does not mean pre-committing to build with a permanent fund. Nor does it mean a commitment to subsidizing consumption (such as ongoing operating costs) rather than investment.

Funding production, not consumption

It is inappropriate to use external infusions of cash for operations and, even worse, maintenance. When maintenance is funded externally, local agencies react by deferring maintenance and then crying poverty whenever money becomes available. Amtrak fired David Gunn when the Bush administration pressured it to defer maintenance in order to look profitable for privatization and replaced him with the more pliable Joe Boardman, and then when the Obama stimulus came around Boardman demanded billions of dollars for state of good repair that should have built a high-speed rail program instead.

This is why American activists propose permanent programs – but those get wasted fast, due to surplus extraction. A better path forward is to be clear about what will and will not be funded, and putting state of good repair programs in the not-funded basket; the Bipartisan Infrastructure Framework’s negotiations were right to defund the public transit SOGR bucket while keeping the expansion bucket.

Moreover, all funding should be tied to using the money prudently – hence the production, not consumption part. This can be capital funding, with the following priorities, in no particular order:

  • Capital funding that reduces long-term operating costs, for example railway electrification and the installation of overhead wires (“in-motion charging“) on bus trunks.
  • Targeted investments that improve the transit experience. Bus shelter is extremely cost-effective on this point and a federal program to fund it at a level of around $15,000/stop (not more – it’s easy to make local demands that drive it up to $50,000) would have otherworldly social rates of return. Washington bureaucrats are loath to be this explicit about what to do – they try to speak in circumlocutions, saying “standards for bus stops” instead of just funding shelter, or “transit asset management” instead of just committing to not playing the SOGR game.
  • Accessibility upgrades. This require close federal control to eliminate local waste, because much of the money would be going to New York, which has a long-term problem of siphoning accessibility money to other priorities like adding station access points or repairing stations, and has a uniquely incompetent local environment when it comes to construction costs.
  • Planning aid for improving bus-rail interface; these two modes are often not planned together in American cities, and commuter rail is not planned in conjunction with other modes. San Jose, for example, has a proposal for large expansion of bus service, part of which is parallel to Caltrain; the local agency, VTA, owns one third of Caltrain and could expand rail service within the county and integrate it with bus service better, but does not do so.
  • Rail automation, to reduce long-term operating costs. Bus automation could go in this bucket too but is at this point too speculative; save it for one or two stimuli in the future.

Avoiding local extraction

Local government has very little democratic legitimacy. It’s based on informal power arrangements, in which direct elections play little role; partisan elections are rare and instead primaries reign with severe democratic deficits (for example, it’s hard to form any kind of base for opposition to challenge a sitting New York mayor or governor). Without national ideology to guide it, it is the domain of cranks and people with the time and leisure to attend community meetings on weekdays at 3 pm. Local community takes its illegitimate power and thieves what others create, whether it is the market or the state.

Recognizing this pattern means that federal funding should not under any circumstances coddle local arrangements. If, for example, California cannot spend money cost-effectively because it is constrained by referendum, federal funding can be used to bypass this system, but never work under its rules. If the local business community is traumatized by cut-and-cover construction in the distant past, the feds should insist that subway money that they give will be used for cut-and-cover instead of mined stations.

The typical surplus extraction pattern concerns car dominance. State DOTs are in effect highway departments; transit planning is siloed, usually at separate agencies. They use their power to demand the diversion of transit money to roads. For example, in Tampa, a plan to increase bus service led to a DOT demand to pave the routes with concrete lanes at transit agency expense (with federal or state transit funding). The list of BRT projects that were just highway widenings is regrettably too long. The feds should actively demand to keep transit funding for transit, and not roads, social services, policing, or other priorities.

In particular, the feds should give money for some bus improvements, but demand that agencies prioritize the bus over the car. No bus lanes? No signal priority? No money. Similarly, they should demand they engage in internal efficiency measures like stop consolidation and all-door boarding with proof of payment ticket collection, which a larger and more expert FTA can give technical assistance for.

It may also be prudent to give transitional resources, up to a certain point. Funding private-sector retraining for workers displaced by automation is good, and in some limited cases public-sector retraining, as long as it doesn’t turn into workfare (there is no way for the subway in New York to absorb redundant conductors or surplus maintenance staff). If moderate amounts of capital funding are required for bus improvements, such as traffic signal upgrades to have active control and conditional TSP, then they are good investments as well.

Conclusion

Funding public transportation is useful, provided there is enough of a connection between the source of funds and the management thereof that the money is not wasted. A larger and more technocratic federal government is an ideal organ for this, with enough planning power to propose bus network redesigns, rail planning, integrated fare systems, and intermodal coordination. It can and should have technical priorities – shelter is far and away the lowest-hanging fruit for American bus systems – and state them clearly rather than hiding behind bureaucratic phrases (again, “transit asset management” is a real phrase).

It’s fundamentally an investment rather than consumption. And as with all investments, it’s important to ensure one invests in the right thing and the right people. A local transit agency with a track record of successful projects, short lead times from planning to completion, technical orientation, and the ability to say no to highway departments and other organs that extract surplus is a good investment. One that instead genuflects before antisocial groups that launch nuisance lawsuits is not so good an investment, and funding for such an agency should be contingent on improvement in governance of the kind that will make local notables angry.

No Federal Aid to Transit Operations, Please

This is the third in a series of four posts about the poor state of political transit advocacy in the United States, following posts about the Green Line Extension in metro Boston and free public transport proposals, to be followed by an Urban Institute report by Yonah Freemark.

In the United States, political transit activists in the last few years have set their eyes on direct federal aid for operating subsidies for public transport. Traditionally, this has not been allowed: federal aid goes to capital planning (including long-term maintenance), and only a small amount of money goes to operations, all in peripheral bus systems. Urban transit agencies had to operate out of fares and local and state money. Demands for federal aid grew during corona, where emergency aid to operations led to demands for permanent subsidies, and have accelerated more recently as corona recovery has flagged (New York’s subway ridership is only around 60% of pre-corona levels). But said demands remain a bad idea in the short and long terms.

In the early 20th century, when public transport was expected to support itself out of fares, operating costs grew with wages, but were tempered by improvements in efficiency. New York City Transit opened with ticket-takers at every subway entrances and a conductor for every two cars; within a generation this system was replaced with automatic turnstiles and one conductor per train. Kyle Kirschling’s thesis has good data on this, finding that by the 1930s, the system grew to about 16,000 annual car-miles (=26,000 car-km) per employee.

And then it has stagnated. Further increases in labor efficiency have not happened. Most American systems have eliminated conductors, often through a multi-decade process of attrition rather than letting redundant workers go, but New York retains them. The network today actually has somewhat less service per employee than in the 1930s, 14,000 car-miles as of 2010, because fixed costs are spread across a slightly smaller system. Compare this with JICA’s report for Mumbai Metro comparing Japanese cities: Tokyo Metro has 283,871,000 car-km (PDF-p. 254) on 8,474 employees (PDF-p. 9), which is 33,500/employee, and that’s without any automation and with only partially conductor-less operations; Yokohama gets 40,000.

Moreover, the timeline in the US matches the onset of subsidies, to some extent: state and local subsidies relieved efficiency pressure. In Canada, TTC saw this and lobbied against subsidies for its own operations in the 1960s, on the grounds that without a breakeven mandate, the unions would capture all surplus; it took until the 1970s for it to finally receive any operating subsidies.

Federal subsidies make all of this worse. They are other people’s money (OPM), so local agencies are likely to maximize them at the expense of good service; this is already what they do with capital money, lading projects with local demands for betterments figuring that if everyone else hogs the trough then they should as well.

Then there is the issue of wages. Seniority systems in American unionized labor create labor shortages even when pay is high, because of how they interact with scheduling and tiered wage structures. Bus drivers in Boston earn around $80,000 a year, a pay that German bus and train drivers can only dream of, but starting drivers are in probational status and have a lower wage (they are not even given full-time work until they put in a long period of part-time work). Moreover, because drivers pick their shifts in seniority order, drivers for about the first 10 years are stuck with the worst shifts: split shifts, graveyard shifts at inconsistent intervals, different garages to report to. New York manages to find enough bus drivers to fill its ranks but only by paying around $85,000 a year; other American cities, paying somewhat less, are seeing thousands of missed runs over the year because they can’t find drivers.

And outside aid does nothing to fix that. Quite to the contrary, it helps paper over these problems and perpetuates the labor gerontocracy. New York City Transit has learned to react to every crisis by demanding a new source of income; there is not enough political appetite for transparent taxation, so the city and state find ever more opaque sources of funds, avoiding political controversy over wanton inefficiency but creating more distortion than a broad income tax would.

Instead of subsidizing current consumption, a developmental state should subsidize production. Don’t pay money to hire more bus drivers; pay for automating subway systems, for better dispatching, for better planning around intermodal integration. Current American wages, not to mention the unemployment rate, scream “invest in labor-saving technology” and not “expand labor-intensive production.”

Free Public Transport: Why Now of All Times?

This is the second in a series of four posts about the poor state of political transit advocacy in the United States, following a post about the Green Line Extension in metro Boston, to be followed by the topics of operating aid and an Urban Institute report by Yonah Freemark.

There’s a push in various left-wing places to make public transportation free. It comes from various strands of governance, advocacy, and public transport, most of which are peripheral but all together add up to something. The US has been making some pushes recently: Boston made three buses fare-free as a pilot program, and California is proposing a three-month stimulus including free transit for that period and a subsidy for car owners. Germany is likewise subsidizing transport by both car and public transit. It’s economically the wrong choice for today’s economy of low unemployment, elevated inflation, and war, and it’s especially troubling when public transport advocates seize upon it as their main issue, in lieu of long-term investments into production of transit rather than its consumption.

Who’s for free public transit?

Historically, public transit was expected to be profitable, even when it was publicly-run. State-owned railroads predate the modern welfare state, and it was normal for them to not just break even but, in the case of Prussia, return profits to the state in preference to broad-based taxes. This changed as operating costs mounted in the middle of the 20th century and competition with cars reduced patronage. The pattern differs by country, and in some places (namely, rich Asia), urban rail remained breakeven or profitable, but stiff competition bit into ridership even in Japan. The norm in most of the West has been subsidies, usually at the local or regional level.

As subsidies were normalized, some proposed to go ahead and make public transport completely free. In the American civil rights movement, this included Ted Kheel, a backer of free public transit advocates like the activist Charles Komanoff and the academic Mark Delucchi. Reasons for free transit have included social equality (since it acts as a poll tax on commuters) and environmental benefits (since it competes with cars).

Anne Hidalgo has attempted and so far failed to find the money for free public transport in Paris, and other parts of Europe have settled for deep discounts in lieu of going fully fareless: Vienna charges 365€ for an annual pass (Berlin, which breaks even on the U-Bahn as far as I can tell, does so charging 86€/month).

In the United States, free transit has recently become a rallying cry for DSA, where it crowds out any discussion of improvement in the quality of service. Building new rail lines is the domain of wonks and neoliberals; socialists call for making things free, in analogy with their call for free universal health care. Boston has gotten in on the act, with conventional progressive (as opposed to DSA) mayor Michelle Wu campaigning on free buses within the municipality and getting the state-run MBTA to pilot free buses on three routes in low-income neighborhoods.

What’s wrong with free transit?

It costs money.

More precisely, it costs money that could be spent on other things. In Ile-de-France, as of 2018, fare revenues including employer benefits amounted to 4 billion euros, out of a total budget of 10.5 billion. The region can zero out this revenue, but on the same budget it can expand the Métro network by around 20-25 km a year – and the Métro is as far as I can tell profitable, subsidies going to suburban RER tails and buses. For that matter, the heavy subsidies to the suburbs, which pay the same cheap monthly rate as the city, could be replaced with investment in more and better lines.

The experiments with actually-free transit so far are in places with very weak revenues, like Estonia. Some American cities like it in context where public transport is only used by the desperate and no attempt is made at making service attractive to anyone else. Boston is unique in trying it in a context with higher fare revenue – but the buses are rail feeders, so the early pilot piggybacks on this and spends relatively little money in lost revenue, ignoring the long-term costs of breaking the (limited) fare integration between the buses and the subway.

What’s wrong with free transit now?

Free transit as deployed in the California proposal is in effect a stimulus project: the government gives people money in various ways. Germany is doing something similar, in a package including 9€ monthly tickets, a 0.30€ fuel tax cut, and a cut in energy taxes.

In Germany, unemployment right now is 2.9% and core inflation (without food and energy) is 3%. This is a country that spent a decade thinking going over 2% was immoral, and now the party that considers itself the most budget hawkish is cutting fuel taxes, in a time of conflict with an oil and gas exporter and a rise in military spending.

In the United States, unemployment is low as well, and inflation is high, 6.4%. This is not the time for stimulus or investments in consumption. It’s time for investments in production and suppression of consumption. So what gives?

The Green Line Extension

This is what I hope to be the first in a series of four posts about the poor state of political transit advocacy in the United States, to be followed by posts about free transit, operating aid, and an Urban Institute report by Yonah Freemark.

The Green Line Extension in Boston opened on Monday. Or, at least, the Union Square branch did; the main line to Tufts is expected to open in a few months. I rode it with Marco Chitti in the afternoon, a few hours after the formal opening ceremony. It was incomplete, with some access points not yet open, and the station fare barriers not yet functional (ticket receipts are checked by staff). There were many railfans on the platforms taking photos, and we accidentally let the first arriving train go because of a misunderstanding over whether it was in service; at least during the first day, it was not yet intended for a general audience.

Bostonians seem to view the extension as a great success. The media’s tone is celebratory. I no longer remember what local New York media said when Second Avenue Subway opened at the beginning of 2017, but I think it was more sober, more reflective of its high costs (I was getting a lot of followers on Twitter, but I tweeted that I was looking for work in the field around that day and got a lot of boosts over that). Within a year of SAS’s opening, Brian Rosenthal’s article appeared, detailing the mess that led to the line’s $1.7 billion/km cost. And as far as I can tell, there’s no comparable look at GLX in Boston.

This is not for lack of material. The Transit Costs Project began as a case study of how GLX got so expensive – it cost $2.2 billion not including rolling stock for a total length of 7.6 km. For a subway, it’s somewhat above global average. But it’s a light rail line with a short elevated segment and the rest in existing commuter rail trenched rights-of-way.

The line isn’t even especially good for the cost. It’s still incomplete. The fare payment is especially messy. The CharlieCard system used in Boston is a legacy mid-2000s system, which the MBTA wants to replace with something called AFC 2.0 (Charlie being AFC 1.0); it gave the contract to American transit agencies’ favorite military contractor, Cubic, which recently said it’s going to have a multi-year delay because it’s prioritizing New York’s Omny contract, and there’s nothing Massachusetts can do about it. When GLX value-engineered the stations, it was expected AFC 2.0 would be done by now, so there was no need for AFC 1.0-compatible fare barriers. It isn’t, so station staff stand in front of the platform directing passengers to tap their cards to get paper receipts. Going fareless at just this station for a short period is looked down on because it’s in a rich neighborhood and it may be discriminatory.

And as far as I can tell, nobody in Boston is asking “how can we make sure it will never happen again?”. The criticism I see in the media is about gentrification; Union Square has been gentrified for at least 10 years, but local politicians like Ayanna Pressley are using the line as an opportunity to make social criticism and impose even more political restrictions, so that future lines will be even kludgier and more expensive.

The MBTA is not always like this. Small projects do not have a large cost premium in Boston. Commuter rail infill stations, designed in-house, have a cost premium over Berlin in the 1.5x area. But the MBTA lacks in-house capacity to manage larger projects; GLX is beyond its capacity, so the original project was stuck and ballooned to $3 billion, and Governor Charlie Baker restarted it as a special-purpose vehicle, rather like Crossrail, with an externally-hired project manager in John Dalton. This mirrors the other transit megaproject in the region, South Coast Rail, currently clocking around $3.4 billion for 77 km of commuter rail in existing rights-of-way, a cost in line with German greenfield high-speed rail with considerable tunneling. No in-house hires were made, and now it seems that Dalton will be let go to take his experience elsewhere; the next MBTA megaproject will start from zero.

And as far as I can tell, nobody is pointing out this pattern. Baker and his political appointees are certain that their method works, because they are ignorant of global best practices. They are not exposed to ideas outside the US, except maybe in the most globalized parts of Britain and other high-cost English-speaking countries; a European who speaks to them like a typical European does – that is, without any pretension that Americans are better people – will just never get through.

In fact, they are failures. Not Dalton, who made the project better (but who is still unemployable anywhere with low costs; Milan Metro has its own in-house team, thank you very much). But Baker, who led the privatization of the state as budget director in the Weld era 30 years ago, must be viewed as the primary villain. His secretary of transportation for much of this period, Stephanie Pollack, must be viewed in a similar way: she does not believe it is possible to compare different projects, perhaps because the ones she is involved with are deficient. People should point at them and laugh on the street and perhaps yell at them for wasting government money with their failed ideology.

The second villain, after the state capacity destroyer that is Baker, consists of Governor Deval Patrick, who let the project balloon. He did not rebuild state capacity; he instead instructed the MBTA to accept the demands of every community that wanted something – in this case, Somerville and its demand for premium-cost bike paths (“Somerville Community Path”) and oversize stations. Pressley is an heir to this tradition; unless she changes her tune, it will be best for infrastructure if she is ignored, or better yet defeated for reelection.

Right now, I do not see any political group in the Boston area that is interested in making things better. High costs to them are just “it’s our turn to hog the trough.” This has implications for federal funding: the feds should choke funding to the region if it stays like this.

The G Train

The G train is bad. I say this, 16 years after I moved to New York, 11 years after I left, and I know it’s what every New Yorker knows. Tourists walk too slowly, rent is too high for small apartments, and the G train sucks. What I want to highlight in this post is how the subway’s scheduling paradigm is especially bad for the G train and leads to a vicious cycle making the train less frequent and less useful for passengers.

The role of the G train

The G train is the only mainline subway service in New York that does not enter Manhattan; see map here. It connects what are now the region’s two largest non-Manhattan business centers, Long Island City and Downtown Brooklyn, running vaguely parallel to the East River on the Queens and Brooklyn side of it. To the south of Downtown Brooklyn, it has a tail serving the wealthy neighborhoods collectively called South Brooklyn, such as Carroll Gardens and Park Slope.

I’ve criticized the G before for its poor construction. It misses critical transfers, like the other lines built in the IND program in the 1920s-30s. In Queens it misses Queensboro Plaza and the transfer to the N/W trains on the Astoria Line, and in Brooklyn it misses every single non-IND line except the L (and, at a suboptimal location, the R). This already makes it less useful as a circumferential line – such lines live on convenient transfers to radial lines, because direct O&D service is less valuable to secondary destinations than to primary ones.

But what I realized last week, commuting from Long Island City to Downtown Brooklyn, is more delicate. My hotel was near Queensboro Plaza, which the G doesn’t serve, but the station is served by the 7, which connects to the G one stop away at Court Square; Marron’s new office is in Downtown Brooklyn right on top of the Jay Street station, on the IND-built A/C and F trains, which is either a cross-platform connection or a short walk from the G. So for my trip, the connections worked. And yet, I was regularly facing 10-minute waits on the shoulders of rush hour, and on the subway countdown clock I saw a 15-minute gap.

To explain what went so wrong that the G should have such low frequency at 10 in the morning, it’s necessary to explain how New York City Transit decides the frequency of each service during each time of day.

New York City Subway frequency

In New York, the system for deciding the frequency of each subway service at each time of day is based on average peak crowding. This means that for all trains using the service in a given time period, the crowding level at the peak crowding point of the journey is averaged; frequency is adjusted so that off-peak the peak crowding level is 125% of seated capacity, and at rush hour it is based on published standing capacity per car that works out to about 300% of seated capacity depending on car design.

This system is done per numbered or lettered service. Thus, for example, the 2 and 3 trains run on the same track most of the way, but where they diverge, the 2 is considerably busier, and therefore the 2 runs slightly higher frequency (most ridership on the 2 and 3 is on the shared segment, not the tails). As a result, on the shared trunk, there cannot be perfect alternation of 2 and 3 trains; a few times an hour, a 2 train is followed by another 2 train, which means that on the tail, the frequency is uneven. When two 2 trains follow each other with no 3 between them, the leading 2 train is more crowded than the trailing one; this variation is averaged out in the guidelines – it is not the busiest train that sets the frequency guidelines.

These guidelines are not a good way to timetable trains. The above example of how it can create uneven crowding on the 2 is one problem with this system; if instead there were regular alternation of 2 and 3 trains then the 2 would be persistently slightly more crowded than the 3, just as today there is uneven crowding whenever two 2 trains run with no 3 in between, but the frequency on both the shared trunk and the branches would be more regular. This is especially important on more complexly interlined parts of the network, where the current system leads to large programmed gaps between trains occasionally.

The G is not very heavily interlined; the issue there relates to another criticism of the guidelines, which is that they assume travel demand is fixed. If the ridership on a train is independent of frequency, which it is if the headway between trains is very short compared to the trip time (say, if the trains run every 2-3 minutes), then the sole purpose of service is to provide the capacity the passengers need, and so the guidelines make sense as a way of rationing service convenience. However, in reality, the elasticity of ridership with respect to service provision is not zero. Three years ago I did some analysis of New York’s situation and the existing literature on ridership-frequency elasticity, suggesting it is equal to about 0.4. So the low frequency of the G deters ridership, which then appears to justify the low frequency.

But 0.4 < 1. And I believe that there are two reasons why on the G, and on circumferential lines in general, the elasticity of ridership with respect to frequency should be higher.

Trip length

Circumferential lines in general tend to have shorter average trip time. Between two nearby spokes, say between Downtown Brooklyn and Williamsburg, they are the only real option; between two farther away ones, a direct radial may be an alternative.

The G is different from (say) the Ringbahn in that it misses most transfers, but this should not impact this pattern too much. The missed transfers in Downtown Brooklyn weaken the G for short as well as long trips involving a connection there. In contrast, in the middle the G does make the most important transfer, that with the L, and only misses the weaker J/M/Z.

The 0.4 estimate for ridership elasticity with respect to frequency assumes average behavior for trip length. But if trips are shorter, then the impact of frequency is larger. The 0.4 estimate comes out of an estimate of about -0.8 of ridership with respect to generalized trip time, which includes in-vehicle time, walk time, and wait time, the latter two given extra weight to account for transfer penalty. If one of the three components of trip times is shortened, the other two grow in importance.

The role of options

The G is not usually passengers’ only choice for making the trip. They can connect in Manhattan, or, in some cases, go directly via Manhattan, for example taking the N or R from Downtown Brooklyn to Queens (in the opposite direction, they serve separate station so it’s a harder choice, leading to asymmetric demand). Going between Marron and the East Village, Eric Goldwyn could connect to the L via the A/C/F or the G; I never once saw him use the G, only the lines via Manhattan.

I have not seen the impact of different transit paths on demand elasticity in the literature. It is likely that the elasticity in such case must be higher, because it is standard in economics that demand is more elastic for goods sold on a competitive market than by a monopolist.

Note also that it is to the overall system’s benefit to convince passengers to switch from radial lines to the G. The G is less crowded, so such a switch distributes ridership better on the system. And the G starts out much less frequent, so that even on a fixed operating budget, the impact of a service increase on the G on ridership is larger than on an already frequent trunk.

How High-Speed and Regional Rail are Intertwined

The Transit Costs Project will wrap up soon with the report on construction cost differences, and we’re already looking at a report on high-speed rail. This post should be read as some early scoping on how this can be designed for the Northeast Corridor. In particular, integration of planning with regional rail is obligatory due to the extensive track sharing at both ends of the corridor as well as in the middle. This means that the project has to include some vision of what regional rail should look like in Boston, New York, Philadelphia, and Washington. This vision is not a full crayon, but should have different options for different likely investment levels and how they fit into an intercity vision, within the existing budget, which is tens of billions thanks to the Bipartisan Infrastructure Framework.

Boston

In Boston, commuter rail and intercity rail interact via the Providence Line, which is double-track. The Providence Line shares the same trunk line into Boston with the Franklin Line and the Stoughton Line, and eventually with South Coast Rail services.

The good news is that the MBTA is seriously looking at electrifying the trains to a substantial if insufficient extent. The Providence Line is already wired, except for a few siding and yard tracks, and the MBTA is currently planning to complete electrification and purchase EMUs on the main line, and possibly also on the Stoughton Line; South Coast Rail is required to be electrified when it is connected to this system anyway, for environmental reasons. If there is no further electrification, then it signals severe incompetence in Massachusetts but is still workable to a large extent.

Options for scheduling depend on how much further the state invests. The timetables I’ve written in the past (for an aggressive example, see here) assume electrification of everything that needs to be electrified but no North-South Rail Link tunnel. An NSRL timetable requires planning high-speed rail in conjunction with the entirety of the regional rail system; this is true even though intercity trains should terminate on the surface and not use the NSRL tunnel.

Philadelphia

Philadelphia is the easiest case. Trenton-Philadelphia is four-track, and has sufficiently little commuter traffic that the commuter trains can be put on the local tracks permanently. In the presence of high-speed rail, there is no need for express commuter trains – passengers can buy standing tickets on Trenton-Philadelphia, and those are not going to create a capacity crunch because train volumes need to be sized for the larger peak market into New York anyway.

On the Wilmington side, the outer end of the line is only triple-track. But it’s a short segment, largely peripheral to the network – the line is four-track from Philadelphia almost all the way to Wilmington, and beyond Wilmington ridership is very low. Moreover, Wilmington itself is so slow that it may be valuable to bypass it roughly along I-95 anyway.

The railway junctions are a more serious interface. Zoo Interlocking controls everything heading into Philadelphia from points north, and needs some facelifts (mainly, more modern turnouts) speeding up trains of all classes. Thankfully, there is no regional-intercity rail conflict here.

Washington

In some ways, the Washington-Baltimore Penn Line is a lot like the Boston-Providence line. It connects two historic city centers, but one is much larger than the other and so commuter demand is asymmetric. It has a tail behind the secondary city with very low ridership. It runs diesel under catenary, thanks to MARC’s recent choice to deelectrify service (it used to run electric locomotives).

But the Penn Line has significant sections of triple- and quad-track, courtesy of a bad investment plan that adds tracks without any schedule coordination. The quad-track segment can be used to simplify the interface; the triple-track segment, consisting of most of the line’s length, is unfortunately not useful for a symmetric timetable and requires some strategic quad-track overtakes. The Penn Line must be reelectrified, with high-performance EMUs minimizing the speed difference between regional and intercity trains. There are only five stations on the double- and triple-track narrows – BWI, Odenton, Bowie State, Seabrook, New Carrollton – and even figuring differences in average speed, this looks like a trip time difference between 160 km/h regional rail and 360 km/h HSR of about 15 minutes, which is doable with a single overtake.

New York

New York is the real pain point. Unlike in Boston and Washington, it’s difficult to isolate different parts of the commuter rail network from one another. Boston can more or less treat the Worcester, Providence+Stoughton, Fairmount, and Old Colony Lines as four different, non-interacting systems, and then slot Franklin into either Providence or Fairmount, whichever it prefers. New York can, with current and under-construction infrastructure, plausibly separate out some LIRR lines, but this is the part of the system with the least interaction with intercity rail.

Gateway could make things easier, but it would require consciously treating it as total separation between the Northeast Corridor and Morris and Essex systems, which would be a big mismatch in demand. (NEC demand is around twice M&E demand, but intercity trains would be sharing tracks with the NEC commuter trains, not the M&E ones; improving urban commuter rail service reduces this mismatch by loading the trains more within Newark but does not eliminate it.)

It’s so intertwined that the schedules have to be done de novo on both systems – intercity and regional – combined. This isn’t as in Boston and Washington, where the entire timetable can be done to fit one or two overtakes. This isn’t impossible – there are big gains to be had from train speedups all over and there. But it requires cutting-edge systems for timetabling and a lot of infrastructure investment, often in places that were left for later on official plans.

Quick Note: the LaGuardia Transit Connector

It’s amazing how much good can happen when an obstacle like Andrew Cuomo is removed. In lieu of his backward air train proposal, hated by just about everyone not on his payroll, Governor Kathy Hochul is moving forward on a better set of alternatives for a mass transit connection to LaGuardia. It’s interesting to see what the process is looking at but also what it isn’t; so far this looks better than the alternatives analysis for Interborough Express (ex-Triboro).

So far I have not seen analysis, only drawings of 14 alternatives. As with the IBX study, the LGA plan distinguishes different modes of public transit – there are bus, light rail, subway, and even ferry options. But it doesn’t stop there. It looks at multiple alignments: the scope is how to connect LGA to the rest of the city the best, and this can be done from a number of different directions – even a backward train (as light rail) along an alignment similar to Cuomo’s is present, and will likely not advance further because of its circuitous route.

Among the 14 alternatives, I think the obviously best one is a subway extension (slide 12 above); another subway option, a branch following the Grand Central Parkway (slide 11), is inferior because of branching splits frequencies and ridership at the cut off Astoria-Ditmars Boulevard station is high. A subway extension promises a connection in around 30 minutes to Times Square, every 5 minutes all day, with good connections to other destinations via the transfers at Queensboro Plaza and in Midtown.

The one thing that I’m sad the analysis hasn’t looked at is intermediate stations. It’s around 4.5 km from Ditmars to the main LGA terminal along the proposed alignment, passing through redevelopable industrial land and through residential land in Astoria Heights awkwardly tucked between airport grounds and Astoria proper. The same quality of service that the airport could get, these neighborhoods could get as well, except a hair faster because they’re closer.

Extending the Astoria Line is especially useful since it is short and not especially crowded until it hits Queensboro Plaza and inherits the crowding of the 7 train and its riders. In the context of deinterlining the subway, this is especially valuable: right now 60th Street Tunnel carries the N and W from Astoria but also the R from Queens Boulevard, and under deinterlining the tunnel would carry only Astoria riders, and so to match the high demand to 60th Street it’s valuable to create as much ridership as possible on the Astoria Line past Queensboro Plaza.

I hope that the alternatives analysis considers multiple stopping patterns in the future – that is, not just a nonstop route from Ditmars to the airport, but also an option with intermediate stations. (This does not mean local and express trains – either all trains should run locals, or all should run nonstop.) The cost of those stations is not high as it’s an elevated line, and the stop penalty on the subway is less than a minute since the top speed is so low (it looks like 45 seconds in practice comparing local and express trains on the same line).

Penn Station Tracks

In 2015, I argued that New York Penn Station should be replaced with a hole in the ground, and such a station would have sufficient capacity. I will defend those posts: in the 21st century, elaborate stations are not required for high-quality rail service, and it’s more important to have good passenger egress and intermodal connections than a signature station. The topic of this post is more niche: which rail lines should connect to Penn Station?

The three-line system

In all writing I’ve done on the subject since around 2010, I’ve assumed that Penn Station should be a three-line stations. In blog posts about regional rail for New York I’ve consistently called them Lines 1, 2, and 3; one map can be found in this post, with slightly less expansive version on Google Maps, and, consistently, Line 1 (red) is the existing Northeast Corridor, Line 2 (green) runs along the same route but uses the Gateway tunnel across the Hudson and then goes via Grand Central, and Line 3 (orange) connects the Empire Connection to the LIRR via a slightly realigned approach, otherwise using existing tracks.

At the station, their order from south to north is 2, 1, 3; the numbers are chronological (1 preexists, 2 is a higher priority to build than 3). Gateway is to enter Penn Station south of the existing tunnel and the room for a Grand Central connection is to the south (31st Street), forcing that line to be the southernmost. The East River Tunnels go under 32nd and 33rd, each as a track pair going in opposite directions rather than 32nd running eastbound and 33rd westbound, and the track pair under 33rd has a better connection to the LIRR while that under 32nd has a better connection across the Hudson; the Empire Connection loops under the Hudson tunnel to connect to southern tracks, but that’s a single-track link and needs to be doubled anyway, so it might as well be realigned.

With three lines and six approach tracks, Penn Station should have 12 platform tracks: each approach track should split into two and the two tracks should serve the same platform, a solution used for the expensive but operationally sound Stuttgart 21 project. There should not be any flexibility, save perhaps some emergency crossovers at the station, not to be used in service: the required throughput is so extensive that such flexibility is fake, reducing capacity by almost as much as the full closure of a track.

The footprint of the station looks around 155 meters wide gross, or around 145 net, corresponding to 24 per platform. The total width of the tracks is 1.7 (track center to platform) plus 4.5 (distance between track centers; Shinkansen regulations say 4.3) plus around 2 if a safety zone between each track pair is desired, which is a total of about 8 meters. The platform width is then 24 – 8 = 16. If a heavy column between two tracks adjacent to different platforms is required, this adds about another meter to maintain the safety zones, for a total of 9, resulting in 15-meter platforms.

15-meter platforms are extremely wide. Châtelet-Les Halles’s RER A and B platforms are 17 meters, and are wider than necessary; they in contrast have insufficient vertical circulation at rush hour. At 15 meters, there’s room for six escalators per access point and possibly also a staircase; at 16, there’s definitely room for the staircase. Six escalators can run without any rush hour variation, always three up and three down, and would still clear a full train with many standees in a minute. I do not foresee any capacity problems at the station if it is built this way.

But this leads to the question: since the platforms are so oversize, perhaps it is useful to have more of them at lower width?

The four-line system

Penn Station could potentially serve not three lines but four. Right now it only has infrastructure for a line and a half, and with Gateway it would have one and two halves; even three looks like a generational project. But there’s good cause to think even farther ahead and make room for a fourth line: a dedicated intercity railway. The four-line system would maintain Lines 1, 2, and 3 as above, but then add an unnumbered line with no regional trains, only intercity train.

This comes out of my ridership model for high-speed rail for the United States: at full buildout, the system would be difficult to fit into an approach track with regional trains, and regional trains would only be able to run every 5 minutes or even worse, rather than every 2 or 2.5. Moreover, once high-speed rail exists on the Northeast Corridor, the return on investment on extensions is so great that it is likely that such extensions will happen. Politics make such extensions even more favorable: high-profile investment in the Northeast’s intercity rail and in New York is likely to lead to demand for such investment in other regions, regardless of the business case, and it is fortunate that the business case for such extensions is strong independently of the politics.

I presume that, from south to north, the platform order should be Line 2 eastbound, Line 2 westbound, intercity eastbound, Line 1 eastbound, Line 1 westbound, intercity westbound, Line 3 eastbound, Line 3 westbound. The problem here is that Penn Station’s footprint is only adjacent to three east-west streets, not four, and so the intercity tunnels have to duck under private property, and the best place for them going east is to act as 31.5th and 32.5th Streets. Using the existing tunnels and then displacing regional rail to new tunnels is also possible, but less desirable: the existing tunnels have small diameter, and so it’s easier to keep them lower-speed while the new tunnels get to be bigger and support 200 km/h while maintaining enough free air to avoid creating pressure problems in passengers’ ears.

Under this system, the existing footprint of Penn Station is wide enough for 18 meters gross per each of the eight platforms, or 10 meters net. This is not out of the question, and would ordinarily be completely fine: it’s enough for four escalators per access point, or three and a staircase. At Penn Station I am slightly squeamish purely because on Lines 1 and 3 it’s the only city center station, and thus more crowded than the usual for a regional train station.

But it’s possible to slightly widen the footprint. Under no circumstances should there be any digging past the footprint of 31st and 33rd Streets: the cost of construction under existing buildings is too high. Plans for demolishing the block between 30th and 31st Streets (Block 780) are in an advanced stage, related to both a real estate deal with Vornado and plans for Penn Station South expansion, but they are extraordinarily expensive (around $10 billion at this point), and redevelopment of the block is easier on firma than over rail tracks. For all intents and purposes, the maximum usable footprint is between the lot lines of 31st and 33rd, which is 175 meters gross, perhaps 160 net with some distance between the dig and the lot line.

With 160 net meters, there are 20 meters per platform with tracks, or 12 per platform alone. This is wide enough for anything: four escalators and a staircase fit, which has enough capacity (albeit with some compromises) with permanent escalator directionality and more than enough if escalators run three-and-one at rush hour.

The benefits of creating about two extra meters per platform should be weighed against the cost of adding to the footprint of Penn Station, which is not $10 billion but also not zero, and I don’t want to make pronouncements without seeing a reliable estimate. This also depends on the difficulty of building intercity rail tunnels under private property.

Coordinated planning

A coordinated Penn Station rebuild plan should be considered together with some plan for how to use those tracks. Infrastructure investment must always come with a precise service plan, with sample timetables to the minute shared with the public for democratic review.

The upshot is that Penn Station rebuild must come with a good idea of how much service the region expects to run. A high-speed rail plan argues in favor of the four-line system, provided the cost of the extra tunnels is reasonable (low-to-mid single-digit billions; $10 billion is far too high). Otherwise, the three-line system is better.